Sap Basis Architect Resume
5.00/5 (Submit Your Rating)
SUMMARY:
- Over 20 years of experience in IT industry, this includes over 7 years of extensive work as Database Administrator and 13 years experience in SAP implementations, HANA Architectural Design & Installations, OS/DB Migrations, Upgrades(Version / EHP), Unicode Conversions and virtualization.
- Always worked new products emerged from SAP.
- HANA Installation & configuration - TDI model - SPS 91
- SAP OS/DB Migration Certified Consultant
- HANA Architect at Confidential for BRIM & SSB Implementations.
- Solution Manager 7.1. sp12 Install & configuration for Confidential .
- CTS+ configuration for NW 7.4 PO landscape
- Extensive SAP installations on HANA SP91 (TDI model).
- Upgrade to ECC 6.0 EHP7 Support pack 7
- Upgrade CRM 7.0 - CRM 7.3
- Four OS/DB Migration projects. Informix 9.4/HP-UX - UDB DB2 9.5, RHL5, Sun Solaris/Oracle - MS SQL 2005/Win 2003 and Wind/MSSQL - Oracle/RHL, HP-UX/Oracle -- AIX/LINUX / UDB DB2
- Upgrade BW 7.01 to BW 7.41 SP 1
- Installation & configuration of SAP BPC 10.0 powered by BW on HANA 1.0
- Install & configuration, administration of Oracle RAC databases 11GR2 and administration of OCR and Voting disks. Expertise in ASM administration.
- All Unicode conversion projects involves with OS/DB migration methods. which are almost 8 Unicode projects.
- 8 Version Upgrades and Unicode conversion experience includes R/3 4.6C, R/3 4.7, ECC 6.00, BI 3.5. BI7.01, solution manager 3.2, and Solution manager 7.00, 7.01 and SCM, SRM.CRM.
- 5 EHP 5 upgrades on ECC 6.0 and Confidential on BI, CRM, SRM, Solution manager and SCM etc.
- Data Migration of large databases over 9 TB using Distribution Monitor.
- Trained & guided technical team member on BASIS Implementation, development and maintenance projects using 4.5B, 4.6 B, 4.6C, 4.7EE, ECC 5.0 and ECC 6.0,CRM,SRM and SCM and Netweaver components.
- SAP Basis (Oracle DB) and HANA
- Expertise in IS utilities and FDA regulated pharmaceuticals, Aero space, Food Industries
- Worked as Database Administrator on UDB DB2 on 256 partitions database, Oracle 10g, MS SQL 2008 R2. MaxDB, etc
- Clustering, High Availability, Disaster Recovery, Networks, Firewalls, ports, VIP, RIP, Proxies, Data Centers. Starting from Front End UI to the rock bottom of Disk/SAN, I was involved in providing technical solutions and facilitating potential infrastructure related solutions. Disaster recovery setups for databases UDB DB2, Oracle and MS SQL Server 2008.
- SAP ERP R/3 4.7, ECC 5/6, Business Objects 4.0, Data Services,GTS, SCM/APO (4.0/7.x), BW/BI, BWA/BIA, EWM, EP Enterprise Portal, Solution Manager, WebAS 640, NetWeaver 7.x/7.0.x, 640 WebAS, TDMS, DMIS, SAP router, Proxies, Web Dispatcher, SMD, hostagent, CCMS agents/monitoring, Solution Manager 7.1, HANA 1.0 SP3, TREX, VIRSA, GRC, Biller Direct, MaxDB, Oracle 9i/10G/11G, DB2 UDB 8.x, DB2 MVS, MS SQL Server 2000, IDOC, ALE, SMICM, ICF, SAP Print, STMS, CTS+, SSO, OSS, SAP Performance, HANA 1.0,
- Worked on Unix flavors AIX, HP-Itanium, HP-Parisc, Sun Solaris, SUSE Linux and Redhat Linux and windows 2008 R2, Windows 2003.
- Excellent written/verbal communication skills, positive work attitude/self-starter organized and detail oriented.
RELEVANT PROFESSIONAL EXPERIENCE:
Confidential
SAP Basis Architect
Responsibilities:
- Upgrade and migration using SUM with Database Migration Option. Source release is NW 7.31 on HP-UX/Oracle 11 going to NW 7.4 SR2/HANA SPS09 using DMO option and imp SAP notes for Table Placement..
- Install and configure HANA SPS 10 and upgrade to 102 revision on non-production systems.
- Install and configure S/4 HANA SPS 10 and revision 102.
- Install and configure S/4 HANA for simple finance. install add-on component for finance team.
- Setup of multiple HANA node server (4 node) and setup of DR by replication.
- Green field Implementation(Installation) of Solution manager 7.1 SP13 and CTS+ configuration for Non-ABAP transports for netweaver Process Orchestration 7.4. Setting of Alert Monitor and SLD configuration, Managed system configuration, SLD and SLD bridge.
- Green field implementation of PI Java only on netweaver 7.4 SP 11 (SERVERCORE” and “sap.com/J2EE-FRMW, Version ). Install and configure of AS2 and B2B EDI adapters, JDBC, SFTP, file adapters and worked on establishing connectivity with all ECC and CRM systems. Configuration of IDOC and Proxy connectivity across all ECC systems.
- Install, configure and connect NW Enterprise Portal 7.4 with Backend Satellite systems. configure SSO between SAP systems and integrate with LDAP server. ADS configuration.
- Migration of multiple systems from different countries ECC, BW, PO, CRM, SCM (APO), Design and maintain 4 different landscapes for different countries, this includes System copies, Installations, Migrations and SAP SLO team to push the carved data from JNJ.
- Install & configuration of SAP component DMIS SP 08, Win shuttle and ADS on all sap systems for data push form JNJ periodically. Install, configure SLT servers for ECC, CRM and SCM and connecting to Respective systems on CBTS cloud for data push by SAP America team. . Support for replication jobs using mass transfer ID.
- SMTP, SSO setup between Portal and backend systems. Trust broker setup on all systems to enable SSO with Active Directory. Vertex installation, ARIBA adaptor setup for PI.
- Integration of LDAP with Portal landscape.
- ADS Configuration on Fits ECC system.
- WIN Shuttle installation & Configuration.
- Installation & configuration of Netweaver Portal 7.4 and connecting to all Backend systems.
- Client copies for customization and developing. Client creation for SAP SLO teams for Pushing carve out data into new clients on CBTS systems.
- System copy of Cross Roads (ECC, CRM, BW, SCM), ROTC (ECC ECC, CRM, BW, SCM), MARS ECC, CRM, BW, SCM) from Confidential and Confidential network to CBTS cloud based network.
- Client creation/maintain separate clients for ITC I and ITC 2 cycle tests for IBM functional teams.
- OS/DB Migration: Migration of ECC, APO, CRM and BW systems (HP-UX/oracle) from CBTS cloud into AIX/DB2 (IBM UDB DB2) on AIX / UDB DB2 (DB6) CBTS cloud to Symmetry cloud network.
- Install & Configuration of Global Trade System
- Install and configuration of SAP MII on HP-UX/Oracle only not on UDB Db2.
- Install. configure and setup of Output management systems using LRS system setup for 800 printers globally across different countries by configuring the printers on LRS server and SAP.
Confidential, PALO ALTO, CALIFORNIA
Migration ConsultantResponsibilities:
- My tasks include Initial SAP HANA installation SPS 08 and Revision 03 using command line options and using configuration file with batch mode for POC system where Accenture was doing POC.
- Install HANA on 2+1 multi host system for BW on SUSE Linux with HANA 1.0 SPS 90 and revision 01 using TDI model.
- Periodic update of HANA studio, client, AFL and HANA with with new revision 06.
- Second phase includes installation of HANA 1.0 SPS 90 and revision 01 using TDI model. and subsequent upgrade to SPS 91 revision 03. which include upgrading HANA core components.
- This project is initially started with implementation of RDS for BRIM/SSB by SAP Romania Team on SAP ECC / CRM on HANA SP 08 with Revision 03 and Confidential Charging 4.0 on 12c Oracle on SUSE Linux 11.3. I was hired by Confidential as HANA Architect to assist for the install & configuration of HANA 83 (not an Apliance) and ECC 6.0 EHP 7 and CRM 7.03 on SAP HANA SP 08 with revision 3 and Confidential Charging 4.0 on Oracle 12c SUSE Linux 11.3 to work closely with SAP Romania Team for their requirements for BRIM & SSB implementation. Later this project was augmented with FICO/Biling functional implementation by Accenture along with HCL-AXON. This phase is continued until .
- In Second Phase, along with architecture team, I have to build two environments with various SAP Business suites, one for Sandbox and other for Development environment on HANA SP09 revision 1 i.e. SP91 (TDI model) on One cloud system with Individual VM's Build for SAP Business suite systems on HANA as well as on Oracle on Linux 11.3.
- Design & Installation of SIngle and Distributed system on 3 nodes using Confidential 's Vsphere architecture.
- Configuration of HANA systems, modifying Global.ini,index.ini, instance profile etc.
- Verifying File systems necessary for HANA systems.
- Make sure that file system packages installed are compatible with SAP reference documetns.
- Downloading, un archiving and Execution of HWCC tools for the data throughput, network throughput and latency.
- Periodic failover of worked nodes to stand by nodes and vice verse.
- Design & implementation of HANA security to comply with BI 4.1 application and BW users.
- Implementing Authentication on hana servers & external applications.
- Participated in One Cloud Infrastructure build team meetings to provide the HANA requirements from the File systems to Hardware configuration requirements.
- Sizing of HANA server needed for application.
- Sizing for BWoH and ECC.
- Install a distributed HANA system on three Node system.
- Executing failover of the system onto Standby server periodically.
- Install TDI model of HANA with SPS91 on three nodes.
- Execute HW Configuration Check tool on VM's built in One cloud before HANA installations for ECC EHP 7, CRM 7.03 SP 07, BW 7.41 sp 10.
- Provide System requirements for SAP Installs on HANA as well on Oracle.
- Install & configure Solution manager 7.1 with SP 12 and 13 (Two environments). configure system monitoring, Technical Monitoring with defined templates, CHARMS and service desk and change management.
- Solution Manager 7.1 SP 12 Installation & Configuration MOPZ & Technical Monitoring for 2 times, basis preparation, system preparation and managed system configuration with template creation for technical monitoring for each sap systems.
- Install & configure new SLD server to act as a SLD bridge for pushing data to Central SLD.
- Assisted as a Security administrator for initial phase of the project and configures CUA on Sand box systems only.
- Generate Stack file and Upgrade SAP ECC 6.0 EHP 7 sp 6 - SP08and SAP CRM 7.03 SP08 and SAP BW 7.41 SP10 to latest support pack from Base installation like Finbasis 747 SP 07, FI-CA 617 sp007
- Download & install & configure Necessary ADD-ons for BRIM / SSB implementation .
- Install & configure TDMS and LVM for the 2 environments.
- System copy of SAP ECC 6.0 EHP 7 / CRM 7.03 on HANA to Unit Test II environments using HANA backup / restore method.
- CTS+ configuration for HANA nd 7.4 PO landscape.
- 300 Global printer configurations.
- SAP ERP 6.0 EHP 7 SP 04 on SAP Netweaver 7.4 then upgraded to SP 08. Finbasis 747 sp 04 and 07.
- 4 ADD-ONs Installations on ERP / CRM systems relevant to BRIM configuration.
- SAP CRM 7.03 SP08 (BBPCRM 713 SP 0006) on SAP Netweaver 7.4 the upgraded to BBPCRM 713 SP 0007 and sap basis 740 SP09.
- CRM (ABAP + Java) installation on HANA Database as two different SID's on SP08 patch 3 using same server for JAVA and ABAP instance, on Linux Server 11.3
- CRM (ABAP + Java) installation on HANA Database as two different SID's on SP09 patch 1 on Netweaver 7.40.
- SAP BW 740 Sp08 on Netweaver 7.4 SP08, then upgrade it to SAP BW SP10.
- Install BI CONT 757 Sp00 and then upgrade to BI CONT 757 SP0005
- Install Add-ons on ECC/CRM needed for BRIM.
- SAP MDG system on SAP Netweaver 7.4 then upgraded to SP 08 just similar to SAP ERP 6.0 System.
- Process Orchestration (Java only) on Oracle and SUSI Linux 11.3 .
- BOBJ 4.1 installation on Oracle and configuration / integration with BW. -- 3 times
- Install & setup Confidential Charging 4.0 .
- Install Core server, Install BART Server, Install communication Taxing server, Install Diameter Server, create a DBUSER: coreuser, bartuser, Install Setup tools, create Confidential charging admin user .
- Solution Manager 7.1 SP 12 Installation & Configuration MOPZ & Technical Monitoring for 2 times, basis preparation, system preparation and managed system configuration with template creation for technical monitoring for each sap systems.
- SLD Bridge server Installation on 740 Netweaver platform for Dev systems.
- SAP LVM Installation & configuration.
- SLT server installation with DMIS for SLT Replication 2.0
- SAP Global Trade Services
- SAP FIORO WAVE
- HP Quality Center
- SAP Productivity PACK (UANCILE PERFORM).
- SAP GRC server Installation
- SAP TDMS server installation.
- Install NW 7.4 ABAP on GRC, Install GRCFND A Release 1100 AD-on and Install GRCINW on ECC system.
- SAP LVM installations.
- SLD and SLD bridge configuration between Solution Manager 7.1 Sp12 and SLD servers.
Confidential, Pittsburg, PA
Solution Manager
Responsibilities:
- Generate stack file for upgrading ECC 6.0 EHP7, CRP 7.0 to 7.3, and BW 7.4
- Upgrade and migrate ECC 6.0 EHP 4 --- ECC 6.0 EHP7Upgrade and migrate CRP 7.0 to 7.3.
- Upgrade and migrate BW 7.01 -- 7.4
- Migrate MS SQL Server 2008 to MS SQL Server 2012.
- New projects with Emmigal tool to migrate newly acquired companies.
- Microsoft Windows and MS SQL server 2012 server.
- System copies for CRM, BW and ECC.
Confidential, Manhattan, New York
Migration ConsultantResponsibilities:
- Sun Solaris / Oracle 11G to Linux / Oracle RAC 11G and Hana(test)
- This is an upgrade, Unicode conversion and Migration project from Netweaver BW 7.0 SP18 to
- Netweaver 7.40 on Sun Solaris 10(SPARC) and Oracle 10.2.0.2 to SUSE Linux
- Upgrade and Migration using DMO option onto Linux + HANA.
- Oracle 10.2.0.2.
- Sole responsible from conceptual to completion which includes
- Request with (UNIX)HP for Flash copy of the system to Sandbox, Dev,Quality and Mock.
- Download and Uncar Upgrade and Installation software for ADD-On's
- Use of SUM SP08 for Upgrade and SWAP SP09 for Target system Installation.
- Generate Upgrade Stack file.
- Upgrade Netweaver BW 7.0 --- BW 7.40
- Unicode conversion for a single code page.
- Add-on: POS-DM
- SEM-BW and FINBASIS components.
- Install & configuration, administration of Oracle RAC databases 11GR2 configuration and administration of OCR and Voting disks. expertise in ASM administration.Database patching on RAC database. configuration of the physical standby(Dataguard) from RAC 3 node to Single node.
- Expertise in database upgrade from 10g to 11gR2 databases including RAC.
- Backup recovery of RAC and NON RAC databases using RMAN.
Confidential, Ft. Lauderdale, FL
Migration ConsultantResponsibilities:
- IBM provided Hardware with Installed and configured SAP HANA 1.0 SP6.
- HDB version Info
- Adjusting the Configuration of SAP HANA 1.0 .INI files.
- Installed HANA Client components
- Installed SAP Studio Repository - Version: 1.0.64
- Adding systems and database users to the HANA studio.
- Modifying the system configuration settings using *.Ini files.
- Setting the global allocation limit Parameters like:
- Analyze and configure Database resident memory, system resident memory and used memory.
- Sizing the memory, considering Global allocation limit, service allocation limit and effective allocation limit. monitoring of status and resource usage of all system components like name server,index server etc.
- Backup of Data and log files.
- Built a shell script to automate the Backup of all HANA servers.
- Build and configured the HANA Database user creation.
- Prepare BW system 7.01 for upgrade
- Execute all ASU steps before the upgraded.
- Make sure there are no inconsistent BW repository Objects.
- Excute SMIGR CREATE DDL
- Build Target server with HANA database
- Upgrade & Migration of BW system using DMO option into target system BW 7.31 SP07
- Configuration between HANA and SLT System. (ODBC connection setup)
- Installed MS SQL Server bit Database.
- Installed SAP NW 7.02 EHP2 64bit UNICODE System.
- Installed DMIS: Special SP05 for HANA with LT Rep Server 7.20EXT Kernel.
- Install HANA client and Studio on SLT server.
- Install SAP HANA Client and configure client environment variable path
- Configuration of ODBC connection between SLT and HANA system
- Configure SAP HANA Studio and Start LOADING and REPLICATION for Tables.
- Setup RFC connection between SAP and SAP System
- Installation of Oracle Instant client on SLT server for connecting to Oracle database 10.0.2.0
- Use of LTR, IUUC SYNC MON, MWBMON, LTRC for Monitoring and administration of SLT Dash board.
- Create HANA Schema in SLT System, Defined Data Transfer jobs using Tcode LTR
- Taking backup/recovery using HANA Studio.
- Starting and Stopping HANA DB Appliance Services during maintenance activity. starting and stopping of database services (nameserver, indexserver, statistics server, xsengine)
- Monitoring HANA DB systems CPU %, Performance, Disk volumes (Data & Log) and
- Alerts using HANA STUDIO.
- Adding SAP HANA Systems, Creating Users using HANA Studio.
- Installed SAP HANA Permanent License key using HANA STUDIO.
- Performed Source system Initial Data Load and Replication activities using HANA Studio. modifying of Configuration files *.ini .
- Execute HANA transports using delivery Units and export and import.
- Create and implement HANA Security on Development, Quality servers and Production servers..
- Install and configure Data Services 4.1 on MS SQL 2008.
- Configure CMS for Data services.
- Install & configure Data services for SAP HANA
- Creation of data sources, data stores and ODBC connections.
- Define RFC server Interface on Data services 4.1 for connecting BW 3.5 system. connection setup between Data services and SAP HANA using data services designer. configured ODBC connection from SAP and NON-SAP source systems (Relational)to target server SAP HANA.
- BI security on Central management console.
- Creation of Folders,Applications, Connections, Groups, Access levels etc.
- User administration.
- Integration of Organization Active Directory with BI authentication method.
- BPC 10.0 Installation & configuration on HANA with Nwyeaver 7.3 Confidential .
- Install netweaver 7.30 Enhancement package 1 and SPS 09
- Import ADD-on using SAINT - BI CONt 747 with SPS 04.
- Install Add-IN POASBS using SAINT.
- Install Add-in EPM.
- Import Add-on CPMBPC and HANABPC using SAINT..
- Activate ICF services, /sap/EPM BPC, /SAP/poa
- Activate BI content in RSA1
- Configuring the ABAP Server component program - UJS ACTIVATE Content to create the Environment Shell.
- Enable Accelerator make Namespaces and software components changeable like /CPMB, /ICPMB, /B28, /POA and CPMBPC etc.
- Create a Service user for BPC background processing.
Confidential, Lansing, Michigan
Basis Lead
Responsibilities:
- SAP 4.7 System analysis for database size, Basis package level and other components using SPAM.
- Solution manager NW 7.00 SP15 - Analysis for ST component level and Basis component level for generating the STACK file for Upgrade.
- Analysis of Current Hardware and software and Sizing for new Hardware &software for ECC 6.0 EHP6 component.
- Upgrade SAP source kernel with 620 ( SAP de-supported in 2005) to 6.40 and upgrading the source database MSSQL 2000 to MSSQL 2005 and then starting the upgrade on 4.7 system with basis package 69 and MSSQL 2005(minimum requirement) to SAP ERP 6.0 Including EHP 6 based on Netweaver 7.0 Including Enhancement package 2 on MSSQL 2008 (R2).
- Import basis packages from SAPKB00041 to SAP KB0069 and SPAM tool using spam.
- Removal of DB02 inconsistencies, Delete SMQ1 and SMQ2 entries and unused RFC connections.
- Upgrade of solution manager from Nw7.00 to Nw 7.01 support pack 23.
- Generate upgrade Stack .xml file.
- Follow sap notes 1064635 and Unicode note 928729 and de-support of kernel 620.
- Download all needed upgrade and installation software for SAP R/3 4.7 system upgrade and ECC6.0 EHP6 sps01 packages.
- Execute CU&UC of SAP R/3 4.7 system to ECC 6.00 EHP 6 sps01 with NW7.02.
- Install and configure MS SQL 2008 R2 server on Windows 2008 R2 (64-bit) for ECC 6.00 ehp6 system.
- Migrate (OS/DB Migration) the upgraded system to new hardware and new software for DEV/QAS and sand box setup and Install cluster setup for high availability of SAP ECC 6.00 system during trail upgrades for Go-Live preparations..
- Implement post-upgrade, post-Unicode and post-installation steps.
- Data validation and consistency checks.
- RFC & printer setup, updating sap profiles and operation modes etc.
- Install new sap router.
- Minor sap security issues & fixes.
- Implemented RUNSap methodology and ITIL methods inoder to accomplish the Solman 7.1 configuration. configure new solution manager with basis preparation,
- Configure system preparation and managed system configuration using solman admin user id.
- Configure Technical Monitoring for all staellite systems with modifed KPI files.
- Synchronize LMDB database with SMSY information.
- Uninstall and Install host diagnostics agents.
- Execute diagnostic agents for polling the data. configure new sap router and router table entries.
- Performed SAP Basis and security audit of the whole SAP landscape
- Install New content server and cache server 6.40.
- Install MaxDB database Instance.
- Create repository for Content server & cache server using OACO, OACT.
- Administration of content server using CSAdmin
- Size the data volumes and log volumes.
- Install New DBN Gui tool for administration of MaxDB follow note: 386714 install SQL studio 7.6 ..
- Setup SAP DMS for the company Supported SAP environment running ECC, MM, SD and FICO, SCM
- Configure new DMS repository with the assistance from Learning solutions group.
- Execute OAC1 to migrate all the documents to new repository on new MaxDB server 7.6.
- Setting parameter for handling larger size documents - maxAllowedContentLength
- Migrate the documents from old repository to new repository based on Document Types in chunks. validation checks. implement transports, patches, notes on ECC as well on Solution manager.
- Setup company backup and restore polices and business continuity plan
- Compare the present SAP setup with best practices and recommendations from SAP and fix the issues. Fixed all the issues reported in Early watch report
- Designed and implemented policies for SAP environment
Confidential
Migration Consultant, St.Paul, Minneapolis
Responsibilities:
- This is a Migration project for an Aearo system, Migration is done from source SAP 4.7 R/3 Enterprise Ext set 2.00 Kernel 6.40 and Basis SAPKB00052 on DB2 on Mainframes (Z series) to UDB Db2 9.5 FP 8 / Red Hat Linux 5.0 .
- Analysis of the problem of successful export of the source Database Informix 9.4 by Off-shore basis team..
- As SME, analyzed the source system at SAP level from TABARTS(DB09L), tablespaces and data files perspective.
- Resolved the root cause for problem in exporting by finding 56 table spaces created without assigning any TABARTS to them.
- Advised/Suggested to the Implementor/client either to assign those 56 tablespaces to a TABART or to delete from the system after through discussion with Technical & functional team.
- Elimination of unwanted tablespaces from the source system.
- Install, config and setup of SAP ECC 6.0 EHP5 on UDB DB2 database version 9.7 FP8 on RHL 5.0.
- Installed and configured distribution Monitor for the parelle export and import of 4TB data using table split and package split procedure using 4 application servers.
- Post installation and Migration steps.
- Executing db2ckupgrade, followed by upgrading the Instance and Database
- Modyfing DBM and DB configuration parameters.
- Mass upload of data using DB2load utility.
- Use of DB2rbind, REBIND, DB reorg, DB2 sanp shots for applications,
Confidential
SAP Basis/Upgrade Lead
Responsibilities:
- Advisor/Lead for the SAP Landscape Upgrade project for ECC 6.0, BI 7.00, CRM,SRM, SCM/APO.
- EHP 5 upgrade on ECC6.0 with EHP4 with HP-Itanium for CI and AIX for database Oracle 10.2.0.5.0..
- Execution of INCV on large table before the upgrade downtime.
- Make sure to eliminate the db02 in consistencies.
- Clean of RFC's, SMQ1, SMQ2, printer configuration.
- Optimizing the system for minimum downtime.
- Making runtime objects consistant with database objects.
- EHP 1 Upgrade on CRM, SRM, SCM/APO
- This is an upgrade of CRM 700 to CRM 701 - Enhancement package 1 (Basically Confidential Installation on top of CRM 7.0 - CRM 7.01,
- BI 7.00 level 0008 - BI 7.02 level 8 (EHP2 Installation).
- System copy of SAP Landscape.
- Modify the profiles and printer configurations.
- SAP Business Objects BI Platform 4.0 Installation with SP02
- Installed on MS SQL Server bit Database.
- Created two databases (one is for CMS and another one for Audit).
- Installed SAP Business Objects BI Platform 4.0
- Setting up CMS, Audit database, Repositories and user account.
- Configured Tomcat port and Performed Post installations steps.
- Installed Explorer 4.0 with SP02;
- Installed BI Platform 4.0 and Explorer 4.0 FIX PACK FP07.
- Create users and Roles in CMS.
- Install SAP HANA Client and create ODBC connection
- Installed Information platform Services (IPS)
- Installed Data Services on IPS
- Installed SP02 and Hostfix for Data Services
- Installed SAP HANA Client Tool and create ODBC connection.
- This was done in a team of system administrators(hardware vendor), DBA's.
Solution manager
Confidential
Responsibilities:
- Ensure that the all the satellite systems are configured correctly in SMSY.
- Execute MOPz for creating the solution for Upgrade.
- Generate Update Stack.xml file for all the satellite systems..
- Uninstall and Install host diagnostics agents.
- Execute diagnostic agents for polling the data.
Confidential
SAP OS/DB Migration consultant, Memphis, Tennessee
Responsibilities:
- This is a Migration project for a packaging industry, which is sold by International Papers, Memphis, TN. Migration is done from Sun Solaris/ Oracle 10.2.0.4 to Windows 2003 and MS SQL 2005. And subsequent Upgrade from BI 3.5 to Bi.7.00.
- A division of Business is sold to Confidential Inc a Newzealand based Holt group.
- As part of separation, Evergreen migrated BI3.5 on Oracle/Sun Solaris to MS SQL 2008 R2 on Windows R2.
- Client was unable to export the data from source system with Oracle on Sun Solaris. because of in correct name (starts with ~) and left over tables from previous upgrade.
- OS/DB Migration of BI 3.5 with SP17 on oracle/sun Solaris to MS SQL 2008 R2.
- Delete unnecessary and unassociated table spaces.
- Splitting of large tables using table splitter and package splitting with Distribution Monitor deployed on multiple application servers.
- Installation of BI 3.5 on windows server with MS SQL 2008 R2.
- Export from source system using Table splitter and package splitter procedures.
- Install & import into target server.
- Post installation and migration tasks.
- Executed disaster recovery drill and documented the whole process
- CU & UC Bi 3.5 to BI 7.00
- Download BPC 7.5 server executable form Market place.
- Create 3 BPC users ahead of the time in BW system. configure connection to BW server(backend)
- Connect BPC server with CMC database server, where user management is done.
- Create users and their roles in Central management console.
- BPC Microsoft 7.0 with MS SQL 2008 in DB Server and Application Server.
- Install client on BPC server for connecting to BPC server. configure BPC users and their roles in BOBJ Central management console export & import of users & their roles.
- Ensure that the all the satellite systems are configured correctly in SMSY.
- Execute MOPz for creating the solution for Upgrade.
- Generate Update Stack.xml file for all the BW satellite system..
- Execute all solman adminstrator tasks