System Engineer Resume Profile
Professional Summary:
- 7 years of IT experience, specializing in planning, designing, installing, configuring and administering converged infrastructure.
- Experience in VMware based Datacenter virtualization solutions, Private Cloud Implementations/Operations, Virtualization Management, Converged Infrastructure Platform, Business Continuity and Enterprise level EMC Storage Solutions.
- Deploying and Supporting Enterprise scale VMware vSphere based Virtual Infrastructures.
- Experience with Cisco UCS and HP C7000 Blade server Environment with VMware vSphere5.5
- Designing and configuring of vSphere and VDI View environments and worked on Upgrade Projects.
- Implementing vCenter Operations Manager for performance and capacity management of the private cloud.
- Excellent backup and recovery skills focusing primarily on performing disaster recovery and data migration related activities.
- Experienced in managing large scale environments using VMware, Vblock, VCloud Director, EMC Storage and Cisco Switches.
- Experienced in ESX ESXi Architecture, guest OS installation, setting up of VM priorities, Cloning and Snapshots.
- Experienced in vSphere 5 and vCenter.
- Experienced in resource management framework, creating resource pools, adding the VMs into resource pools.
- P2V and V2V conversions by using VMware Converter.
- Experienced with the VMware HA,FT and VMware DRS.
- Extensive knowledge in advance features of VMotion, Storage vMotion, VM Lab Manager and vCenter and VMware Orchestrator.
- Experienced in VM Snapshots and Templates.
- Implementation of VCloud Director, vShield Director.
- Ability to implement VMware's Virtual Switch technology port aggregation, NIC teaming, VLAN trunking and port groups.
- Excellent Knowledge on Vblock Architecture, UCS Compute, MDS- Switches, Nexus Switch.
- Successful deployment of Cisco 1000v VSM with vSphere 5.
- Experience with Service Profiles and UCS Manager.
- In-depth knowledge on Vblock Storage like EMC VNX and VMAX.
NDMP backup configurations.
- Configuring various Tape libraries such as Quantum I Scalar, STK, VTL using Data Domain, EDL and CDL, SILO, HP MSL 6000 Series, Dell Power Vault -110T, 132T 136T Tape Libraries, IBM 3584/3592 LTO Libraries and NDMP Auto-changers.
- Configuring and administering Data Domains.
- Upgrading Data Domain OS.
- Configuring Data Domain Replications.
- Managing Data Domain File systems, M-trees, NFS, CIFS and VTL Libraries.
- VM backups using EMC Networker, EMC Avamar and Net Backup.
- In-Depth Knowledge on Installation, Patching and Troubleshooting Windows XP, 2000, 2003, 2008R2.
Delivery Assurance - Quality Focused Process Oriented:
- Ability to work in high-pressure environments delivering to and managing stakeholder expectations
- Application of structured methods to: Project Scoping and Planning, risks, issues, schedules and deliverables.
- Strong analytical and Problem solving skills.
- Good Inter personnel skills and ability to work as part of a team. Exceptional ability to learn and master new technologies and to deliver outputs in short deadlines
Technical Skills:
Certifications |
|
Hardware |
|
|
|
|
|
|
|
|
|
|
|
Work experience
Confidential
- Installation, configuration and Administration of VMware, Windows, and Red hat Linux servers.Responsibilities:
- Building, testing and managing of VMware vSphere 4.x 5.x
- Working with IDC, storage network team to troubleshoot networking issue
- Configuring BIOS RAID 0, 1 0, 5 and 6 as per client's needs
- Building ESX, ESXi, Hyper V, Red Hat 5.x 6.x using PXE and Kickstart
- Installing and configuring of vCenter 5.0 with Heartbeat 6.4, vCenter 4.0, 4.1, 5.0 servers.
- Create and Configure Virtual Machines, cloning and created Master Templates to create new virtual Machines.
- Physical to Virtual Migration using VMware and Hyper-V tools.
- Implementation and troubleshooting of vSphere Farm on ESXi 5.x platform
- Creating Host profiles to automate ESX configuration.
- Configuring and troubleshooting of HA, DRS, distributed switch, Clustering, vMotion and Storage vMotion.
- Configured and tested HA/DRS, Licenses, NTP, HP Management, DNS.
- Creating test VM to test HA and vMotion on the cluster.
- Creating Cloning, Snapshots Management and Templates on regular basis.
- Implementation of VCloud Director, vShield.
- Deployment of vFabric Application director.
- Deployment of vFabric Data director.
- VCE Vblock Infrastructure provisioning, reconfiguration and decommissioning using EMC UIM.
- Advanced Performance Analysis and Troubleshooting across all layers of the Virtual infrastructure.
- EMC VNX Block Storage Provisioning and Management for ESXi, Linux RHEL Windows hosts.
- EMC Power Path installation and configuration for Storage Path load balancing.
- Planning implementation of scheduled changes per change management policies.
- Configure SNMP based monitoring alerts on all Vblock infrastructure elements.
- Configuring Hyper-V hosts virtual networking, storage, cluster and Hyper-V VM's high availability.
- Applying patches using update Manager or manually to ESX/ESXi hosts.
- Configuration of Vblock 300/320, UCS compute, storage configuration.
- Provisioning storage to the blade servers for the ESX installation.
- Zoning, LUN Masking and Mapping.
- Configuring Virtual Machines on the Vblock.
- Administering Vblock using UCS Manager, AMP.
- Service Profile template create and deployment.
- Configuring Nexus 1000v switches and MDS- SAN Switches.
- Implemented Disaster recovery site for production site.
- Scanning and configuring LUN for ESX servers.
- Performed Virtual Machine creation, VM Configuration changes and Cloning.
- Performed storage and virtual machine migration using hot and cold migration type.
- Performed health check for the existing environment.
- Troubleshooting issues related to ESX host, vCenter, HA, DRS and VMware update manager.
- Worked with VMware update manager to install patches and updates on ESXi hosts and virtual machines.
- Involved planning and implementation of migration process
- Pre-migration, Migration, Post-Migration and validation check list.
- Tested different recovery plans in SRM to ensure recovery of failover VM's.
- Upgrading VM tools, VM versions and Data store to VMFS 5.
- Worked with various internal and external IT groups to allocate resources to perform P2V conversion scheduling.
- Migrated Physical Servers to Virtual Server using VMware Converter P2V Converter .
- Worked on Storage related daily Change Request activities.
- Have experience in NAS-NFS, NAS-CIFS and SAN storage administration.
- Configuring Qtree, Quotas for NFS and CIFS clients.
- Managing iSCSI Networks.
Environment: VMware vSphere5.0, Vblock 300, EMC VNX 5700, Cisco UCS, Nexus N1000v, Nexus 5548, UCSM, VCloud Director, AMP.
VMware Consultant Confidential- Experience in vSphere 5.5 Administration ,Design and Upgrades of large environmentsResponsibilities:
- Deploy and Manage VCloud Automation Center based private cloud for self-service provisioning and lifecycle management of VM services that comply with established business policies.
- Worked on Extensive VDI View 5 Implementation and Deployments.
- Extensive Experience with Windows 2003/2008 Active Directory /DNS/DHCP .
- Worked on Windows SQL 2008 Active/Passive and Active/Active Clustering Administration.
- Experience with Datacenter relocation projects with hudeP2V/V2V migrations
- VCAC integration with vCenter and Cisco UCS endpoints to provide both virtual and physical cloud services.
- Implement VCAC workflows to allow tenants to order, deploy, modify and decommission VM's from a list of published Machine Blueprints in the service catalog of the tenant's business group.
- Design and Implement Cisco Unified Computing System UCS platform in private cloud environments.
- Configure backend vSphere, Compute, Network and Storage platforms to provide multiple service classes based on performance and availability in the VCAC private cloud.
- Design and implement vCenter Operations Manager VCOPS for performance and capacity management of the private cloud.
- Create VCOPS custom dashboard specific to VCAC business groups allowing Tenant administrators to view resource utilization of their organization.
- Designed and implemented SRM for the enterprise Disaster Recovery, replicated data and successfully tested the failover and failback for DR
- Analyzed and monitored virtual infrastructure using vCenter Chargeback
- Planned and implemented vCenter migration from vSphere 4.0 to vSphere 5.0
- Perform P2V and V2V migrations of windows and Linux servers.
- Deploy VCloud Director based private cloud to provide a self-service IT portal where Infrastructure as a Service can be consumed from a catalog of predefined applications.
- Implement VCloud Director to tenants to deploy vApps from templates, modify virtual machine hardware, take VM snapshots, delete vApps and provide visibility into current allocated and available capacity.
- Configure Provider Virtual Datacenters with different performance and availability capabilities to provide multiple service tiers in the private cloud.
- Implement VCloud Organizations to segregate production and non-production workload.
- Create Organization Virtual Datacenters with different compute allocation policies to provide VM's with high, medium and low CPU/Memory reservations.
- Configure External Networks, Organization VDC Networks, and Network/IP pools in the VCloud environment. Configure VCloud Catalog storage for vApps template and OS installation media.
- Implement vSphere Storage profiles and VASA to provide multiple tiers of storage with a single VCloud Provider Virtual Datacenter.
- Implement VCloud Director through clustering and load balancing across multiple VCloud Director Cells.
- Implement VMware Site Recovery Manager in the VCloud environment for automated Site to Site disaster recovery of the production VMs.
- EMC Recover point implementation for Continuous Remote Replication of Tier 1 VM data.
- Installing Site Recovery Manager SRM Server on the Source and the DR site and Integrating with respective vCenter.
Environment: VMware vSphere5.0, SRM 5.0 Array replication, Cisco UCS, Nexus N1000v, Nexus 5548, UCSM, Recover Point, EMC VNX 5500.
Role VMware/UCS Consultant
Responsibilities:
- Designing and implementingSiteRecovery Manager for automated disaster recovery of virtual environment.
- Implementing EMC Recover point for Continuous Remote Asynchronous Replication of production data.
- Installing Site Recovery Manager Server on the Source and the DR site and Integrating with respective vCenter's.
- Implementing and managing Block based VNX storage system in VMware virtualization environment.
- Installing, Configuring and Managing Cisco Unified Computing System UCS platform for vSphere Infrastructures.
- Installing and configuring Recover point using Deployment Manager.
- Integrating SRM with the backend recover point using SRA adaptor.
- Implementing and Configuring recover point Production Volumes, Production Journal, Replica Copies, Replica Journal, Consistency Groups, Replication Sets, Replication priority and other settings.
- Configuring SRM Resource mappings, folder mappings, network mappings, protection groups and data store groups.
- Creating and configuring Recovery plans and Recovery network options.
- Planning and executing non-disruptive Disaster Recovery testing by creating isolated network bubble at the DR site.
- Managing SRM based protection in a highly dynamic environment ensuring newly deployed Tier1 VM's are protected and on replicated data stores.
- Manage all aspects of vSphere environments.
- Configuring and managing Cisco UCS Service Profiles, MAC/UUID/WWPN/WWNN identity pools, various Server, Network and Storage related policies.
- VNX Block Storage Provisioning and Management including Raid Groups and Traditional LUNS, Pools and thin LUNs, LUN Migration, FAST VP, FAST Cache, Storage groups, Host Initiator registration.
Environment: VMware vSphere5.0, SRM 5.0 Array replication, Cisco UCS, Nexus N1000v, Nexus 5548, UCSM, Recover Point, EMC VNX 5500.
Role Sr. System Engineer
Responsibilities:
- Installed and configured VMware ESX/ESXi 5.0/4.1 Hosts.
- Upgraded of vCenter Servers /ESXi hosts from vSphere 4.0, 4.1 to 5.0
- Upgraded VMs hardware components according to the vSphere requirement.
- Worked on SRM 5.0 deployment and configuration of DR site.
- Upgrading VM tools, VM versions and Data store upgrade to VMFS 5.
- Deployment of vFabric Application director.
- Deployed VM appliances from OVF templates.
- Performed storage and virtual machine migration using hot and cold migration type.
- SAN space allocation for ESX hosts.
- Scanning and configuring LUN for ESX server.
- Troubleshooting issues related to ESX host, vCenter, HA, DRS and VMware update manager.
- Disk Space increase using VMware converter and importing of virtual server using VMware converter.
- Performed LUN management, MetaLUN's, RAID groups, storage groups.
- Planned and implemented High availability Disaster Recovery on Datacenters using Site Recovery Manager 5 SRM5 .
- Worked with VMware update manager to install patches and updates on ESXi hosts and virtual machines.
- Implementing and managing Block based VNX/VMAX storage system in VMware virtualization environment.
- Installing, Configuring and Managing Cisco Unified Computing System UCS platform for VMware Deployments.
- VNX Block Storage Provisioning and Management including Raid Groups and Traditional LUNS, Pools and thin LUNs, LUN Migration, FAST VP, FAST Cache, Storage groups, Host Initiator registration.
- VNX Storage Array monitoring and advanced performance analysis of its Storage Processors, frontend ports, LUNs, Pools and physical disk using Unisphere Analyzer.
- Managing/troubleshooting Cisco UCS.
- Deployed, provisioned the shared NFS storage for ESX servers and virtual machines.
- Assigned LUNs to the Hosts Windows, Solaris, Linux .
- Configured VADP VM backups using Networker.
- Configured Snapshot backups using Networker.
- Disaster Recovery, planning and Management.
- Migrated Tape based backups to Data Domain.
- Escalation Management PIR preparation, handling Escalation Calls.
- Root Cause Analysis.
Environment: VMware vSphere 4.1/5.0, SRM 5.0 Array replication, EMC Data Domain, VADP, UCSM, Recover Point, Microsoft Hyper-V, Cisco UCS, VMAX 20K, VNX 5700
Role VMware Consultant
Responsibilities:
- Assisting in planning and implementation of virtual environment
- Created Virtual Machines and Installed VMware Tools
- Provided physical to virtual migrations for servers utilizing VMware Converter.
- Deployed Through Templates
- Cloned Virtual Machines
- Managed and Troubleshoot Virtual Network issues
- Worked on VMware clustering like HA and DRS clusters using VC.
- Worked on Cold migration and vMotion
- Worked on resource management framework like creation resource pools, adding the VMs into Resource pools.
- Configured DNS, DHCP
- Customized 2003/2008 servers in terms of Registry, Audit/Account/Security policy, patching.
- Maintaining, implementing and optimizing operating systems/software utilizing VMware virtualization technologies for vSphere 4.0/4.1 including configuration of VMware HA and DRS.
- Designing and deploying a corporate VMware ESX Server infrastructure.
- Managed testing, implementation and administration of vCenter Lab Manager Server.
- Documentation included PCI compliance Requirements, Project Plan, Network Diagrams, P2V migration and Network design and upgrade recommendations.
- Disaster recovery planning, implementation and recovering systems during crash or hardware failure.
- Updated and patched all ESX servers and coordinate hardware-software installations and upgrades to ensure work is performed in accordance with company policy
- Backup and Storage Consulting - Networker, NetBackup and EMC Avamar.
- Migrated Backup servers and 10000 clients from Networker to NetBackup.
- Configured Master and Media servers.
- Configured VM backups using NetBackup.
- Implemented Data Domain to replace Tape based backups.
- Preparing and Implementing Service Improvement Plans
- Escalation Management PIR preparation, handling Escalation Calls.
- Root Cause Analysis.
- Liaison and Interfacing with clients and other technology groups for process enhancement and Escalation Matrix definition.
Environment: VMware vSphere 4.0, EMC Avamar, Cisco UCS, P2V Conversion, Plate spin migration, vCenter upgradation.