We provide IT Staff Augmentation Services!

Ewis Integration Manager Resume

2.00/5 (Submit Your Rating)

SUMMARY:

  • Engineering Manager with ten years’ experience in aviation industry on several Aircraft Programs
  • Developed a EWIS Integration team to perform the logical Harness definition for the C919 program up to 40 employees.
  • Have managed the development of tools to control the quality of Engineering design work.
  • Have work experience outside of the United States.
  • Have been part of the development of two major commercial aircraft developmental programs

SKILLS:

Language: Fluent in English, Learning Chinese

Computer: Highly proficient in all facets of Dassault tool suite CATIA V5, ENOVIA, Knowledge of IGE - XAO tool suite (SeeXP, SeeProjectManager, SeeTopology, SeeEED, Change Manager), Extensive knowledge of Microsoft products (Word, PowerPoint, Excel, Visio, and Project), Pro\Engineer, Google Sketchup, Rhyno CAD

Coding: Proficient in VB, VBA, Visual Studio, PHP, HTML, Java, Swift, Xcode, Experienced in the development of program management tools, Experienced in ITunes Connec

WORKING EXPERIENCE:

EWIS Integration Manager

Confidential

Responsibilities:

  • Manage Integration
  • Developed a fully functional integration team from 1 employee to 50
  • Staffed and trained three integration leaders and forty engineers to perform the wire design of the C919 aircraft
  • Drove the development of the company knowledge of wire design Wire design, Harness definition and wiring diagrams
  • Developed earned value management tools for the tracking and estimation of required resources
  • Managed the deliverables to and from an external supplier
  • Disconnect Panel Definition
  • Managed the Definition of Connector part selection(Size and Quantity) on disconnect panels
  • Developed the Requirements for defining Disconnect connectors within an aircraft.
  • Managed the wire and pin allocation within disconnect connectors
  • Developed and managed the disconnect size negotiation between Wire Integration and the Digital Mockup Team
  • Harness Logical Definition
  • Systems Routing
  • Developed tools to support the management of data
  • Managed the harness definition
  • Managed the validation negotiation with the customer of each harness
  • Functional Diagram Definition
  • Developed a process for SAIFEI to design Wire Diagrams for the C919
  • Managed the creation of Requirements documentation for Wire Diagrams
  • Managed the outsourcing of diagram definition to a supplier
  • Physical Harness (BOM) Definition
  • Managed the definition of the Harness Bill of material for manufacturing
  • Defined and developed tools to support the management of configuration of harnesse

Confidential

Integration Manager

Responsibilities:

  • Developed tools to manage the configuration of input data from the customer
  • Deployed a design solution to reduce cost by limiting Confidential license usage
  • Controlled to development of a digital aircraft wiring network
  • Develop Processes
  • Lead the definition of processes to support harness definition
  • Managed wire design requirements definition to support EWIS certification
  • Defined engineering maturity states for harness management to support program management
  • Managed the development of the inputs and outputs of EWIS wire design

Confidential, Everett, WA

Integration Manager

Responsibilities:

  • Develop Tools
  • Responsible for the development of a program management system
  • Develop Processes
  • Responsible for the migration of Boeing sustaining Form - board process from Confidential V4 to Confidential V5
  • Support the training of design Engineers in Confidential V5 Wire Harness Assembly, Installation and Form-board design
  • Support the development of the harness design within the 787-9 aircraft.
  • Coordinate the transition of harness design on the 787 program from a developmental to a sustaining process
  • Provide technical support on site as well as remote sites around the globe.
  • Coordinate the development of manufacturing processes to support customer standards

Confidential, Everett, WA

Integration Manager

Responsibilities:

  • Develop Tools
  • Created and maintain tools to increase the quality of the product and standardize the process
  • Develop Processes
  • Created documentation in support the development of the 787 program.
  • System Interface Model Creation
  • Electrical Harness Flattening
  • Wire Harness Assembly Creation
  • Wire Harness Installation and Wire Harness Provision Creation
  • Wiring Conduit Design Guide documentation development
  • Was responsible for ensuring a smooth and stable development of wire harnesses for the 787 program
  • Supported a lean design
  • Developed documentation on subjects such as, Confidential product lifecycle management, Confidential based model creation and maintenance, airframe interface development and agreement with partners, as well as documentation to correct engineering nonconformance
  • Implemented checklists to ensure the quality of products as they change ownership.
  • Improvement
  • Represented Labinal Engineering in the Boeing 787 certification of two engineering design sites

Installation Design Engineer, Everett, WA

Confidential

Responsibilities:

  • Harness Installation Design
  • Was responsible for the creation and development of 2D and 3D Wire Harness Assemblies and Installations for the forward floors for the Boeing 787 program
  • Utilized CAD tools such as Confidential V5, Confidential and IVT to provide design solutions within a global collaborative environment
  • Participated in Airplane Volume Integration Reviews with structures, waste water, hydraulics, and systems partners in supports of a fully integrated aircraft
  • Developed solutions within a timeframe that supports program deadlines that meet customer requirements
  • Developed proposals for advanced technological solutions for the aircraft rack wiring

We'd love your feedback!