We provide IT Staff Augmentation Services!

Sap Pp-pi, Qm Consultant Resume

4.00/5 (Submit Your Rating)

San Francisco, CA

PROFESSIONAL PROFILE:

  • Over 7 years of experience in Analysis, To - be processes, Configuration, Acceptance testing and Go-live support of SAP R/3 PP/ PP-PI modules. Implemented
  • SAP in the following industries: Oil & Gas, Manufacturing, Pharmaceutical, and Food & Processing and involved two Full Life Cycle implementation in SAP PP/PP-PI modules
  • Organization Structure: Configuring Company Code, Controlling Area, Plants, Maintenance Planning Plant, Purchasing Organization, Storage Locations, Sales Organization, Sales Area and their assignments to other respective organizational units.
  • Master Data: Deep, hands-on experience with Material Masters, BOMs, Work Centers/Resources, Recipes/Routings and PRT’s.
  • Demand Management: Make to Stock, Assemble-To-Order and Long-term Planning.
  • MPS/MRP: Configured Plant for MRP, Basic vs. Lead-Time Scheduling, MRP Groups, Lot Size Methods, Planning and Scheduling Parameters, Dynamic Safety Stock, Consumption Mode, Planning Calendar, Exception Messages, Rescheduling, Reduction strategies, Start date in the Past.
  • PP-PI: BOMs, Master Recipes, Production Versions, Confirmations and Process Orders. Use of PI messages/IDOCs for communication with ProPack MES system.
  • Configuration of the full suite of PP-PI functionality for Process Orders.
  • Configuration of PI-sheets (characteristic-based) for Shop Floor execution.
  • QM & VC: Configuring and Customizing Quality Planning, Quality Assurance & Quality Control. Creating Material Variants, Providing Variant Configuration design solution and mapping necessary for VC Upload into SAP via custom interfaces.
  • AII/OEM: Implemented Product Serialization Configured Central Number range management and local serial number range management and Perform Product Tracking and Authentication.
  • Capacity Planning: Configuration and master data for Detailed Scheduling, Capacity Evaluation and Capacity Leveling, Long-Term Capacity Planning.
  • Batch Management: Defined and Configured for Production/Process Orders, Interplant Stock Transfers, Subcontracting and Inventory Management. Have worked extensively with Batch Determination, Active Ingredient Management, Batch Derivation, Material/Quantity Calculation and Batch Classification.
  • Planning Strategies: Make-to-Stock, Assemble-to-Order with Finite Scheduling.
  • Subcontracting and External Processing with Scheduling Agreements/Purchase Orders and Source List. Configured “External Processing” for subcontracting within a production Routing.
  • Inventory Management: Goods Receipt, Goods Issues, Back flushing, Physical Inventory Count.
  • Production/Process Orders: Availability Checking, Shop Floor papers, Detailed Scheduling, Trigger Points for Rework, Confirmation with Time Events, Order Type parameters, Delivery to Stock. Configured Production Orders for automatic generation during Assembly Processing.
  • Active Ingredient Management: Configuration for batch determination and Material/Quantity calculation using potency, and Proportional Units of Measure.
  • Reporting. Extensive knowledge of tables and their relationships in PP/PP-PI applications (used extensively in development of specifications for custom programs and user exits.
  • Integration: Knowledgeable of integration points among PP/PP-PI and MM.
  • SAP Solution Manager: Heavy use of the Solution Manger tool to track all key project deliverables including Configuration, Functional/Technical Specifications, Process Flow Diagrams, Process Design Documents, and Key Decision documents.
  • HP Quality Center (Mercury Test Center): Authored and executed Test Plans within the Mercury HP Quality Center Application.
  • End User: Experienced in Post Implementation Production Support and the end-users using the RWD uPerform tool.
  • LSMW: Programs written for Material Master mass-changes, BOM creation, Recipe Creation and Work Center mass-data loads.

TECHNICAL SKILLS:

ERP Packages: ECC 6.0, SAP R/3 4.7, 4.6C

ERP Modules: SAP PP/PI

Project Management & Process Designing: ASAP Project Methodology.

Test Management Tool: Mercury Quality Center, HP Quality Center

Operating Systems: Windows 98/2000/NT/XP/Vista, UNIX, DOS, Macintosh

Office Software: MS Word, MS Excel, MS PowerPoint, MS Access

Programming Languages: BASIC, C, C++, HTML, Java, Javascript, MySQL, Scheme, Perl, CGI, Python

Other Tools: Acrobat, MATLAB, Mathematica, Eclipse, Subversion SVN, Test Director, WinRunner. QTP

PROFESSIONAL EXPERIENCE:

Confidential, San Francisco, CA

SAP PP-PI, QM Consultant

Environment: SAP ECC 6.0

Responsibilities:

  • Analyzed As-Is business process from the subject matter experts (SMEs) team and explored the manufacturing operations/activities at shop floor, envisioned and map the TO-BE process for SAP PP implementation.
  • Identified the gaps in the business process and abridged them with functionality in SAP system.
  • Created As-Is and To-Be process flow using MS Visio.
  • Conducted seminars for department head of manufacturing operations and department members about PP Master Data, SOP, Planned Independent Requirements (PIRs), MRP/MPS, and execution phase (Purchase Requisitions, Purchase Orders, Planned Orders, & Production Orders).
  • Configured SAP PP settings for discrete manufacturing scenario as per the requirements of Business Blueprint
  • Configured new material types based on business requirements for finished assembly, semi-finished assembly, raw material, and packaging material.
  • Customized BOM and routing for different usages such as production, engineering, plant maintenance, SD, and costing.
  • Defined work center categories, capacity categories, shift sequence, standard value keys, capacity and scheduling formulae.
  • Collaborated with FICO team, to create activity types and cost center, and assigned them to work center to evaluate the product costing of the product.
  • Customize control key for in-house production to address auto goods receipt, rework, milestone confirmation and quality inspection.
  • Created new information structures, planning types, and macros as to address production planning process
  • Maintained planning hierarchies and proportional factors, inactive and active versions of SOP, and transfer operational data from SOP to demand management.
  • Configured demand management with planning without final assembly as planning strategy.
  • Defined MRP controller, schedule margin key, detailed scheduling of planned orders and production orders, special procurement key, planning and rescheduling horizon.
  • Defined number ranges for purchase requisitions, planned orders and production orders.
  • Set up MRP run parameters for background job.
  • Used user exit to establish a warning message if the header material has not been produced for the last three months.
  • Successfully implemented the QM module with quality planning, inspections, digital signatures, audit trails, serialization and batch status management.
  • Created test scripts, test cases, and test scenarios to facilitate various testing.
  • Involved in integration testing phases, regression testing and conducted user-acceptance testing (UAT).
  • Developed process flow diagrams, documents, user manuals, and trained end users on the system process flow
  • Performed data analysis of the legacy system, data validation, and used LSMW to upload PP master data.

Confidential, Orange, CT

SAP PP Consultant

Environment: SAP R/3 4.6C

Responsibilities:

  • Configured background jobs for MRP run and special procurement keys to take care of the planning and production issues. Ensuring that the total deliverables in shape.
  • Improved Business Cycle in PP involving -MRP- Planned Orders-Production Orders-Order Settlement.
  • Production order creation, release and confirmation and back flushing, shop floor. Dealt with Make to order and make to stock scenarios. Maintained Production orders, scheduling types and order types.
  • Modification or doing enhancements in the current system thereby meeting user requirements by coordinating with development team.
  • Documentation of test scripts, test cases and procedures. Worked on solving and creating TIR (Test Incident Reports) faced during the testing process.
  • Prepared all end-user documents (simulation files and supporting word documents) for the team in the area of Receiving, Inventory Control.
  • Member of Post Go-Live production support team helping users creating remedy tickets, monitoring and resolving issues in the area of PP.

Confidential, Cambridge, MA

SAP PP-PI, QM, AII/OER Consultant

Environment: SAP R/3 4.7

Responsibilities:

  • Involved in Configuration and Implementation of SAP R/3 for PP/PI module.
  • Implemented Make to stock production strategy for the company.
  • Configured Material Master (MRP Views).
  • Involved in creation and improvements of BOM.
  • Configuration of capacity planner, planner groups, formulas, resources.
  • Setting up of Master Recipes and assignment of Process Instructions to the phases.
  • Planning methods such as single-item multilevel, single-item single level were implemented, generating planned orders.
  • Converted Planned orders either into Process Order or Purchase requisition.
  • Have hands on experience of Process Management i.e. control recipes, process messages, PI sheets.
  • Configured Catalog, Inspection Methods and Inspection characteristics.
  • Created Quality Inspection Plan’s and did results recording.
  • Helped end users in resolving issues related to PP-PI module.
  • Supported issues related to Master Data, Work Center, Recipes, Production Planning, MRP, and Production Control.
  • Implemented AII/OER resource will work directly with the Product Serialization team and would cover all the aspects of system development life cycle
  • Configuration / setup of Central Number range management and local serial number range management for Item, Case and pallets.
  • Perform Product tracking and authentication.
  • Master data setup in SAP AII and OER to support processes in Distribution Center Edgeware system
  • Experience Covers QM blueprinting, realization, testing/validation, cutover and go-live activities.
  • Involved in unit testing and integrating testing phase of the project.

Confidential, Exton, PA

SAP PP-PI, QM Consultant

Environment: SAP ECC 6.0

Responsibilities:

  • Involved in Full Life Cycle Implementation from designing to end user and production support.
  • Manufactured scenarios in PP-PI for Make to Stock (MTS).
  • Worked on Material Master, Resources, Master Recipe, and MRP, Converting Planned Orders, Release, Confirmations, Goods Movements and Cancellation.
  • Involved in creating batch Management, Batch Determination, Batch Classification, Batch Strategies and Serialization.
  • Defined the planning parameters like Planning Horizon, Planning Time Fence, maintained Safety Stock, Lot Sizing Procedures, and Rounding Profiles.
  • Configured master recipes with quality Inspection Characteristics, Configured the inspection plan.
  • Maintained and defined Scheduling Parameters, parameters for Basic Dates, scheduling parameters for Planned Orders. Defined Order types, order type dependent parameters, settlement type, status profile and control indicators.
  • Defined Conversions for Planned Orders to Purchase Requisitions, and Purchase Orders.
  • Worked together with Business Users for identifying and designing the various test scenarios and for creating detailed Test Cases and Test Scripts for Unit testing using Mercury Quality center.
  • Worked on Control recipes simulation in Master Recipe, Control Recipe monitoring and reporting process message through PI sheet.
  • Worked on process orders and Confirmation of process orders through process messages.
  • Defined Control keys, Confirmation parameters based on different order types for various production orders.
  • Trained process owners for Classes and Characters maintenance, material master for configurable material.
  • Configured, Designed and Implemented Catalogs, Inspection Characteristics, Inspection Methods, Sample Determination, QM-Specific Data in Material Master and Dynamic Modification Rules
  • Involved in the backlog teams in helping the end users with clearing the backlogs and understanding the business flow in the organization.
  • Prepared documentation for knowledge transfer and trained key users. Monitored the helpdesk and resolved the issue/quarries for end users.

Confidential, Federal Way, WA

SAP PP-PI Consultant

Environment: SAP ECC 6.0

Responsibilities:

  • Worked as a PP Consultant, responsible for business process study, and configuration of PP module.
  • Configured Make-to-Stock and Make-to-Order planning strategies.
  • Configured Sales and operation planning(S&OP) for the product groups and transferred the plan to Demand management. Done setting for the background job for mass processing.
  • Defined Conversion Rules for the Product groups. Created a planning type and macro for the flexible planning, maintained RCCP profile.
  • Working knowledge in the Quality Center updating the defects and creating test plan.
  • Configured and executed the shop floor activities including creation of orders, conversion of planned orders.
  • Made test plan, and managed all the documents through solution manager.
  • Working knowledge in I-Doc and EDI from Functional stand point.
  • Worked on the settings of variant configuration for the desired combination of characteristics and characteristics values by setting up object dependencies.
  • Made changes to the Functional Spec’s by raising the CR (change request). Participated in AT (Acceptance Test) and UAT (User Acceptance Test). Worked on client specific custom objects.
  • Tested and improved capacity and material availability checks/missing parts processing. Provided end user for implemented work flow. Written test conditions to support end user.

Confidential, Texas City, TX

SAP PP Analyst

Environment: SAP R/3 4.7

Responsibilities:

  • Implemented Make to Order Strategy for the company.
  • Performed SOP, implemented planning methods such as single-item multilevel, single-item single level generating planned orders.
  • Customized resource hierarchy, cost calculation related formulas, resource maintenance
  • Created BOM, Master Recipes, converted Planned Orders into either process order or purchase requisitions.
  • Trained end users on PP-PI.
  • Configured Material Master including defining material types, defining the views required, assigning the number ranges to these material types as per the user requirement for PP.
  • Goods receipt posting, goods issue against reservations.
  • Created, configure factory calendar and copied Message characteristics between the plants.
  • Set up the Organizational structure by creating storage location, purchase organizations and assigning them to the company code and plant.
  • Configured planning strategies and requirements type, creation of MRP elements, basic and lead time scheduling, strategy group and strategy group to MRP group assignments, define MRP controllers.

We'd love your feedback!