We provide IT Staff Augmentation Services!

Level Administration Resume Profile

5.00/5 (Submit Your Rating)

EMPLOYMENT

Confidential

  • VMware Systems Management and Deployment support for three virtual farms present
  • System Level Administration for Microsoft Windows 2003 servers at the Plano Service Management Center 2002-present
  • Due diligence support for the American Airlines, Sabre Holdings, Travelocity and EDS Mega-Deal Transaction 2002
  • Systems Integration support for Sybase Mainframe connectivity and EDS Payroll System 1995-2000
  • Project Manager over the Point of Sales Solution for the EDS Government SBU for the state of Connecticut Medicaid Program 1994
  • Infrastructure Deployment of Remote Access for Global Applications 1993
  • Global Sales and Marketing Tool Kit application development/integration in C and TCP/IP
  • 1992-1993
  • CIS Architect developing strategic planning for the CIO's Technical Architecture Group 1992
  • Client Server application development in C Language Wintel platform for EDS Cost Reporting system and Outlook Planning for EDS and General Motors 1987-1991
  • Operating Systems development in assembly language, C Language, Floating Point support and remote dialup communications for the Patient Care System, EDS Health Services Division 1984-1987

TECHNICAL DETAILS

  • VMware Systems Management and Deployment support for three virtual farms present
  • Setup and configured VMware virtual server farms using the Virtual Center console according to EDS standards.
  • Verified and amended virtual server technical requirements documentation making sure that the standards are followed before any server is built.
  • Setup and configured Sun Wintel-based hosts out of the box, updating firmware and drivers using Linux commands, connecting hosts to external SAN storage, connecting the hosts to production VLANS, Backup and Restore dedicated VLANS and dedicated Management VLANS.
  • Created and configured template server images, built test, model office and production virtual 100 servers for the application teams.
  • Configured post-build requirements for Virus Scan agents CA eTrust, McAfee , management and patching utilities Opsware, Update Expert, CA TNG Unicenter , backup utilities IBM TSM, Legato .
  • Setup application requirements such as load balancers, configurations for special firewalls, setup and configuration of IIS, SSL certificates, FTP and MS SQL.
  • Tested and troubleshooted application performance, network connectivity, Vmotion capabilities, CPU usage and disaster recovery.
  • Monitored and balanced physical resources between the virtual servers and overall virtual farm.
  • Checked alerts and analyzed root cause.
  • Performed required changes such as adding SAN storage, clone virtual server images, increase hard disk partition sizes, increase number of CPUs.
  • Interacted with application groups during application upgrades and troubleshooting sessions.

System Level Administration

Confidential

  • Planned and reviewed hardware requirements documentation with Project Manager and application support groups.
  • Setup and configured HP and Dell servers out of the box, updating firmware, drivers, hardware vendor management utilities HP Smartstart, Dell OpenManage .
  • Installed and configured OS following EDS standards and Gold Disk procedures.
  • Configured post-build requirements listed above .
  • Setup application requirements such as MS SQL and Cluster configurations.
  • Tested and troubleshooted application performance listed above
  • Checked alerts and analyzed root cause.
  • Perform required changes such as adding SAN storage, adding physical NICs
  • Interacted with application groups during application upgrades and troubleshooting sessions.

Due diligence support

Confidential

  • For Hardware, Software and Human Resources Processes, completed the following tasks
  • Reviewed all documentation and exhibits provided by all selling parties.
  • Cataloged information and organized inventory information.
  • Verified documented inventory versus actual physical inventory.
  • Analyzed leases, warranties, service contracts, third party vendor-provided services.
  • Reviewed actuals with selling parties.
  • Investigated issues presented by the output of the analysis.
  • Reviewed book values and present values.
  • Prepared recommendations.

Systems Integration support

Confidential

  • Requirement: EDS Corporate Information Systems needed a fast and reliable interface to send data from the mainframe systems to the Client/Server applications.
  • Solution: Sybase multi-platform middleware product that had a piece on MVS/CICS and another piece on a Wintel-based server acting as a gateway.
  • Completed the following tasks:
  • Reviewed requirements, planned, proposed solution, installed and implemented the configuration on the mainframe and MS Windows server. Provided test, troubleshooting and implementation support for many of the legacy applications that took advantage of this gateway. Many of the functions provided by the Corporate Administration System CAS had a smooth and successful transition from the mainframe model into the Client/Server model due to the implementation of this data gateway.
  • Requirement: EDS Payroll had to migrate COBOL source code into a Client/Server environment in a short period of time because of resource and licensing constraints.
  • Solution: MS Windows server-based IBM VisualAge providing a complete application development system, transparent connectivity between MVS/CICS and Client/Server TCP/IP LAN-based applications using an IBM LU6.2 TCP/IP middleware component.
  • Completed the following tasks:
  • Similar processes as described above for the Sybase Gateway solution were completed.
  • In addition to those tasks, development workstations had to be setup and configured for each of the coders, performed training tasks for the coders teaching them about the middleware, understanding the different topologies and configurations.
  • This system was in use and supported until the year 2000.

Project Manager over the Point of Sales Solution

Confidential

  • Requirement: The State of Connecticut Medicaid Program had an immediate need to connect all health service providers to a single reimbursement system.
  • Solution: Point of Sales system using Client/Server technology developed by EDS integrating EDI and local devices for hospitals and doctor's offices.
  • Completed the following tasks:
  • Reviewed requirements, planned the proposal and implemented the approved design.
  • Selected resources and organized the teams. Scheduled the POS project plan. Managed three components of the plan: development of the code run on Verifone POS devices New Jersey team , development of the code run on PC workstations Plano team , selection and procurement of PC workstations Plano team and integration of the local devices with the EDI system provided by the Electronic Commerce Division of EDS Connecticut team . Delivered the complete integrated solution to the State of Connecticut.

Infrastructure Deployment of Remote Access

Confidential

  • Requirement: TCP/IP Global connectivity for remote Client/Server applications.
  • Solution: Three phased solutions were used according to the immediate needs of the users and the actual conditions on certain areas of the globe.
  • RLN DCA Remote Gateway solution.
  • Setup, installed and configured RLN servers on LAN-based network to provide TCP/IP connectivity to the users in remote locations. The RLN solution was mainly used in the US and Europe UK .
  • X.25 Frame Relay Network solution.
  • Setup, installed and configured the physical bridges on a LAN-based network to provide TCP/IP tunneling connectivity to the users in remote locations. The X.25 solution was mainly used in Asia Pacific.
  • CISCO VPN solution
  • Tested and troubleshooted this Virtual Private Network put in place by the Network group of EDS.

We'd love your feedback!