PROFESSIONAL EXPERIENCE

Senior Planner/Scheduler

Confidential

Responsibilities:

  • Consult wif Construction Team to write Method Statement for WBS
  • Plan, Schedule and update work on Tie Ins. Update Daily activities for Plant Upgrade inP6.
  • Update Weekly Progress on Terminal Upgrade.
  • Coordinate weekly meeting wif client for progress measurement. Manage Construction plan and report and mitigate Variance
  • Received and analyzed progress reporting from Subcontractors, and report any concerns proactively
  • Interfaced wif Subcontractors, Construction Managers, each Discipline Managers and Turnover managers to analyze progress
  • Assist Project Controls to coordinate interface between on - going operations and construction wifin teh existing site at Elba Island plant.
  • Coordinate activities of modifications to teh existing Elba facilities will include compression for vapor handling and new pumps for loading teh LNG on vessels for export
  • Operate P6 and MS Project/Excel to monitor and analyze progress

Senior Planner/Scheduler EPC

Confidential

Responsibilities:

  • Detailed EPC schedule for polyethylene Plant Construction including Civil, Mechanical,Structural, Piping, Electrical& Instrumentation
  • Managed teh project schedule for Mitsubishi’s involvement in teh biggest polyethylene plant in teh world involving 2,000 workers (3.2 million man-hours) at site and 250 engineers (700,000 man-hours) during teh engineering stage.
  • Received and analyzed progress reporting from Subcontractors, and report any concerns proactively
  • Interfaced wif Subcontractors, Construction Managers, each Discipline Managers and Turnover managers to analyze progress
  • Participated in teh regular meetings wif Subcontractors and discuss teh key performance index
  • Participated in teh major meetings wif Subcontractors and discuss progress measurement system to enable quick recovery to variance from plan to actual
  • Operate P6 and MS Project/Excel to monitor and analyze progress
  • Developed Progress Reporting to client and home office both in unit measurement and physical progress reporting.
  • Assisted Project Control Manager to forecast teh overall project schedule
  • Developed catch up plan when delay needs to be recovered
  • Consulted wif Project Director to find teh deviation between planned and actual activities including bottlenecks in teh schedule. Took mitigation measures, coordinating wif sub-contractors and client and utilizing teh contract standpoint.

Senior Scheduler/Planner (Contract)

Confidential

Responsibilities:

  • Worked on detailed EPC Project schedule using Primavera Version 7.0 for Project portfolio management, which included Engineering, Procurement and Construction.
  • Detailed analysis of schedule wif over 2800 activities to monitor and report progress as planned.
  • Detailed schedule Analysis and effective improvement methodology.
  • Develop a detailed resource-loaded schedule using activity coding and logic sequencing
  • Created and maintained detailed engineering schedules based on teh WBS, wif task definitions, dependencies and relationships.
  • Planned, developed and maintained several schedules of identified activities in a logic based schedule program while supervising 3 lower-level Project Controls schedulers using Primavera P6
  • Management of Vessel Operational Activities for Arctic Challenger
  • Lead teh client and internal controls on Project planning Management meetings.
  • Planned and scheduled teh Chemical Injection System, choke manifolds and ESD Valves
  • Detailed analysis of impact of Water Test solution
  • Developed work breakdown structures (WBS) and worked closely wif teh engineering team to prepare schedules Create plan for Deployment test
  • Produce early / late planned progress curves, manpower histograms for Operational Readiness training
  • Prepare and review cost reports wif explanation of variances to management and client
  • Coordinate subcontractor’s schedules, import and track look ahead plans and manage defaults
  • Planned activities for dry-dock of vessel

Senior Scheduler/Planner

Confidential

Responsibilities:

  • Worked on detailed EPC Project schedule using Primavera Version 8.2 and Oracle Business suite for Project portfolio management which included Procurement, Transportation Management, Shipping Logistics, Order management and warehouse management for Global planning and Systems Integration for intercontinental activity updates on project progress.
  • Maintained Gas Processing and compression Plant detailed schedule each wif over 3500 activities.
  • Worked on Demobilization to put project to completion.
  • Build Proposal Project Schedule, including logic, critical path float, resource loading, weighting
  • Produce early / late planned progress curves, manpower histograms
  • Analyzed critical path activities and delays in rescuing teh Project from Litigation
  • Reorganize and maintained several schedules of identified activities in a logic based
  • Detailed management of client and operational module to ensure necessary information is distributed accordingly
  • Provide client and project management wif detailed information in regards to project progress Coordinate schedule activity update wif Site manager and Project Manager
  • Build Proposal Project Schedule, including logic, critical path float, resource loading, weighting
  • Produce early / late planned progress curves, manpower histograms
  • Monitor contract performance and assist teh board wif teh management of contract files and database.
  • Perform risk analysis, present solutions, and perform quality review on contracts and agreements.
  • Enter data and perform clean up, document review, database indexing, and legal research.
  • Develop Configuration Management tools, templates and processes. Conduct presentations using PowerPoint.
  • Perform Data analysis and providing Data architecture solutions for project implementation
  • Reviews status reports prepared by project personnel and modify schedules and plans as required.
  • Coordinates vendor activities by monitoring and tracking vendor deliverables and commitments.
  • Communicates project status and risks while keeping management, clients, and others informed of project status and related issues.
  • Confers wif project personnel to provide technical advice and issue resolution.
  • Coordinates, responds and assesses requests for changes from original scope of project or initiative.
  • Monitors and measures project results against technical specifications and requirements

Scheduler/Planner (Contract)

Confidential

Responsibilities:

  • Worked on drilling project, 260 tons of steel work fabrication and detailed welding on ABS standard.
  • Developed work breakdown structures (WBS) and worked closely wif teh engineering team to prepare schedules.
  • Created and maintained detailed engineering schedules based on teh WBS, wif task definitions, dependencies and relationships.
  • Schedule welding activities for four tanks replacing steel of 260tonns in total.
  • Coordinate teh schedule for replacement of Anodes and gussets
  • Schedule welding activity for teh 3 legs of teh Rig from Elevation 400” to 257” on 11” apart
  • Planned, developed and maintained several schedules of identified activities in a logic based schedule program while supervising 3 lower-level Project Controls schedulers using Primavera P6
  • Coordinate schedule activity wif Rig manager and Project Manager.
  • Perform daily update on schedule in regards to timeline detailed activity.

Project Planner/Scheduler (Contract)

Confidential - Houston, TX

Responsibilities:

  • Worked on Subsea drilling project for teh construction, shipment and delivery of subsea equipment like Manifold, Trees, wellhead, connector, flow lines etc.
  • Developed work breakdown structures (WBS) and worked closely wif teh engineering team to prepare schedules.
  • Created and maintained detailed engineering schedules based on teh WBS, wif task definitions, dependencies and relationships.
  • Planned, developed and maintained several schedules of identified activities in a logic based schedule program while supervising 3 lower-level Project Controls schedulers using Primavera P6
  • Detailed management of client and operational module to ensure necessary information is distributed accordingly
  • Provide client and project management wif detailed information in regards to project progress
  • Develop baseline progress schedule using existing templates
  • Import or assign activity codes & WBS structure for baseline progress schedule
  • Create necessary layouts for baseline progress schedule according to requirements
  • Create required resources for baseline progress schedule according to requirements
  • Impute man-hours, quantities, and cost into baseline progress schedule
  • Develop baseline progress curves using both early and late finish dates
  • Constant review and monitor subcontractor schedules for adherence to project specifications and client requirement
  • Import subcontractor schedules into teh master progress schedule and make necessary logic ties by implementing data mapping and conditional logic statement
  • Planned, developed and maintained several schedules of identified activities in a logic based schedule program while supervising 3 lower-level Project Controls schedulers using Primavera P6.
  • Determined and analyzed critical path activities for identification of potential delay impacts.
  • Implement corrective actions for reducing risks of delay, maintaining floats and improving time control.
  • Constant progress report updates in according to teh requirement of client
  • Project Planner/ Scheduler
  • Makon engineering and Technical Services - Nigeria Jan 2007 - Dec 2011
  • Gas Plant Fabrication- Refinery Turnaround
  • Created and maintained a schedule for each project, identify and record teh impact of work performed and not performed as scheduled for each project.
  • Created and maintained a schedule for Replace existing plant wif 120MMscf/d NAG Processing Plant Flow line scope
  • Replacement of 6 existing 6'' x 14.4km CS SCH80 Flow line.
  • Replacement of 4'' x 0.50km CS SCH80 Condensate evacuation line.
  • Drill 2 new wells (reservoirs - S2000N, Q7000N)
  • Worked independently to prepare accurate schedules and integrated different projects together for a broad view monitoring.
  • Reviewed schedules for usefulness, logic, level of detail, input sources, timing, and consistency wif teh Current Estimate, WBS, and PEP
  • Front end and detailed engineering, contracting and procurement and plant fabrication services, for various gas processing projects ranging from 5mmscfd to 150mmscfd
  • Identify critical Path Activities (CPA) and near critical and advise project team accordingly, integrated subcontract schedules wif project master schedule
  • Updated project schedule weekly wif accurate data-entry of data-date reports throughout project cycle
  • Managed multiple projects and assignments to meet reporting timelines.
  • Furnished progress reports for meetings using Primavera and Office report tools.
  • Reviewed project schedule and advised project team on time control issues while adhering to best practices
  • Created and revise schedule templates based on project type and scope detailing teh sequence of all work to be performed, prior to project start.
  • Worked directly wif teh Project Manager and Project team members to identify and resolve problems in teh area of Planning & Scheduling.
  • Responsible for systems/project planning, estimating, budget tracking, management & execution.
  • Create programmed Template in Primavera P6
  • Identify any pending client requirements and bring them to teh attention of project management
  • Build project Schedule, including logic, critical path float, resource loading, weighting
  • Produce early / late planned progress curves, manpower histograms
  • Constant update of project schedules throughout teh life span of teh project
  • Ensure dat contractual terms and conditions in teh project schedule baseline are monitored to teh current execution schedule is reflected by working on clients requirements and guidelines
  • Provide detailed information for establishing time objectives to meet client and project requirements and deadlines

Project Planner/Scheduler

Confidential

Responsibilities:

  • Planned, developed and maintained several schedules of identified activities in a logic based schedule program while supervising 3 lower-level Project Controls schedulers using Primavera P6
  • Detailed management of client and operational module to ensure necessary information is distributed accordingly
  • Detailed schedule of Farm Tank fabrication for 100,000 Metric ton for AGO storage and 120-kilometer pipeline.
  • Provide client and project management wif detailed information in regards to project progress
  • Develop baseline progress schedule using existing templates
  • Import or assign activity codes & WBS structure for baseline progress schedule
  • Create necessary layouts for baseline progress schedule according to requirements
  • Create required resources for baseline progress schedule according to requirements
  • Impute man-hours, quantities, and cost into baseline progress schedule
  • Develop baseline progress curves using both early and late finish dates
  • Constant review and monitor subcontractor schedules for adherence to project specifications and client requirement
  • Review, interpret, and summarize key contract terms and obligations to meet Nucleus Energy Corporation’s objectives and mitigate liability exposure.
  • Negotiate and maintain third-party contracts.
  • Prepare and negotiate contracts and ensure compliance wif Nucleus Energy Corporation’s standards.
  • Prepare correspondences regarding purchase orders, terms, covenants, and conditions.
  • Maintain and develop contracting plans, material responsibility and contract risk assessment matrices
  • Manage awarded contracts by ensuring invoicing correctness and payments against proper progress
  • Identify and mitigate contract risk. Ensure contracts, suppliers, and vendors meet compliance regulations and Nucleus Energy Corporation’s policies.
  • Provide all information relating to teh contract/project to teh General Counsel in teh event of technical-administrative disputes.
  • Monitor contract performance and assist teh board wif teh management of contract files and database.
  • Perform risk analysis, present solutions, and perform quality review on contracts and agreements.
  • Enter data and perform clean up, document review, database indexing, and legal research.
  • Develop Configuration Management tools, templates and processes. Conduct presentations using PowerPoint.
  • Perform Data analysis and providing Data architecture solutions for project implementation
  • Reviews status reports prepared by project personnel and modify schedules and plans as required.
  • Coordinates vendor activities by monitoring and tracking vendor deliverables and commitments.
  • Communicates project status and risks while keeping management, clients, and others informed of project status and related issues.
  • nfers wif project personnel to provide technical advice and issue resolution.
  • Coordinates, responds and assesses requests for changes from original scope of project or initiative.
  • Monitors and measures project results against technical specifications and requirements