Sr Sap Basis Hana Developer/administrator Resume
Princeton, NJ
PROFESSIONAL SUMMARY:
- Accomplished and integrity driven professional having 14 years of experience in implementation, Support, upgrade, Migration and maintenance of SAP Products
- Managed, Co - ordinate and delivered various successful assignments in various rolls such as Administrator, Senior Administrator etc.
- Expertise in System Analysis, Design, Development and Database Administration of S/4HANA 1610,S/4 HANA Finance 1605,HANA1.0/2.0,BOBJ 4.0/4.1,BODS4.1/4.2, SLT, Personas 2/3, Fiori-UI Add-on, SAP R/3 (4.6C, 4.7EE, ECC 5.0, ECC 6.0/Ehp5/6/7/8, NW04/04s/ 7.3/7.31/7.4/7.5 (Central Instances, Application Servers and SAPGUI Distribution servers) on various platforms with Oracle/DB2/SQL Server
- Installed and Configured HANA STUDIO, CLIENT Tools, BOBJ Client tools, DS Designer tools,Lumira
- Operating Systems Using UNIX (all flavors), NT 2000/2003/2008 /2012 etc.
- Experience in Performance Analysis, Monitoring Entire Landscape & Tuning Procedures for an Optimal System Performance, Collecting Statistical Records & Activating Traces. SQL Optimization, Business & Configuration process changes, Archiving, OSS Notes, ST03, ST02, ST04, OS06
- Experience in scheduling of background jobs, spool administration, system copies, applied support packs, reorganization of table space in database, scheduling Update Statistics, Indexing
- Strong experience on SAP R/3 Basis Administration, CTS+/CMS/CCTS Transport Management, Oracle 8.x,9.x,10.x,11.x Database Administration, System Monitoring, Authorizations and System Security
- Defining Client Strategy, Client Administration- Client Creation, Local Client Copy, Client Export and Import, Remote Client Copy
- Implementation of Solution Manager 7.0/7.1 and Configuration Technical Monitoring, CHARM, Wily, SMD, etc.
- Experience in establishing the RFCs Connection between R3 system and BW/BI, XI/PI, SCM, Portal, Solution manager, GRC AC/PC,BO 3.1/4.0 and BODS 4.1/4.2 Systems and maintaining the same
- Performed Implementation of Business suite products 7,7i10& 7i11 (SRM,CRM,SCM,PLM,ECC)
- Performed MDM 7.1 installation, Refresh, Migration, Patch upgrade and repository creation
- Installed and configured TDMS 3.0 in ECC 6.0, BI 7.01 and Solution Manager Systems
- Performed Net weaver 7/7/01/7/02/7/1/7/3/7.31/7.4/7.5 (EP, PI, BW/BI, and BWA) based installations
- Applying Sap notes, Support packages (DMO,JSPM, SPAM, SNOTE, SUM,SAINT,NWDS and Ehpi) and Kernel upgrades
- Expertise in process of SUM DMO tool for In-Place Migration from Legacy to HANA DB.
- Experience in Perform Unicode Migration projects.
- Database Administration on Oracle 8i, 9i and 10g using SAPDBA, BRTOOLS, extending table spaces
- Utilized User Definition Data Base for Sarbanes Oxley (SOX) compliance to resolve Segregations of Duties (SOD) with the help of VIRSA Tool
- Data Dictionary maintenance: Domain, Data elements, Structures, tables, lock-objects, match-codes
- Good working knowledge on ALE, IDoC, RFC and BADIs
- Willingness and ability to quickly adapt to new environments and learn new technologies
- Knowledge on AWS (Amazon Web services) cloud architecture and configuration of storage, Backup, AMI, Terminology and SAP installations Process
- Excellent communication, interpersonal, problem solving skills and will work independently as well as in teams
TECHNICAL SKILLS:
SAP: S/4HANA,HANA1.0/2.0,BODS,BOBI,SLT,SAP ECC6.0Ehp4/Ehp5/Ehp6/Ehp7,(AFS, CCMS), TDMS,SAP XI/PI 3.0/7.0/7.3/7.31/7.4, SAP SCM 7.0/7.02, SRM 7.0/7.02 LAC,CRM 7.0/2007/2005, SAP R/3 4.6C/4.7 EE SR2 (CCMS, CUA, IDES, TMS), SAP BW 3.5/BI 7.0 Ehp 1/7.3/7.31/7.4, MDM5/7.1,SAP EP 6.0/7.0 Ehp1 (HR(ESS and MSS)/7.3/7.31, eRecruting 600), Solution Manager 4.0/ 7.0 Ehp1/7.1, TREX 7/7.1,Content Server
SERVERS: SAP ( Net Weaver 2004s/2004, WAS 6.x, ITS 6.x), J2EE Engine on WAS640/WAS700
DATABASES: Oracle 7.x/ 8.x/ 9i/10g, MS SQL Server 2000/2003/2008, MaxDB, DB2 UDB
HARDWARE: Confidential RS6000, Compaq Alpha Server 4100/ ES40, Confidential Netfinity, HP 9000, Sun and Fujitsu
OPERATING SYSTEMS: HP-UX, AIX, UNIX 4.0F/ 5.1A, Solaris, Linux, Windows XP/NT/ 2000/ 2003/2008, DOS.
TOOLS: SAP (Web Dispatcher, Router, J2EE Engine 6.x, Visual Administrator), Notes Assistant, SAPDBA/BR*Tools, SAP Ehpi, VIRSA, Oracle Upgrade Assistant. SUM, JSPM, SAINT, Ehpi, NWDS.SUM-DMO.
EAI: SAP - IDOC, ALE technology, SAP-XI (3.0)/PI 7.1 Ehp1
PROFESSIONAL EXPERIENCE:
Confidential
Sr SAP BASIS HANA Developer/Administrator
Responsibilities:
- Performed TDI Business Confidential from Ehp5 nuc oracle to Ehp7 uc hana and Ehp7 SPS12 to Ehp8 SPS4 upgrade in single downtime window. worked with smart shift team to perform SPDD/SPAU part of Migration/upgrade and remediation on custom objects to Unicode
- Build HANA DB SPS12 Rev 122.2.4 on Confidential Power 870 and 850 servers, Used v9000,Xtream-IO and Pure storage.
- Build SAP Systems for projects using backup and restore procedure on HANA DB and connecting using hdbuserstore helped Client basis team on adapting zero memory management on new Linux application servers
- Performed cluster/pool checks to find out bad records and adjusted using BCD check program
- Performed Kernel upgrade to 721 EXT and adapted SSFS connectivity setup for oracle and brtoools
- Worked with Client Oracle DBA team on parameter tuning based on resource availability and best practice documents
- Part of the project requirements performed Ehp8 SPS3 to SPS4 upgrade
- Build additional systems copy of Ehp8 SPS4 then Performed upgrade to S/4 HNA Finance 1605 Then upgraded to S/4 HANA 1610 Enterprise to perform POC
- Installed HANA Live content for Simple Finance and HANA Live content tools on HANA DB.
- Helped BASIS Team on setting up Dynamic Tiering for Client Enterprise HANA System
- To reach Downtime window build SAP Application server on HANA Servers and perform Upgrade from Ehp7 to Ehp8
- Performed parameter Tuning for DMO to attain downtime window. Ran DMO benchmark tool to optimize R3loads for Downtime migration and performed Multiple Mock migration on Production data to tune downtime.
- Adjusted SLT Trigger tables during Unicode Preparation and uptime Migration.
- Co-Ordinate with Confidential and Confidential BASIS teams to Gathering requirements for Performing Ehp7 Migration to HANA from Oracle Database and perform NUC to Unicode system.
- Download Ehp7 and Ehp8 software using Solution Manager to perform upgrade and migration.
- Implement application specific upgrade toolbox to perform pre and post activities
- Performed Kernel Upgrade, ST-PI,ST-A/PI and host agent on Source System to compatible with SUM DMO.
- Perform Unicode preparation activities in source system using SPUMG/UCCHECK and created Unicode nametab.
- Perform multiple dry runs with staging and production data to achieve less downtime. During dry runs adjusted network bandwidth, CPU's and migration parameters. Work with DBA Team to create new Table spaces and parameter tuning for Migration. Perform DDIC Consistency check and repair using sap program.
- Worked with ReadSoft development and labs team to finding missing objects part of the Ehp8 upgrade.
- Worked with Fiori development team to install the required components on S/4HANA Finance1605 system.
- Setup 3-Tier and 2-Tier HANA Software System Replication for Production and quality system data centers.
- Created Technical cutover task list document for Complete HANA migration.
- Worked with storage team on HANA DB storage migration from v9000 to PURE.
- Helped Client on 7.5 portal upgrade and Solution Manager 7.2 build on HANA Servers, Configuration of SLD and managed system configurations for new ECC/HANA servers to setup Technical monitoring.
- Part of the Migration & upgrade project build ECC /HANA dual landscape to support multiple projects.
- Build pizza box on Confidential ® Power System™ S822 Server to perform production Migration to achieve downtime for Ehp7 migration
- Worked with Confidential Labs and Client Infrastructure team to install SUSE HAWK Clustering for SAP High availability(between ASCS & ERS) and HAN DB(system replication)
- Involved in Performance tuning of Source and target Systems OS, DB, Network for faster Migration and upgrade.
Environment: Solution Manager 7.1/7.2, ECC6 Ehp5/7/8,NW7.4/7.5, OS Linux (SUSE/Red hat) and AIX7,Oracle 11g,HANASPS12 Rev122.2.4,S/4 HANA 1605,S/4HANA 1610.
Confidential
Sr SAP HANA Migration Consultant
Responsibilities:
- Co-Ordinate with Confidential BW and BASIS teams to Gathering requirements for Performing BW 7.3/Oracle NUC to BW7.4 SPS13/HANA1.0 SPS12 Rev122.1
- Implemented Notes in the system to achieve SAP BW HOUSEKEEPING / SAP BW BEFORE MIGRATION / SAP BW BEFORE UPGRADE / SAP BW AFTER UPGRADE / SAP BW AFTER MIGRATION ) task list for cleanup and preparation for Migration.
- Uninstall Java stack from dual stack using dual stack split tool, Cleanup schemas in DB level and removed all the entries in sap services file and JAVA directories from file system tree.
- Utilize BW Hanna Migration cockpit ZBW HANA MIGRATION COCKPIT to perform pre requisite checks and cleanup activities.
- Implemented application specific upgrade toolbox to perform pre and post activities
- Part of preparation activities upgraded Kernel, ST-PI,ST-A/PI,BI CNT EXT 737 SPS2 and host agent on Source System to compatible with SUM DMO SP16 PL11.
- Perform Unicode preparation activities in source system using SPUMG/UCCHECK and created Unicode nametab.
- Handling of DDNT* tables, pool table /cluster tables/ QCM tables / match codes/change pointers.
- Performed Unicode preparation activities by running Pool/cluster/BCD check program to find out the issues.
- Perform LMDB Consistency check to download stack and software for 7.4 SP13/NW 7.4 DVD's.
- Download updated database independent components in both Source(exe) and target(exe 2nd) Kernel in DMO to rectify issues during Migration.
- Launch DMO benchmark tool to validate the migration speed and performed actual Migration.
- Increased Network bandwidth between Source system where we are running DMO tool to HANA DB to get the required throughput for migration.
- Performed multiple dry runs with staging and production data to achieve less downtime. During dry runs adjusted network bandwidth, CPU's and migration parameters.
- Install and Upgraded DMIS/PBS/ST-A/PI after migration on Source system.
- Installed 7.4 Linux application servers ahead of time connecting to HANA DB with same schema and credentials. Adapted Profile parameters from AIX to Linux. switch AIX BW Application Servers to Linux after Migration,
- Installed new 7.5 BI-Java systems and established connection using BI-JAVA template configuration wizard.
- Connected new BW 7.4 Linux application server to NLS 1.10(Sybase IQ16.0) to perform archive.
- Upgraded to HANA SPS12 Rev 120 from factory deliver SPS10.
- Due to Bugs in Rev 120 we did upgrade from 120 to Rev 122.1.
- Setup System Replication on scale out 8 node b/w DC1 and DC2 with asynch mode and adjusted replication parameters.
- Setup DR validation utilizing production system and staging system before go live. Performed production HANA database rename to staging and setup system replication between DC2 and DC1 validated the results, perform takeover from DC2 to DC1,Connected Linux app server validated system.
- After DR validation updated production database with Original SID using rename tool Perform Unicode/Migration/Upgrade and Application switch(Linux)
- All Staging/Production Environments builds on RAC on Oracle(121) ASM.
- SLT DMIS 2011 731 PL11Implementation/replace of GG synch from ECC streaming tables to BW system.
- DMIS 2011 731 PL11component Installation and activation of services in ECC/BW system for replication.
- Import streaming tables transports in shadow system during migration to activate Structures working with SAP development team to fix the pre and post migration issues.
- Configured commvault(Simpana14.0) backint Configuration for HANA backups and enabled parallel streaming .
- Performed post processing tasks on BW Linux application server after migration including Unicode post steps.
- Fix time zone - SAP HANA database and SAP application should have same time zone
- Apply permanent license in SAP HANA database
- Download migration key and SAP license key for HANA database updated SAP HANA client and hostagent on all application server
- Adjust Indexes based DBACOCKPIT results
- Worked with DBA Team to create new Table spaces and parameter tuning for Migration
- Perform DDIC Consistency check and repair using sap program
- Tuning of standard Table placement scripts to distribute the streaming tables data to slave nodes during migration perform HANA parameter update for data and log backup file system rename schema name using export and import scripts in HANA.
- Excluded inconsistency application tables found during Unicode preparation in Migration and excluded large table for count check during migration downtime.
- Load ECC streaming tables and top BW Objects in to HANA In-memory using SQL Scripts.
- Worked with Confidential team to upgrade their existing Solution Manager from 7.1 to 7.2 and helped them to setup configure Technical Monitoring for HANA scale out Landscape and other systems. Created custom template for each landscape to setup thresholds for alerts.
Environment: Solution Manager 7.1/7.2, ECC6 Ehp7,BW7.4/7.3,EP 7.5,SLT 7.5/DMIS 731,GW 7.5, OS Linux (SUSE) and AIX, Oracle 12c,HANASPS12 Rev122.1
Confidential, Princeton, NJ
SAP BASIS Lead
Responsibilities:
- Worked on GTS 11.0 Implementation Project.
- Involved in Architecture Design/Analysis/ Requirement gatherings.
- Build GTS 11.0 systems on NW7.4 and establish connection between TREX, ECC and BW systems. configured Technical Monitoring for ECC and GTS systems in solution manager and created custom templates for each landscape to set the threshold.
- Installed SLT DMIS Components on NW7.4 and ECC systems and established connection between ECC and HANA, Tune SLT settings for Full load and Delta based on Table sizes, Implemented SAP Best practice methods for Logging Tables Table space mechanism..
- Installed HANA Client tools on Target systems to connect HANA DB.
- Loaded required tables into memory for faster response
- Schedule backups using scripts.
- Utilized BODS 4.1 to connect legacy databases to HANA.
Environment: Solution Manager 7.1, ECC6 Ehp7,BW7.4/,EP7.4,PI 7.4, SRM7.02, TREX7.1,SLT, OS Linux (Red hat), Oracle 11G/HANA1.0 SPS10
Confidential, Houston, TX
Sr SAP BASIS Admin
Responsibilities:
- Involved in BW upgrade from 7.3 SP8 to 7.4 SPS9 on HANA DB 1.0 rev 95 update.
- Upgraded BPC 10.1 from 10 and SPM 3 part of the 7.4 Upgrade.
- Refresh BW sandbox systems from BW production/HANA for 7.4 upgrade.
- Involved in PI Landscape upgrade from 7.11 SP6 to 7.4 SPS9.
- Involved in SRM JAVA 7.31 SPS upgrade to 16 from 4 and ECC Ehp5 SPS upgrade from 11 to 16.
- Working on OS migration Project PI/GW/ECC/EP/BW/GRC/SRM/MDM systems from AIX to Linux.
- Use the SAP Standard Tool SWPM for Migration with table split option for large tables and Parallel export import Operation for ECC Systems.
- Worked on Post processing activities like Oracle/SAP Parameters tuning, Certificates, satellite system connections, Stats update, License, Register in SLD, Install SMD Agents, Configure technical Monitoring in New Solman.
- Performed System PI/GW/ECC/EP/BW/GRC/SRM/MDM/EP Specific Post processing activities.
- Upgraded NAKISA Add-on 4.3 from 4.1 on ECC system and re-established connected to Portal after migration and upgrade.
- Work with Server Team/Unix Team/DB team during various phases of Migration. setup technical Monitoring in Solution Manager7.1 SP12 for PI7.4/SRM/JAVA/ECC/MDM/BW on HANA/BODS/BOE and configured all production system to Service Now for escalation.
- Performed Day to Day support activities.
Environment: Solution Manager 7.1,Ehp5,BW7.4/7.3/HANA1.0 SPS9 rev 95, EP7.3/7.4,PI 7.01/7.4,, SRM7.01,, TREX7.1,MDG6.0,BOBJ4.0,BODS4.2,BPC10/HANA,Windows2008, OS (AIX7.1,Linux(Suse/Red hat)),Oracle 11G,Mobility 3.0
Confidential, Dallas, TX
Sr SAP Basis Admin
Responsibilities:
- Implemented cFolders CPRXRPM500 702 on Ehp6 landscape and performed configuration as per the BP documents
- Supporting for Implementation of PLM 7.02 project rollout
- Upgraded portal landscape to 7.31 from 7.02 using SUM tool and taken care of all the issues during the upgrade and post upgrade activities
- Installed new PI 7.31 systems and upgraded to SPS10 parallel to existing xi7.0 then migrating the content from old to new
- Web dispatcher 7.4SP62 installation in DMZ zone and configured SNC and cFolders to external vendors
- Part of POC Emars UI project implemented SRM UI components (SRM UI5, SRMNXP, GW CORE2) on SRM 7.0
- Performed Monthly/Quarterly Refreshes of GTS, ECC, BW, SCM landscapes part of the project phase to validate and integration test
- Installed MII 14.0 and ME6.1 JAVA systems and performed the configuration to plant databases
- TDMS 4 (DMIS CNT, DMIS EXT) add-on installation on central and Satellite system (Solman 7.1, ECC, GTS).Performed Configuration to schedule the data migration between Source and target systems
- Installed new Solution Manager 7.1 and upgraded to SPS10 Non-prod and prod system on Linux environment to migrate the existing windows Solution manager 7.1dual stack system. Synching all the systems to new SLD’
- Installed SMD Agent and Host Agents on all SAP (PI,BW,ECC,GTS,BPC,SRM,SCM,BODS,BOE) systems and Performed Technical Monitoring. Enabled CCTS on Solution Manager7.1.Set up EWA reports to Prod systems
- Installed 6.40/6.50 Content and Cache servers on MAXDB database for DMS, Configured Multi level caching region wise
- Installed TREX7.1 upgrade to SP57, Performed Integration with ECC Landscape for search documents
- Involved in the OS migration for SCM7/Live cache landscape from AIX to SUSE Linux
- Installed new MDG6.0 4 system landscape with EHP6 to maintain central Master data and performed Distribution model setup to ECC systems. Activated MDG Switches. Preparing for MDG7.0 upgrade releasing in June 2014
- Performed Version Upgrade from GRC10 to 10.1(NW7.02-NW7.4) using SUM tool and updated GRC Components on all satellite systems.
- Provide day to day support to all the system in the Maxim-ECC,SRM,SCM,MAXDB,BODS,BOE,XI/PI, Solution manager7.1,GTS,GRC,MDG,PLM,cFolders,Content/Cache server,TREX7.1,Web Dispatcher7.4,BPC10,Personas2.0..etc
- Installed HANA1.0 on Amazon Cloud environment for POC BW7.31/BPC10
- NWBC4 desktop client Rollout for PLM, cFolders and eRMA project and integration with SAP Screen Personas 2
- MDR-FBDLS Tool implemented in the landscape to complete refresh over the weekend for ECC, BI, GTS, SCM landscapes
- BOBI 4.0 and BODS4.1 daily support activities and connection establishment, repository creation based on the requests. Currently working on BODS 4.2 upgrade project.
- Worked on NW gateway2.0 for SRM Odata and Fiori POC projects.
- Deployed the Fiori Add-on on Central and Backend systems and activated UI2 and UI5 Services.
- To Upgrade ECC6 Ehp7 on sandbox Environment we have performed System refresh then Use System Rename tool to change SID then Perform Ehp7 Upgrade using SUM Tool.
Environment: Solution Manager 7.1,Ehp6, SCM(APO)7.0,LC7.7/7.8, BW 7.01, EP7.31/7.01,PI 7.0/7.31, MII 14.0,ME6.1, PLM 7.02,SRM7.0,cFolders500 702,Content/CacheServer6.40,WebDispatcher7.4,TREX7.1,MDG6.0,BOBJ4.0,BODS4.1,BPC7.5/10,Windows2008, OS (AIX7.1,Linux(Suse, Red hat)),Oracle 11G
Confidential, Camden, NJ
Sr SAP Basis Admin
Responsibilities:
- Working for implementation of new landscape in Campbell for PLM, PI, MII and EP 7.3 Technology Components
- Installed PI 7.3, PLM 7.01/ECC6 Ehp5, EP 7.3 and MII 12.2 on AIX and Oracle 11.2
- Involved in the installation, configuration and maintenance of SCM 7/LC/Optimizer for DP, SNP, SNC and PPDS implementation project
- Configured the ABAP and JAVA stack for PI using sap delivered Functional units
- Deployed MII Business packages on NW AS JAVA 7.3 system, Performed Configuration to provide MII Access and Administration of PCo and other Database connectivity from MII to pull the information.
- Involved in up gradation of ECC6 from Ehp4 to Ehp5 for PLM 7.01 Usage (Recipe Development)
- Upgraded ECC6 Ehp5 to Ehp6 for PLM 7.02 New recipe Development functionality
- During the Upgrade phase worked on SPDD and SPAU with Development team to fix the objects
- End-to-End implementation of BOE4.0, BODS3.2 landscape includes Dev/QA/Prod and BOE 4.0 SP2 Patch upgraded to SP12 then Upgraded to SP4 Patch6
- Involved in BODS 4.1 SP1 Upgrade from BODS XI 3.2
- Involved in Solution Manager Upgrade from 7 to 7.1 and Post Upgrade activities including upgrade the LMDB
- Upgraded Solution Manager to latest SP Stack SPS7 using SUM 1.0 SP05
- Upgraded EP 7.31 from 7.3 and PI7.31 from 7.3 as per the project requirement
- Installation of WilyIntroscope 8/SAP Extended Diagnostic for Alert mechanism and configured SMD Agent 7.3 on managing system and Managed systems
- Performed BW 7.01 dual-stack (ABAP+JAVA) split and upgraded BW 7.01 ABAP stack from SP03 to SP11.Worked with Confidential BWA Team to patch upgrade and maintenance activities on blade servers and connection issues
- Part of the BW7.31POC, Upgraded sandbox BW 7.01 to BW 7.31 and BPC 7.5 to 10 using SUM Tool
- Worked on BWA servers for the Daily support to maintain the Indexes
- Working on Technical Monitoring setup in Solution Manager for BOE4, Self System, ECC 6 Ehp6, PI7.3 and SCM7
- Working closely with Dev and Functional team to sort out the issues
- Participated in DR exercise for ERP/SCM/BW/TWS systems
- Setup profile parameters and activate sicf services to enable ITS-Webgui functionality for sap systems
- Upgraded wily from 8 to 9 and implemented SMD 7.3 SP02 on Solution manager production and ECC, SCM and BW environments to get the data for technical monitoring
Environment: Solution Manager 7.0/7.1,ECC 6 Ehp4/Ehp5/Ehp6, SCM(APO)7.0,LC7.7, BW 7.01/7.3/7.31, EP7.3,PI 7.1/7.3/7.31, MII 12.2, PLM 7.01/7.02, BOBJ 4.0,BODS 3.x/4.1,BPC 7.0/ 7.5/10, Windows 2008, AIX6.1,Oracle 11G
Confidential, Ohio
SAP Basis Consultant /Admin
Responsibilities:
- Involved in the Implementation of SAP Systems for Phase 1A and Phase 2 projects and provided support for running Production in critical situation
- Installed ECC 6.0 with Ehp4 on windows 2008 and sql server 2008
- Post installation of ECC system and Configured with Solution manager for PROJECTS by establishing Trusted RFC’s
- Installed SAP SCM (APO) 7.0, Live Cache and max DB installation and Customized Optimizer for Confidential and Upgraded SCM 7.0 to SCM 7 Ehp1, NW 7 ehp1 TO NW 7 Ehp2 and Kernel 701 TO 720 as part of SNC (Supplier Network Collaboration) Project using EHP installer
- Installed EWM 7.0 add-on to SCM Server and performed post installation activities include SPS upgrade
- Installed SAP SRM 7.0 ABAP and JAVA stack and configured ECC and SRM ABAP stack by running SRM JAVA Template
- Installed SAP BI 7.0 EHP1 ABAP and JAVA Stack. Configured Satellite system ECC, SRM and APO(SCM 7.0),Deployed BI Admin BP on BI-JAVA to monitor Data load status, Query runtime statistics, Data load statistics and Bi Usage stats
- Installed BPC Components 7.0 and upgrade to 7.5 in SAP and Windows2003 Server level. Installed BOBJ XI 3.1 and configured with SAP BI systems
- Installed PI 7.1 EHP1 system with ABAP+JAVA stack on windows server 2003 and SQL server 2008
- Installed PLM 7 components on top of ECC 6 Ehp4 system for Dev, QA and PRD systems
- Installed TREX 7.1 Version 44 and created RFC destinations to our ERP systems and governed by TREXADMIN
- Implemented SAP Duet 1.5, Installed NW AS java and Deploy the Duet Applications OSP DUET PLATFORM and OSP PF APP CORE, Installed Duet request handler Installation
- Configured CTS+ to transport the Non ABAP objects
- System Refresh from Existing Production to Phase 1A Landscape synchronization of the Transports
- Kernel and Support pack upgrade for all the systems in the Landscape
- Installed NWDI and EP 7 Ehp1 systems as a Federated Portal system for SRM Portal and additional Portal Functions
- Configured Post installation activities for all the servers by requesting SAP License and installation SAP Standard background jobs scheduling Support pack upgrade, Kernel upgrade and Satellite system Configuration
- Configured Transport Management (STMS) in all the landscapes ECC, BI, SRM, SCM (APO) and PI
- Creation of new client based on the business Requirements in Sandbox, DEV and Quality system
- Client administration used to create new clients, taken the Client Export from Production DR Site to build new client in DEV QUA and Sandbox. Post client copy steps SCC7, WE20,WE21, BDLS,STMS,SM59, etc.
- Configured all the Systems in PORTAL for SSO and NON-SSO to access all the users
- Involved in Performance Tuning of JAVA Stack using ConfigTool, worked on Visual Admin to Maintain RFC’s, Tickets, License installation and Monitoring etc.
- Installed Vertex and configured the RFC’s to establish the connection from SAP to Vertex systems
- Configured RFC’s from BIZTALK to SAP system for data transfer
- Configured all the system in Central SLD (PI System) by providing the details while installation and registered Technical systems in SLD if missing
- Upgraded SRM Support Packages from SPS3 TO SPS9 in Operation and Project Landscape
- Installed French, Vietnamese, Italian, Spanish, and Chinese languages for all the PHASE 1A and PHASE2 systems
- Applying SAP NOTES based on the Technical and Functional consultant requirements
- Upgraded SAP GRC (5.3) System Support packs from 9 to 13 levels
- Created Consolidation Transport to move all the Phase2 Transport from Project landscape to Operations landscape
- Installed Solution Manager 7 Ehp1Quality system on MSCS Environment and applied Kernel, SPS upgrade to the latest. Installed WilyIntroscpe and configured all the system in SMD agent (Solman workcenter) and Wily
- Configured all the System in Solution manager and generated Key for new installation Created Project (SOLAR PROJECT ADMIN,SOLAR01 and SOLAR02) in Solution Manager for PHASE 1A
- Configured Early watch alerts for Production and Quality systems
- Experienced in EHP5 Installation and Upgrade from Ehp4 TO Ehp5
- Understanding on NW 7.3 installation and upgrade from Existing NW systems (NW 7 Ehp1& Ehp2)
- Configured CUA for all the Systems in the Landscape in Solution Manager as a Central user Administration
- ECC-DIMP Component upgrade to 604 for all ECC system using EHP Installer and SAINT
- Implemented SAP CPS by Redwood on NW java 7.02 to schedule central jobs.
- Worked on SPDD and SPAU objects after upgrade to validate the changes
- Deployed GTS Add-on on existing GRC System and upgraded to version 10 from 8
- Deploy the Transport and Business Packages for EH&S (Environment Health and Safety) and Configured in Portal
- Deployed PLM 7.0 Add-On (PLMWUI, CPRXRPM and CIDEON) and configured CFolders to ECC system
- Working with SAP Team to implement EH&S Project, deployed the transports provided by SAP and Created iviews and Roles for EH&S and Supervisor
- Installation and configuration of Gold Client 7 add-on to an existing ABAP stack systems and worked with Hayes team to get the required Packages and Post configuration activities
- Use Commvault software to Schedule backups and Restore the database
- Helping my colleague to implement CRM 7 on AIX 6.1 and Oracle 11.2 and configured ABAP & JAVA Stack using template wizard, SPS upgrade. Performed release upgrade from 7 to 7.01
Environment: Solution Manager 7.0 Ehp1,ECC 6 Ehp4, SCM(APO)7.0, Duet 1.5, GRC 5.3,BI 7.0 Ehp1,EP 7.0 Ehp1,PI 7.1 Ehp1, SRM 7.0, PLM 7.0, BOBJ XI 3.1/4.0,BPC 7.0/ 7.5, CRM 7/7.01,Windows 2003/2008, Sql server 2005/2008
Confidential, CA
SAP BASIS Admin.
Responsibilities:
- Successful Installation of Enterprise portal (EP) 7.0 and post installation activities
- Established RFCs between R/3, BI, and EP as part of integration in both ABAP and JAVA Stack
- Implemented BI-JAVA TEMPLATE Configuration to access the BI reports on Portal
- Assigned the BEX analyzer, BI Application and Web reporting Roles to the Super users to access the BI reports from portal
- Configured all the Development, Quality and Production System in EP to access the end Users
- Created Systems, iviews, pages and roles for configuring the systems in EP
- Configured SSO between EP, BI and ECC for all the system DEV, QUA and PRD in Landscape
- Spool Management like configuring printers in SAP, troubleshooting printer problems
- Upgraded EP7 to EP7 Ehp1 and BW7 to BW 7 ehp1 system
- Scheduled daily backup of database using DB13 and also involved in Database refresh, Increasing DB table size
- Experience in Client administration (local/ remote client copy and client deletion) in sandbox, development and training
- As a part of Post installation activities for EP 7.0, performed -- checked the portal deployment
- Accomplished post installation activities for KMC like checking the content management, deployment, KM content iview and the component monitor
- As part of post installation, configured the System landscape directory (SLD), configured the transport management system (STMS) from GUI
- Good experience in applying both ABAP and Java support package stacks via SPAM, SDM and JSPM, Add-on installations, Kernel upgrades
- Utilizing SAP monitoring tools (performance analysis, Database monitor, ABAP analysis, system/code trace, SAP memory), developed and implemented an action plan to improve performance and reduce system errors (ABAP dumps)
- Adjusting Operation modes and Work processors depending on the load and job type to be scheduled and executed
- Database performance analysis and tuning (ST01, ST02, ST03, ST04, ST05, ST22), RFC and ALE configuration. (SM59, SALE)
- Administering lock entries and update records. (SM12, SM13, SM14)
- Understood the Organization SAP Change management process and positioned the Solman 7.0 Change Request Management for more effective control
- Provided support to development, quality, sandbox, and productions systems to make available error free, high performance and Consistent SAP landscape with minimal outages adhering to the Company’s policies, process, and procedures
- Monitoring of SAP Server. (User & Work process monitoring, Updates on System, System log, scheduling & monitoring Background jobs, Dump Analysis, etc.)
- Implemented SAP Test Data Migration Server (TDMS) as part of HANA Implementation in 2013
- Installed TDMS DMIS, DMIS CNT, DMIS BSC and DMIS EXT components in respected ECC6.0, BI 7.01 and Solution Manager 7.01 Systems. Create TDMS working client in Sender and Receiver system
- Define RFC connections between Sender System, Central System (SAP TDMS) and Receiver System
- Assign SAP TDMS roles to the users TDMSADM and RFC TDMS
- Create Projects and Sub-Project for TDMS Test data migration workbench task
- Configure Package Settings and System Analysis (Define Scrambling Rules, Define Data extraction scenarios, etc.)
- Perform Data Transfer activities between sender and receiver system in Central system
- Perform Post processing activities
Environment: HANA 1.0 SP03,SAP Net weaver 2004s SR3, SOLUTION MANAGER 7.0/7.01, ECC 6.0, BI 7.0/7 Ehp1,TDMS 3.0, SEM, EP 7.0/Ehp1 and KW. ORACLE 10.2, OS platforms UNIX (SUN Solaris) and Windows
Confidential, Fairfax, VA
SAP Basis Administrator.
Responsibilities:
- Successful Installation of SAP Net weaver 2004s SR2, SAP solution manager 4.0, Enterprise portal (EP) 7.0, Process Integration (PI) 7.0, Business Intelligence (BI 7.0)
- Checking the pre-requisites and applying the OSS notes. Applying support package stack (SPS) 12 to NW 2004s SR2 with SPS 09
- Established RFCs between R/3, BI, SRM, PI and CRM, EP as part of integration in both ABAP and JAVA Stack
- As a part of Post installation activities for PI 7.0, performed -- checked the deployment of services in Java administration through Visual administrator
- As part of post installation, configured the System landscape directory (SLD), configured the transport management system (STMS) from GUI
- Involved in Checking the Connection Between the Integration Server and the System Landscape Directory
- Provided support to DEV, QUA, Sandbox and PRD systems to make available error free, high performance and Consistent SAP landscape with minimal outages adhering to the Company’s policies, process, and procedures
- Monitoring of SAP Server. (User & Work process monitoring, Updates on System, System log, scheduling & monitoring Background jobs, Dump Analysis, etc.)
- Involved in User User Administration like Maintenance and Authorization
- Configured the Desktops & Display rules, Configured Anonymous Logins, transport Objects from existing portal, Performed KM Transports in SAP EP
- Deployed the ESS and MSS Packages
- Integrating EP with E-Recruiting (603)
- Configured SSO and user mapping for portal and backend systems (EP, BW), Configured ESS and MSS business package, configuring the MS LDAP Active Directory Service and R/3 as data source for portal users
- Client administration including client creation, client copy, client deletion
- Configured Adobe Document Services, configuring SLD, creating JCo connections and deploying portal applications .PAR, .SCA and .EAR using SDM
- Configuring JDI and NetWeaver Development Infrastructure (NWDI) for application development lifecycle
- Spool Management like configuring printers in SAP, troubleshooting printer problems
- Creating Developer keys and object keys through OSS
- Scheduled daily backup of database using DB13
- Performing Data Extraction and Troubleshooting of BW issues during the Data Extraction Process (ETL). BI Monitoring the night loads, verifying system logs, create reporting agents RSSN, inbound and outbound queues SMQ2 SMQ1 and performance queries RSRT
- Successful Installation of Business Planning and Consolidation (BPC) 5.0 with Microsoft SQL Server 2005 SP2
- As a part of Post installation activities for EP 7.0, performed -- checked the portal deployment, established the portal URL, configured SSL (secured socket layer) and installed the SAP license
- Accomplished post installation activities for KMC like checking the content management, deployment, KM content iview and the component monitor
- Good experience in applying both ABAP and Java support package stacks via SPAM, SDM and JSPM, Add-on installations, Kernel upgrades
- Utilizing SAP monitoring tools (performance analysis, Database monitor, ABAP analysis, system/code trace, SAP memory), developed and implemented an action plan to improve performance and reduce system errors (ABAP dumps)
- Adjusting Operation modes and Work processors depending on the load and job type to be scheduled and executed
- Understood the Organization SAP Change management process and positioned the Solman 4.0 Change Request Management for more effective control
- Accompaniment of Early watch, CHARM, SMD and Implementation of Early watch results and service desk with Solution Manager
- Involved in the DB2 Refresh, Backup and monitoring the database on daily basis and weekly basis
- Participating with various support teams on system, networking, software/hardware planning
- Prepared comprehensive client specific documentation regarding system maintenance and installation configuration for system administration reference
- Documented procedures for the installations and configurations for the company records
Environment: ECC 6.0, SAP Net weaver 04, BI 7.0, EP 7.0 and XI, SAP BW 3.5,CRM,SRM,Solution Manager 4.0, Db2/UDB and OS platform AIX 5.3