Sr.basis Administrator Resume
Chicago, IL
SUMMARY:
- 6+ years of experience in SAP Basis administration and successful implementations.
- Performed 3 full life cycle implementations.
- Involved in operational control for support, maintenance and implementation projects.
- Experienced in upgrades from planning to execution.
- Experience in applying ABAP and JAVA patches and troubleshooting patch issues.
- Performed installations, configuration and maintaining all system - level components of SAP R/3 system and had strong exposure and good technical knowledge in SAP R/3 Basis.
- Configured CHARM (change request management) in solution manager 7.1
- Trouble shooting ABAP & JAVA startup issues.
- Performance analysis for ABAP & JAVA stacks including ERP, SCM, BW/BI, NetWeaver, EP, R/3, and CRM.
- Memory management for ABAP stacks systems.
- Implementing JVM parameters for JAVA stack systems.
- Experienced in Enterprise Portal and JAVA stack administration
- System copies for ABAP & JAVA stacks including ERP, BW/BI, NetWeaver, Enterprise Portal and CRM.
- Performed EHP Upgrades
- Experience in SAP Process Intergrations and Enhancement Pack XI /PI 7.3 EHP 1
- Performed post-installation activities for ABAP and JAVA based systems.
- Performed health check activities and daily maintenance of different SAP product version systems
- Superior knowledge and understanding of Oracle database concepts like Memory allocation, backups, restore/recovery, table space administration, indexes.
- Easily understand and solve technical problems and handling complaints from clients, customers.
- Enjoy working as a team member as well as independently.
TECHNICAL SKILLS:
Operating System: IBM AIX 5.1, 5.2, 5.3,6.1, HP-UX 10.x, 11.x, Sun Solaris 5.8, 9, 10, Red Hat Linux RHEL 2.1, 3.x, 4.x, 5.x and Windows NT/2000/2003/XP.
Databases: Oracle 11g/10g/9i/8i/7X, Oracle 10g (RAC, Data Guard & Streams), MS SQL Server 2012,2008 R2,2005, DB2 9.0/8.0, MAXDB
Cross Applications: RFC, ALE, EDI, IDOCS and BAPI
Languages: C, C++, JAVA, VB, .NET, VHDL, Verilog, SQL, PL/SQL, T-SQL, C, C++, VB, UNIX Shell Scripting, Ksh, bash and Perl Scripting.
Web Technologies: HTML, XML, VBScript, JavaScript, PHP TCP/IP, FTP, SFTP, SCP, EMC Storage, Metalink
Tools: & Packages: DBCA, DBUA, Oracle Data Guard, OEM (GC), RMAN, ASM, Cluster ware, VCS, Shareplex, SQL*PLUS, SQL*LOADER, EXP, IMP, Data Pump (expdp, impdp), TOAD, ERwin, TOAD Data Modeler, VERITAS Net Backup, DBArtisan, SAN, SQL TRACE, EXPLAIN PLAN, TKPROF, STATSPACK, AWR, and ADDM, MS-Visio, Ecatt, LoadRunner, Microsoft Office Suite
HARDWARE: IBM Power Series, Sun-Fire-880 4x1200Mhz; Sun-Fire-V490,V445;Sun-Fire-T12,T2000
SAP releases: SAP R3/4.6C/4.7 E/6.0/6.40/EHP1/EHP4/ERP6.0 EHP6, Solution Manager 7.1/7.0 EHP1/4.0, CRM 7.0, SCM 5.0/7.0, SAP XI/PI 7.3 EHP1and SAP BI (ABAP and JAVA) and NetWeaver 640/2004s/7.0EHP1 for JAVA and ABAP stacks, CRM 4.0/ 5.0/CRM 2007, SRM 7.0/7.3 EHP1, SCM 4.0/2007/7.0, 7.3 Ehp1
PROFESSIONAL EXPERIENCE:
Confidential, Chicago, IL
Sr.Basis Administrator
Environment: SAP Net Weaver 7.0 EHP2,SAP Net Weaver 7.1 EHP1,ECC6.0,SRM7.0, SCM7.0, SAP XI/PI 7.1 EHP 1,BW,Oracle11.2, HP-UX (ia64) B.11.31.
Responsibilities:
- Installed willy and maintained documentation for java performance tuning and monitoring.
- Upgrade Upgrade Oracle version to 11.2.0.3 from 11.2.0.1 on Windows 2008/ AIX 6.1 platforms.
- Oracle database online Reorg
- Upgrade SQL server database to version 2008 SP3
- Upgrade SAP PI 7.1 Landscape to SAP PI 7.31 on Windows 2008 and SQL Server
- Update CR Content to version 8.9
- Upgrade BI landscape to BW 7.4 on AIX 6.1 and Oracle 11.2.0.3
- Upgrade and configure BI 4.1 from BI 4.0
- Installed and configured BOBJ 4.0 with SQL Server 2008 R2 as database and Apache Tomcat 6.0.24 as Web Server
- Integrate BW 7.3 with BOBJ 4.0
- Configure Windows AD as the data source for BOBJ
- Setup SSO with Kerberos authentication on BI launch pad and CMC in BOBJ
- Upgrade BOBJ 4.0 to BOBJ 4.0 SP6
- Create multiple Adaptive Processing servers as per best practices from SAP notes for horizontal scaling
- Early Watch alert setup for BOBJ 4.0
- CTS+ configuration for BOBJ 4.0, automate to move the LCM transports through SAP
- Run Wdeploy tool after splitting the Tomcat Webserver to a different host.
- Solution Manager upgrade to 7.1 Ehp1 on Windows 2008 and Oracle 11.2.03
- Upgrade GTS 7.2 (NW7.0) to GTS 10.0(NW7.02) on Windows 2008 and SQL Server
- Upgrade GTS 10.0(NW7.02) to GTS 10.1(NW731) on Windows 2008 and SQL Server
- Upgrade BI Landscape to BI 7.0 Ehp1 on HPUX 11.23 and Oracle 10.2.0.4 for a different customer
- Build and Install SCM 7.0 Ehp1 landscape on Windows 2008 and Maxdb 7.8
- Support and performance tune SCM system for CTM functional golive.
- Deploy Quest Tool, activate SNC and configure SSO for ABAP and JAVA systems.
- Build and configure SAP PI 7.1 Landscape on Windows 2008 and SQL Server
- Upgrade SAP content server 640 from version 630
- Trouble shooting spool and fax issues in day to day maintenance for GoLive project.
- Created new Clients and performed local client copy, remote client copy and performed system refreshes.
- Upgraded the patches and installed support packs using JSPM tool in JAVA stack.
- Provided support in Unix administration including space management, monitoring, performance tuning.
- Maintained and monitored background scheduled jobs .
- Created operation modes and assigned timings using time table.
Sr.Basis Administartor
Environment: SAP Net Weaver 7.0, SAP ECC 6.0, Solution manager7.0 EHP 1, SCM5.1, SAP EP6.0, SRM 7.0, CRM 7.0 EHP1, SAP ECC 6.0 EHP5, BI 7.3, IDES ECC6.0 Ehp7, Content Server, Windows, AIX 5.3 TL 9,Oracle 10g and DB2 9.0
Responsibilities:
- Upgrade SAP system from source release SAP R/3 4.6C to SAP ECC6.0 on Solaris 10 with Oracle10g with downtime minimized strategy
- Involved in sizing the hardware for the new environment taking into consideration Adobe document services to work on it
- Actively Assisted the DBA team in upgrading the Oracle version from Oracle 9i to Oracle 10g
- Performed pre-upgrade validation checks with utlu101i.sql script
- Created SYSAUX tablespace for Oracle 10g
- Performed technical Oracle upgrade by DBUA script
- Installed Solution Manager 7.0 on Solaris 10 with Oracle10g as database
- Configured and scheduled the dynamic sessions for Earlywatch alert reports through SDCCN in Solution manager for Upgrade
- Configured Maintenance Optimizer for Support pack downloads on Solution manager 7.0
- Applied the Support pack stack and Upgraded SAP Kernel of the existing SAP 4.6c environment to make it eligible for upgrade
- Changed the SAP recommended Oracle 10g parameters for fine tuning of database
- Planned the migration of existing SAP 4.6c environment onto new hardware with system cloning tools
- Resolved all issues during Prepare phase and make system ready for the Upgrade, timely monitoring of CHECKS.LOG for errors occurred
- Extended the table spaces to matchup 80% rule, changed the Oracle database to use UNDO management from ROLLBACK
- Applied SAP Basis Support pack 15 as required in BIND PATCH phase
- Timely Monitoring Upgrade dialog log UPGDIAG.LOG for errors in Shadow system installation before downtime
- Successfully planned and executed the downtime phase to mark completion of Upgrade
- Reviewed LONGPOST.LOG for any Errors at the end of the Upgrade
- Performed the Modificaton adjustments for SAP notes and had developers create transports for the customizations in SPAU
- Configured STMS for the newly installed SAP ECC6.0 Landscape
- Disabled and Activated CUA before and after upgrade
- Configured SCOT for both internal and external emails and faxes in the network
- Installed the Java system as an add-in to the Upgraded SAP ECC 6.0 system
- Set up SNC SAP Router for OSS Connectivity
- Applied OSS Notes to the systems downloading from OSS as per instruction or where ever applicable
- Installed Wily introscope 7.2 Enterprise manager and management modules
- Activated the BI Source system on the Solution Manager
- Ran the setup wizard for Managed and Managing systems for SMD
- Deployed Willy Introscope Agent 7.2 on the Managed systems for SMD
- Analyze changes in the SAP landscape using End to End Change Diagnostics tool
- Analyze performance bottlenecks on ABAP and JAVA servers using E2E Workload Analysis tool
- Configured System Monitoring / Administration and Service Level Reporting
- Configured Central SDCCN and Early Watch reports
- Registered new technical systems and business systems in SLD
- Generated the RFC connections and established the trusted/trusting relationships between solution manager and satellite systems
- CCMS Configuration for Central Alert management. Alerts throwing using E-mails.Registering CCMS Agents to Central system for alert management
SAP Basis Consultant
Environment: NetWeaver 2004s, ECC 6.0, BI 7.0, CRM 5.0,SRM 5.0, SM 7.0, E.P 7.0, Netweaver 7.0,BI 7.0,Portal 7.0,solution manager 7.0, windows 2003, Solaris10 and Oracle 10g.
Responsibilities:
- Prepared R/3 4.6C system for ECC 6.0 upgrade including Support Pack upgrade on 4.6C to the matching ECC 6.0 SR3 support pack level.
- Installed and configured EP7.0 for HR/ HCM ESS and MSS package.
- Provided maintenance support for CRM,SRM and Solution Manager.
- Configured Single Sign-on on EP7.0 using SAP Logon Method.
- Configuration and monitoring of JAVA stack using Config tool and Visual Administrator for different systems in the landscape.
- Applied ABAP/Java patches using SPAM/JSPM (Java Support Pack Management).
- Deployed ESS/MSS/MDM Business Package using JSPM.
- Resolved portal performance issues, analysed the dump files to resolve the performance issues.
- Integrated Enterprise Portal support packs with ECC 6.0.
- Installed ADS 7.0 (Adobe Document Server) and Integrated with the EP (Portal) and ECC 6.0.
- Thorough understanding of Service Oriented architecture (SOA), worked extensively on Config Tool and Visual Admin to do necessary configurations and finely tune the system.
- Kernel version level and patch level matching for upgrade.
- Post upgrade steps in data migration and consistency, table consistency, ABAP programs conversion.
- Accountable for every step of the Post-Upgrade activities from knowledge transfer, documentations of procedures, runtime issues if it ran longer or even shorter than anticipated.
- Maintained versions integrity and sequencing of objects in mass transports during and after the upgrade.
- Generated the RFC connections between EP 7.0 and ECC 6.0 and established the trusted/trusting relationships.
- Conducted offline and online Backups across the system landscape and ensured proper follow up of database backup procedures.
- Developed Backup strategy for ECC 6.0 system and also all the systems in landscape using BR tools and also RMAN from Oracle 10g.
- Configured SAP Transport Management System (CTS and CTS+) on ECC 6.0 landscape and also moved the old existing systems to the new Trans directory.
- Scheduled Going-Live check with and applied the Going - Live recommended parameters on ECC 6.0.
- Configuration of Maintenance optimizer, Early watch alerts
- Configuration of SAP Router.
- Setup BI connectivity and setting up connectivity to Adobe Document Services
Sap Basis Administrator
Environment: ECC 60 EhP4, EP, SCM 5.0, MII 11.5, AS ABAP, AS Java, DI, PI, BI, BI Java, EP Core, Web Dispatcher, Solution Manager 7.0 and IDES SAP ERP 6.0 with DFPS 6.03.
Responsibilities:
- Installation of the SAP NetWeaver 7.0.
- Implementation of Solution Manager’s E2E Diagnostics, Centralized Monitoring, Wily InterScope Diagnostic tools, Service Desk, Maintenance Optimizer and TMS( Transport Management)
- Application of SAP ABAP and Java Support Stacks and Implementation of Java Applications.
- Basis Administration: Load Balancing of Resources, Setup of External System Linkages, High Availability Management, Performance Monitoring, SAP R3 Tuning, Database and OS Tuning
- Installation of the SAP NetWeaver 2004 Components, ECC 6.0, EP, MII 11.5, AS ABAP, AS Java, DI, EPC, XI, Web Dispatcher and Solution Manager 4.0 System Landscape Directory Setup and Administration.
