We provide IT Staff Augmentation Services!

Sap Mm Resume

Atlanta, GA

Summary

  • Over 12 years of work experience including nearly 6 years of SAP experience in Information Technology as SAP Functional Consultant with an understanding of different business environments in Implementation/upgrades, roll out and support projects in Material Management (MM) /Inventory Management.
  • Experienced in system configurations and integrations with thorough knowledge of logistics business processes. MM sub-modules (Master data, Purchasing, Inventory Management & Physical Inventory, Logistics Invoice Verification), defining the Organization Structure for MM with customizations at each level.
  • Extensive EDI/IDOC and ALE/IDOC experience. Worked on Inter and Intra Company Stock Transport Orders (STO), reverse STO, plant to plant stock transfers and transfer postings. Worked on Pricing procedures and MRP.
  • Precise know how of the integration & cross-functional applications of various modules like MM, QM, SD, FI, WM &PP.
  • Technical Skills

  • SAP Materials Management (R/3 4.6C & ECC 6.0)
  • Windows, Access, Power Point, Microsoft Word, Microsoft Excel, Microsoft Access, Lotus Notes.
  • Engineering CAD/3D modeling using PRO/E. Engineering Analysis using Pro-mechanica
  • Education
    MS, Mechanical Engineering
    BE, Mechanical& Production Engineering

    Work Experience

    Confidential,Atlanta GA Jun’10 – Aug’12
    SAP Production Support ECC 6.0
    SAP MM /IM Support Consultant.
    Confidential, was established in 1980 as a diversification effort of Ciba-Geigy\'s USA Pharmaceutical Division headquartered in Atlanta, GA, U.S. In 1996, Ciba–Geigy merged with Sandoz to form Novartis, one of the world\'s leading healthcare companies, and CIBA VISION® became the eye care unit of Novartis. CIBA VISION® provides highly effective lens care products that ensure comfort, performance and convenience when wearing contact lenses.

  • Worked on Production support in SAP MM/IM Management modules from SAP ECC 6.0 for Novartis/CIBA vision plants.
  • Prepared Test scripts and strong functional understanding focus on testing for MM/PP [P2P] modules at the time realization.
  • Material Management: Support Activities Involved: Configuration and management of Material Master, Master Data, BOM, contracts, forecasting and purchasing. Material Requirements Planning and Logistics Invoice Verification.
  • Worked Handling Unit Management with various scenarios in SAP for packing RAW and Finished good Materials.
  • Involved in Functional design and realization Skills including configuration and documentation.
  • Helped Unit testing of the transaction and support to the business users during integration /UAT and guided ABAP team to fix the form functional aspects at the time of Integration and Regressive testing.
  • Layout set customization using SAP Scripts and Smart Forms.
  • Modified standard SAP Script.
  • Worked on Master data review, clean up and update.
  • Worked on Interfaces and Data Migration using ALE/IDOC
  • Worked on Basic Data, capacity planning, Material Requirements planning, production orders Process instruction.
  • Resolved inter modular issues while Integration testing of Business process.
  • Prepared for all Business Process and documentation uploaded in to SharePoint portal.
  • Involved Knowledge transition in Atlanta plant and prepared the Documentation and case studies.
  • Prepared Functional Design based on client’s change management process
  • Environment: SAP R/3 ECC 6.0 (MM, IM, PP, SD, FICO)

    Confidential,Pittsburgh Jan’10 – Jun’10
    Upgrade ECC 5.0 to ECC 6.0 and Post Implementation support.
    SAP MM/PP Consultant
    Confidential, roots date back to 1877 when John Maneely implemented an enterprising Irish immigrant launched a pipe distribution business in Philadelphia, Pennsylvania selling pipe, valves and fittings. Today, John Maneely Company (JMC) serves as the parent company for both Wheatland Tube Company and Seminole Tubular Products.

  • Worked in Upgrade and Post implementation support of SAP MM/IM/PP modules from ECC 5.0.
  • Worked Interfaces related and EDI process and Barcode system in Business Scenario’s
  • Involved in FLC Skills including configuration and documentation.
  • Worked on SAP Scripts & Smart forms and ALV.
  • Unit/Integration/Regressive testing of all system and custom transactions in MM/PP [P2P] and involved with other cross functional Modules SD & FI.
  • Worked on creation and modification of master data (Material Master and Vendor Master).
  • Resolved inter modular issues while Integration testing of Business process.
  • Prepared for all Business Process and documentation uploaded in to SharePoint portal.
  • Involved Knowledge transition with ATLAS and prepared the Documentation and case studies.
  • Prepared Functional Design based on client’s change management process
  • Environment: SAP R/3 ECC 5. 0 & 6.0 (MM, IM, PP)

    Confidential,IL Jan’07 – Sep’09
    SAP Production support
    SAP MM/IM Consultant
    Confidential, is the world\'s leading manufacturer of construction and diesel and natural gas engines, industrial gas turbines and diesel-electric locomotives. The company also is a leading services provider through Caterpillar Caterpillar Remanufacturing Services, and Progress Rail Services.

  • Material Management: Support Activities Involved: Procurement Process, Configuration of Material Master, Master Data, BOM, contracts, forecasting, Purchasing, Valuation and Account Determination, Material Requirements Planning, Logistics Invoice Verification.
  • Worked in designing scenarios like outline agreements, RFQ, BOM,ECN, Source List, Info records, Quota arrangement, Vendor evaluation, Release Strategies etc.
  • Prepared High level/Detailed requirements, functional specs and Test scripts for Modular Forecasting project.
  • Coordinated with programmers to write Technical specifications to change around 30 critical existing programs to meet the Modular forecasting project requirements.
  • Unit/Functional/Cons testing of the system Transactions and preparing Manuals.
  • Given Demos to Various teams about new functionalities.
  • Coordinated with offshore team for Support.
  • Environment: SAP ECC 5.0 (MM, IM, WM, Procure-to-Pay), IDoc, FTP

    Confidential,IL May’06 –Jan’07
    SAP Implementation
    SAP MM/IM Consultant

  • Material Management: Automated creation, extension and change of Materials Master for new parts received semi annually. Also automated creation of Source list, Purchase Info record and conditions.
  • Worked on a whole ‘Procure to Pay’ cycle.
  • Configured IDoc partner profiles for Inbound and Outbound parameters for different vendors
  • Purchasing: Configured subcontracting for various plants at Client.
  • Worked on shipment (3rd Party) process for new vendor and automated complete procure to pay and also carry of additional charges from vendor invoice to dealer’s billing.
  • Configured new message type for PO output types for transferring Purchase orders through IDoc.
  • Defined new terms of payment for vendors as per Client requirement.
  • Inventory management (IM): Transfer posting, goods issue & stock creation. Special stock inventory management- Subcontracting, Consignment, Non-stock material.
  • Automatic account determination, Invoice verification.
  • Automated Invoicing process from various vendors using IDoc and FTP.
  • Supported midyear/yearend Physical Inventory activities.
  • Involved in End user, Power user training, System Testing and Integration Testing
  • Environment: SAP 4.7C (MM, IM, WM, Procure-to-Pay), IDoc, FTP

    Confidential,IL Oct’00 –May’06
    Engineering
    Design Engineer/Team Lead

  • Successfully ran & completed 23 NPI and 100 CPI projects.
  • Worked on structural designs for various product groups like Large mining trucks, Motor graders and Q&C trucks.
  • Implemented several cost savings, ranging from $50/part to $200,000 across the product line.
  • Extensive experience with whole business system from Material requirement planning to source selection, purchasing, shop floor, stock maintenance, procurement, design, design release, development, assembly line and marketing.
  • Implemented new product group named pull type scrapers into Caterpillar system.
    • Experienced in DFMA, Concept designing, Production intent designing, analyzing, and validation of system components.
    • Demonstrated ability in working with system teams, suppliers and process partners to deliver project goals on time with quality in a cost effective way. Proven ability to lead and coordinate projects.
    • Actively supported proto and pilot builds
  • Worked on LCP project on the 773E truck (Cat Vs Komatsu). Prepared a thorough and extensive BOM and cost comparison for light fabs parts. Supported CIPL for cost reduction changes on the 773E.
    • Conducted design and safety audits, and interference checks prior to design freeze using visview.
    • Communicated closely and conducted supplier visits to understand supplier process capabilities, process variations and incorporated it in design to achieve lower costs and increase quality and manufacturability.

    Environment: Pro/E, Pro-mechanica, Iman-releasing work flow.

    Hire Now