Sap Pp/ Mm Lead Resume
4.00/5 (Submit Your Rating)
MI
SUMMARY
- 9 years of functional Experience in Production Planning and Materials Management with a good understanding of integration with WM, FI/CO and SD modules in version ECC 6.0.
- Implementation of best practices “AS - IS” process: Analysis of current business processes, mapping current business process into SAP R/3 module.
- Experience in Version Upgrade Projects and SAP, IS AUTO experience.
- Requirement analysis and feasibility study of business processes vice versa SAP functionality.
- Designing and documenting “TO-BE” processes detailed design of the proposed business processes and components using ASAP methodology.
- Experienced in various manufacturing industries in the areas of Production Planning, Materials Management, Warehouse Management and Supply Chain Management.
- Worked on MTS (Make-to-Stock), MTO (Make-to-Order), Stock Requirement/ MRP Lists.
- Worked as Integration testing lead and cutover lead.
- Good working experience in production support with service now ticket handling.
- Experienced in creating functional specifications to facilitate ABAP developments to meet client’s reporting requirements, data migration from legacy to SAP.
- Involved in unit testing Plan and integration testing plan preparation.
TECHNICAL SKILLS
ERP: SAP R/3 ECC 6.
Operating Systems: Windows 95/98/2000, Windows NT/XP
Other Software: MS Office
PROFESSIONAL EXPERIENCE
Confidential, MI
SAP PP/ MM Lead
Responsibilities:
- Worked on project preparation, business blue print, realization, final preparation and go-live support.
- Developed a custom infostructure to maintain the site scheuduler, marketing, customers and consensus demand forecast.
- Worked on setting up the monthly jobs for generating statistical forecast, and transferring the demand forecast to the plants.
- Worked on configuring the material master, BOM’s, work centers, routings and data load specifications.
- Worked on setting the MRP jobs for multiple plants with special procurement keys for interplant demand transfers.
- Designed and developed the standard value keys for tracking technical labor, utility labor, power and depreciation during product costing.
- Configured control keys, formulas, capacity categories for resources in master data
- Set new formula in routings to take into consideration line speed during scheduling process.
- Worked on MRP, planned orders, production orders and production confirmation process.
- For R&D worked on setting projects using project systems capabilities to track not only internal activities but also sales revenues.
- Worked on consumption-based planning in setting up of lot size procedures, safety stocks and procurement proposal on a weekly basis.
- Involved in setting up of MRP types, MRP controllers and lot size procedures
- Configured consignment process such that it consumes unrestricted stock first and tan vendor consignment stock for raw materials and PM materials.
- Developed the necessary graphical planning table profiles for capacity planning.
- Developed procedure for the re-ordering of raw materials based on planning calendar.
- Worked on various LIS structure with ease of reporting or active alerts.
- Configured Inter-company STO’s with billing document and Replenishment deliveries.
- Designed and developed Inter-company Non-NAFTA product procurement process from ATUS manufacturing plants to LUMI.
- Configured Output Determination for Purchase Orders, Goods Receipts Slips using print and fax.
Confidential, MI
SAP PP /MM Lead
Responsibilities:
- Studied the current “As-Is” business process and organizational structure.
- Involved in the finalization of the “To-Be” business process using ASAP Methodology.
- Involved in the developing the specification for material masters, BOMs, rate routings, work centers, production version and necessary configuration steps.
- Designed the forecasting LIS flexible planning info structure with necessary key figures to transfer delivery information during PGI process which acts a basis for future forecasting.
- Worked with the transfer of planning data from SOP to CO-PA.
- Configured different MRP groups to suit for finished goods, semi-finished goods, raw materials and PM parts
- Worked on setting up factory calendar and planning calendars.
- Worked on consumption-based planning in setting up of the lot size procedures, safety stock levels and reorder point levels for raw materials and PM parts.
- Worked with special MRP type for VMI process and involved in testing the process.
- Developed a custom business process for automatic replenishment from outside storage location to plant storage location.
- Created new BOM item category for returnable packaging.
- Setup the missing parts e-mail to generate during goods receipt.
- Setup the MRP areas for plant maintenance parts.
- Setup of ATP jobs to run every day to allocate the right components for right planned orders.
- Enhanced MRP list and stock requirements list by adding additional columns and different navigational profiles.
- Worked on setting up of different custom movement types and material types.
- Worked extensively on product costing in creating cost collector, cost estimate.
- Configured release procedures for Purchase Requisitions, purchase orders.
- Configured Output Determination for Purchase Orders using print, fax and EDI based upon vendor.
- Configured the shipping points as per Business Requirements and designed generic shipping point for STO’s.
- Configured kanban process for automatic replenishment of components to supply area.
- Configured and redesigned the business process for STO with Delivery, Return to Vendor with delivery and subcontracting with delivery.
- Configured the subcontracting process with delivery from vendor location directly.
- Involved in the third-party processes with sales order, PO, dummy receipt of goods, invoice generation and invoice verification processes.
- Carried out configuration and changes according to the requirements of the client. Maintaining and updating table entries.
Confidential, IL
Sr SAP PP/ MM Consultant
Responsibilities:
- Project is implemented using ASAP methodology. Involved in the QADB and Business Blue Print preparation in Production Planning and Materials Management.
- Worked on PP master data transfer from PRMS to SAP for material master, BOMs, routings and production versions.
- Configured the confirmation control keys for inbound deliveries and outbound deliveries.
- Materials Planning: Created MRP controllers, Run MRP at plant level and MRP controller level, converting purchase requisitions into purchase orders.
- Configured different MRP groups.
- Worked on setting up the Engineering Change Management process for BOM’s and Routings.
- Worked on setting up of different graphical planning table profiles for capacity evaluations for site scheduler and raw material planners.
- Developed the procedure in analyzing the MRP list.
- Worked in configuring the batch management process.
- Purchasing: Created release procedures of different levels for purchase requisitions and purchase orders.
- Inventory Management: Created new movement types, Physical inventory.
- Configured Invoice verification process for ERS.
- Worked on account determination process with FI team.
- Prototype development and testing in PP/ MM modules and integration with other modules.
- Developed the testing scenarios and Business Process Procedures (BPPs).
- Developed user training documents. Involved in end user training.
- Configured the service entry sheet.
- External Services Management: Creating service conditions, created service master, service entry sheet and invoice verification process.
Confidential, CA
SAP PP /MM Consultant
Responsibilities:
- Involved in the legacy system data conversion of material master, BOM, routings, production versions, default production version from costing view and initial stock entry.
- Managed the delivery of SAP R/3 Production Planning and scheduling solution, integrated SAP with factory works a third party planning and scheduling tool and with Shop Floor systems, and integrated Production Planning with Warehouse Management (WM), Sales and Distribution (SD), and Procurement (MM).
- Managed the co-ordination of data collection of Material Master, Bill of Materials (BOM), work centers, routings, production versions, master inspection characteristics, inspection methods, inspections plans, and material specification.
- Designed and developed data standards, functional specification for conversion programs; and converted master data and reconciliation.
- Set up configuration and master data for goods receipt inspection of raw materials and chemicals wherein the process involved two scenarios one that involved actual inspection of the incoming material and recording inspection results and the other involved acceptance based on vendor certificate.
- Analyzed, designed, configured, and implemented the repetitive Manufacturing and discrete Production Planning functionality in SAP R/3 across 10 unique businesses across the globe.
- Rolled out MRP area to capture demand by production line, schedule production by MRP areas, and satisfy customer requirements that were production line specific.
- Rolled out MRP for planning of semi-finished goods and component materials involving both deterministic and reorder point planning methods including automatic calculation of safety stock and reorder levels, and MRP for planning replenishment of finished goods at distribution centers.
- Worked on production execution in repetitive Manufacturing including automatic batch determination of components, stock determination to handle split valuated materials, and back flushing of components and activities.
- Worked on batch classification with numerous batch characteristics that represented the inspection characteristics of the batches and served as the heart of the batch selection optimization and product substitution.
Confidential, NJ
SAP PP /MM Consultant
Responsibilities:
- Managed the delivery of discrete Production Planning solution in SAP R/3, with complex production processes.
- Managed the global delivery of the integration of Manufacturing Execution System (MES) to SAP, which was the heart of the manufacturing design since it handled the complete production reporting including consumption of components and semi finished goods.
- Provided post-production support to resolve master data, and configuration issues relating to demand management, MRP, production order scheduling, and execution.
- Developed the functional specification for several inbound and outbound interfaces between SAP and Camstar, a third party planning and scheduling tool.
- Analyzed, designed, configured and implemented discrete production planning solutions for silicon crystal and wafer manufacturing processes.
- Worked on capacity evaluation and capacity leveling for over 15 critical work centers in a complex routing that involved over 60 operations with complex distribution of capacity requirements.
- Worked on capacity planning with dynamic accumulation of available capacities and capacity requirements.
- Worked on Material Requirement Planning (MRP) using forecast-based planning for finished materials and semi finished materials.
- Worked on reorder point and time phased planning for the raw materials and maintenance items.
- Developed the ‘Day in the Life of a Planner’ training and delivered on the job training for the planner and schedulers.
- Designed and developed the functional specification for the SAP to MES interface.Worked on transactions, which reported production, actual consumption, and scrap quantities.
- Implemented and supported various SAP PP activities ranging from production order, SOP, and MRP.
- Worked on generation of sales and operation planning using the forecast model, BOMs for their various products and processes, and material requirement planning.
- Worked on inventory control using minimum stock and re-ordering level method for automatic re-ordering functionality.
- Developed a suitable Inventory Management technique using tolerance levels and sampling units on a fortnightly basis and stock verification on quarterly basis.
- Developed the Kanban technique for re-ordering of standard raw materials based on capacity requirements and replenishment strategies for each month.
- Developed custom reports as per clients requirements.
- Provided end user training and post implementation support.
- Worked on analyzing MRP results with plant users in MRP list and stock requirement list.
- Developing weekly production schedules based upon customer orders.
- Development of roll pass schedules.
- Optimization of process parameters to maximize machine utilization was done.
- Business Process Re-engineering and quality meetings.
- Developed the standards for maximum capability by using optimum power, torque and number of pass utilization of machine.
- Deriving the optimal parameters for improving the quality of strip shape based on a set of mill, material and process parameters.