Senior Sap Basis Hana Consultant Resume
4.00/5 (Submit Your Rating)
Boise, ID
PROFESSIONAL SUMMARY:
- 11 Plus years of experience in SAP Landscape Architectural Design, Planning Technical Migration, SAP Green Field Implementation, SAP OS DB Migration, SAP HANA Migration, SAP Version Upgradation, SAP Data Center Migration, SAP Solution Manager Configuration and SAP BASIS and NetWeaver Administration.
- SAP HANA Migration with DMO from DB2 9.7, 10.5 and MSSQL 2012 to HANA SPS 1.0 SPS 06 SPS 10
- OS DB Migration from AIX 6.1 DB2 9.7 to RHEL 6.5 DB2 9.7
- SAP Version Upgradation Projects from SAP BW 7.0 EHP1 to BW 7.3 EHP1, SCM 5.1 to SCM 7.0 EHP1, SRM 5.1 to SRM 7.0 EHP3, PI 7.1 EHP1 to PI 7.4, ADS 7.0 EHP1 to ADS 7.3 EHP1
- Data Center Migration from UK to Netherlands
- SAP Green Field Implementations with Products SAP ECC 6.0 EHP6, SAP BW 7.4 SR1, SAP SCM 7.0 EHP3, SAP PI 7.4 SR1, SAP Gateway 7.4 SR1 with Fiori, SAP Web Dispatcher 7.41, SAP Solution Manager 7.1 SPS8
- SAP Production L4 Support with Products SAP ECC 6.0 EHP7, BW 7.4, BOBJ 4.2, SCM 7.0 EHP3, PI 7.4, Portal 7.3 EHP1, Redwood CPS, Tax ware, BSI Tax Factory 10.0, Solution Manager 7.1 SPS8
- Performed Greenfield Implementation for Products like SAP ECC 6.0 with EHP6 on AIX 7.1 with DB2 10.5, SAP BW 7.4 SR1 on AIX 7.1 with DB2 10.5, SAP CRM 7.0 EHP3 on AIX 7.1 with DB2 10.5, SAP NetWeaver Gateway 7.4 SR1 for Gateway and Fiori on AIX 7.1 with DB2 10.5, SAP NetWeaver PI 7.4 SR1 on AIX 7.1 with DB2 10.5 and SAP Solution Manager 7.1 SPS08 on AIX 7.1 with DB2 10.5
- Installation of Dialog Instance for SAP Business Suite on Linux environment RHEL 6.5 with DB2 10.5
- Build new ECC 6.0 system on Distributed environment with Export/Import Method
- Configured ALE and EDI configuration to distribute Master data and Transactional data between SAP and Non - SAP Systems
- Have implemented SAP Solution Manager with Configuration including System preparation and basic Configuration and Managed systems configuration
- Performed Configuration of SAP Solution Manager System Monitoring for Satellite Systems with Custom Templates.
- Configured SAP Automatic Maintenance Certificate Distribution to Managed Systems in SAP Solution Manager, EWA Alert
- Configured SAP Router in SAP Solution Manager to get connected to SAP Network
- Provided SAP Landscape Architectural Design for SAP Green Field Implementation like ECC 6.0, BW7.4, PI 7.4 and Solution Manager
- Imparted SAP Project Landscape Design for SAP Version Upgradation from SAP R3 4.6c to ECC 6.0 EHP4, SAP BW 7.0 EHP1 to SAP7.3 EHP1 and SAP SCM 5.0 to SAP SCM 7.0 EHP3
- Have worked on Private Cloud
- Performed Version Upgrades of products SRM, SCM, BW, CRM to NetWeaver 7.3 with EHP1 on AIX 7.1 with DB2 10.5
- Performed SAP OS Migration from AIX 6.1 to SLES 11 of ECC 6.0 EHP6 System with DB2 9.7
- Performed Data Center Migration with Export/Import method using SWPM
- Performed HA configuration on Power HA AIX 7.1 environment to activate cluster in SAP ECC 6.0 EHP6 to mitigate unavailability of Production system
- Have performed Dual system landscape build for the Version Upgrade Project to avoid interruption to the ongoing production landscape activities. Thereafter coordinated with Functional team and Business to in corporate the changes from Project Landscape to the productive landscape systems DEV and QA
- Have extended support to Project team members to fix the issues aroused in Performance, SI Testing using the HP Quality Center tool to track the defects aroused during the process
- Evaluated New Hardware Requirement for New SAP Products using Quick Sizer with Throughput Based Sizing
- Client Maintenance, STMS, Client Copies (Local Client Copy, Client Export/Import, Remote Client Copy)
- Performed Extensive Performance Tuning by analyzing SQL statements with respective trace and opted Memory parameters and Adapted R/3 buffers
- Have worked on User Administration like creating users, Roles, assigning Roles to Users, Modifying Roles based on Business requirement
- NWA 7.4 Administration
- Performed Support Package Update through SDM, JSPM, SUM
- SLD Administration and SLD Repair by copying the original namespace to a reference namespace and update the content of reference namespace and repair the original namespace
- Configure SLD Data Supplier Service to send to system information to SLD and Integration of SAP Systems into SLD by configuring SLD Data Supplier Service in AS ABAP & AS JAVA Systems
- Patched SLD CIM Model and CR Content
- Analyzed Thread Dump to provide RCA for Java Memory Issues in NWA
- Handled Java startup issues due to semaphores and shared memory segments
- Provided fix to the recurring issue related to server node goes down in an AS Java application server by analyzing the trace file and opted the JVM parameter
- Performed Installation of SAP Web Dispatcher 7.4 and Configuration
- Configured CTS+ for SAP PI 7.4 SR1 with close coupling
- Ran Configuration wizard for SAP NW PI 7.4 system to perform Initial configuration and after Version Upgrade as well as Support Package Update
- Installation and configuration of B2B in PI 7.4 system
- Performed Installation of SAP CPS 8.0 by Redwood on NetWeaver 7.30 with EHP1 on RHEL 6.5 with DB2 10.5
- AS Java system copy using SWPM and Build AS Java System with Export/Import using SWPM and dump from SMP
- Installation of SMD Agent and SAP Host Agent in SAP Solution Manager and Managed System
- Performed HANA DMO from SAP BW 7.3 EHP1 MSSQL to SAP BW 7.4 HANA SPS 10 Revision 102 SLES 11 SP3 in HP Appliance
- Performed HANA DMO from SAP SCM 7.0 EHP3 MSSQL to SAP SCM 7.0 EHP3 HANA SPS 10 Revision 102 SLES 11 SP3 in HP Appliance
- Imparted HANA Appliance Design by Assessing the Requirement from the Source Database Foot print using ABAP Report
- Configured DR setup for SAP HANA Production system between Primary Site and Secondary Site with Asynchronous Replication Method
- Optimized Master HANA Node with Scale Out nodes to redistribute tables and get High Availability of HANA Database during Failover of a node
- Performed Hana Migration from SAP CRM 7.3 EHP1 DB2 10.5 RHEL 6.5 to SAP CRM 7.3 EHP1 HANA SPS08 RHEL 6.5 with DMO
- Performed Hana Migration from SAP BW 7.0 EHP1 DB2 10.5 RHEL 6.5 to SAP BW 7.4 SR1 SPS 08 HANA SPS10 RHEL 6.5 with DMO
- Performed HANA System Refresh for SAP SCM 7.0 EHP3 HANA SPS 10 SLES 11 SP3, SAP BW 7.4 HANA SPS 10 SLES 11 SP3
- Performed SAP HANA 1.0 with SPS 10 installation on RHEL 6.5 using hdblcmgui Tool
- Configured HANA System into SLD to send Technical Component Information to Central SLD
- Performed load balance in the SAP HANA System to distribute load by adding another node and to act as standby node during failover and Mounted file systems on Scale-Out environment with Server Hardware Storage Connector API
- Handled memory bottlenecks like Out of Memory situation in SAP HANA production system in such a way by partitioning tables, Optimizing Memory Parameter and Patching HANA Database with Current Revision
- Scheduled HANA Database Backup in DBACOCKPIT
- Performed SAP HANA upgrade from SAP HANA SPS 09 Rev 93 to SAP HANA SPS 10 Rev 102
- Worked Extensively with SAP HANA Studio to fix the issues related to HANA Performance
- Performed SAP HANA Transport Configuration using CTS Plus to Transport HDBLM Objects across the landscape
- Performed Table Partition among Large Column Store Tables horizontally by distributing sub tables into various nodes
- Configured SLT Server in a Standalone system and established connectivity with SAP and Non-SAP systems like Oracle and MS SQL to get data into SAP HANA database
- Have knowledge on VMWare VSphere for HANA Environment
- Have knowledge on HP Store for data storage
- Have knowledge on HANA Enterprise Cloud and PAAS, IAAS
PROFESSIONAL EXPERIENCE:
Confidential, Boise, ID
Senior SAP Basis HANA Consultant
Responsibilities:
- Performed HANA Migration from SAP BW 7.3 EHP1 MSSQL to SAP BW 7.4 HANA SPS 10 Rev 102 on SLES 11 SP3 on the hardware HPE CS500 with Scale up Configuration, added ASCS, SCS, PAS and Additional Application Servers on SLES 11 SP3
- Performed HANA Migration from SAP SCM 7.0 EHP3 MSSQL to SAP SCM 7.0 EHP3 HANA SPS10 Rev 102 on SLES 11 SP3 on the hardware HPE CS500 with Scale up Configuration, added ASCS, PAS and Additional Application Servers on SLES 11 SP3
- Performed HANA System Refresh for SAP SCM 7.0 EHP3 HANA SPS 10 Rev 102 on SLES 11 SP3, SAP BW 7.4 HANA SPS 10 Rev 102 on SLES 11 SP3 with HANA Studio
- Performed installation and configuration of PAS and Secondary Application Server for Migrated HANA System in SLES 11 SP3
- Performed HANA System replication with Configuration between Primary Data Center and Secondary Data Center
- Provided extensive fixes to post HANA Migration issues in SAP SCM and SAP BW environments related to Out of Memory and various performance issues.
- Worked on HANA Performance issues related to Shared Memory Utilization more for Row Store Tables and Column Store Tables in such a way by reorganizing Row Store Tables and reduced the allocation of data for Column Store Tables
- Scheduled Periodic Garbage collection from unused memory of Row Store Tables and Column Store Tables to accommodate the memory requirement for the system
- Fixed the SAP HANA System hung due to high CPU usage by defining transparent huge page enable to never
- Protected SAP HANA System from excessive memory usage by limit the single statement with the specific value
- Configured SNC for SAP ABAP Systems with SSO
- Configured Distribution Model in Production ECC to make a flow of Master Data from Production to Quality with Data Filters
- Worked on HP Output Management System Dazel to print documents from SAP
- Performed Tax ware update every month in SAP ECC system to get latest patch updates into the system.
- Performed BSI Tax Factory update for SAP HCM to get latest patch updates once in six months
- Optimized dialog response time of SAP ECC system with Table Reorganization, optimizing expensive SQL Statements by respective team and optimizing secondary indexes against a table
- Handled long running process chain loads from ECC to BW by optimizing heap area in the SAP ECC
- Configured SAP CPS Redwood by creating Process Servers for a SAP system to schedule jobs
- Installation of Platform Agent in each SAP Application Server of Managed system to schedule jobs at Operating System end
- Handled various PI issues like Cache Connectivity Test is getting failed and fixed those by analyzing the logs of Default Trace
- Tuned Memory Parameters of ABAP in such a situation where memory bottleneck has occurred in the system and JAVA for SAP EP 7.3 EHP1 for struck situation of the instance in related to Java Heap Memory
- Analyzed Java Performance issues with Default Trace and Thread Dump of Java, provided fix to tune Java heap memory parameters
- Managed Java stack startup issues regarding Shared Memory Segments, Semaphores and J2ee admin locked
- Configured PI as central SLD and Created data suppliers on Managed systems to send data to SLD
- Installation of SAP Host Agent on each physical host of Managed system and Solman and SMD agent installation on physical host and virtual host of Managed system and Solman to establish technical monitoring
- Installed SAP Host Agent in PAS and established communication with DMO by registering SUM with SAP Host Agent
- Ran DMO on PAS to perform the HANA Migration
- Analyzed logs of DMO located in SUM Directory to fix the issue aroused during Migration related to max no of connections reached, Table error and Index error
- Established Connection to SAP Service Market Place from SAP HANA System to get connected to SAP when an issue occurs
- Analyzed Trace files, Configuration Files and FullSystemInfoDump while fixing an issue like Database is not coming up
- Configured DB Backups in DBACOCKPIT
- Configured System replication between Primary data center and Secondary Data Center with Asynchronous Method for HANA system
- Performed the connectivity Test replication between Primary Data center and Secondary Data Center to check the network speed to transfer data
- Have performed Table partition for large tables with Hash method
- Performed configuration related to Workload mappings for OLTP, OLAP
- Created users and assigned respective roles in SAP HANA Studio
Confidential, Houston, TX
Senior SAP Basis HANA Consultant
Responsibilities:
- Handled various PI issues like Cache Connectivity Test is getting failed and fixed those by analyzing the logs of Default Trace
- Worked on issues related to SLD connectivity is not established in PI 7.3 EHP1
- Performed Language installation in SAP System with SMLT
- Performed System Copy of Sandbox System with Development environment for all the environments like ECC, BI, Portal and SRM
- Worked as a Technical lead to manage the technical deliverables to the client
- Tuned Memory Parameters of ABAP in such a situation where memory bottleneck has occurred in the system and JAVA for SAP EP 7.3 EHP1 for struck situation of the instance in related to Java Heap Memory
- Provided fixes to avoid memory bottlenecks and deadlocks in SAP
- Analyzed Java Performance issues with Default Trace and Thread Dump of Java, provided fix to tune Java heap memory parameters
- Performed EHP Upgrade of CRM system from CRM 7.0 EHP1 SPS 13 to CRM 7.0 EHP3 SPS 3 on db2 10.5 and AIX 7.1
- Performed SAP BOBJ Version Upgrade from BOBJ 4.1 SPS 6 to BOBJ 4.2 SPS2 with DB2 10.5 on AIX 7.1 and installed new license key to get right component support
- Established connectivity from BOBJ 4.2 to third party databases like Oracle, SQL with ODBC
- Provided fix to the issues during Upgrade of EHP for PI and BW systems by analyzing the SUM log in such a way by changing the parameters, and ran db2updv to update db2 to the current fix pack level
- Performed BSI Tax Factory upgrade from 9.0 to 10.0
- Managed Java stack startup issues regarding Shared Memory Segments, Semaphores and J2ee admin unlocked
- Performed SLD repair by creating temporary namespace and update the content of temporary namespace, later repaired the original namespace
- Fixed SXMB IFR issues in PI 7.3 EHP1 by configuring Integration server in SXMB ADMIN
- Worked with Integration Repository and Integration Directory Objects in SAP PI 7.4 SR1 with EHP1
- Configured PI 7.4 SR1 as central SLD and Created data suppliers on Managed systems to send data to SLD
- Installation of SAP Host Agent on each physical host of Managed system and Solman and SMD agent installation on physical host and virtual host of Managed system and Solman
- Installed HANA 1.0 SPS10 Rev 102 on a separate host with TDI HPE ProLiant DL580 Intel E7 8800v3 Scale-up to perform Migration to RHEL 6.5 from SAP BW 7.0 EHP1 DB2 10.5 RHEL 6.5
- Installed SAP Host Agent in PAS and established communication with DMO by registering SUM with SAP Host Agent
- Ran DMO on PAS to kick off Migration
- Performed Hana Migration from SAP BW 7.0 EHP1 DB2 10.5 RHEL 6.5 to SAP BW 7.4 SR1 SPS 8 HANA SPS10 Rev 102 RHEL 6.5 with DMO
- Analyzed logs of DMO located in SUM Directory to fix the issue aroused during Migration related to max no of connections reached, Table error and Index error
- Stop and Start of HANA Database with Various tools like HDB, Sapcontrol and SAP HANA Studio
- Performed Table Partition among Large Column Store Tables horizontally by distributing sub tables into various nodes
- Performed HANA Client Upgrade to Rev 102 to fix SAP BW Application Server dump issue
- Done SAP HANA Backup and Recovery as part of SAP Quality BW System refresh
- Performed SAP HANA Transport Configuration using CTS Plus to Transport HDBLM Objects across the landscape
- Performed Table Partition among Large Column Store Tables horizontally by distributing sub tables into various nodes
- Worked Extensively with SAP HANA Studio to fix the issues related to HANA Performance
Confidential
Senior SAP Basis and HANA Consultant
Responsibilities:
- Performed 24*7 Production Support for Production Landscape with L4 service
- Performed EHP upgrade on SAP PI 7.3 from SPS09 to PI 7.3 EHP1 SPS08 on AIX 7.1 and DB2 10.5 and SAP BW 7.3 SPS 08 to SAP BW 7.3 EHP1 SPS 06 on AIX 7.1 and DB2 10.5
- Performed activation of various business functionality in the switch framework
- Handled various PI issues like Cache Connectivity Test is getting failed and fixed those by analyzing the logs of Default Trace
- Worked on issues related to SLD connectivity is not established in PI 7.3 EHP1
- Have performed Table Reorganization and Index Rebuild for the required tables to claim the space and to increase the performance of the database
- Performed fix for memory issues in SAP SRM 7.02
- Worked as a Team lead to manage people to provide technical delivery
- Handled shopping Cart related issues like none of the users are able to create shopping carts in SRM after SPS update
- Performed processing of IDOcs which are not sent to destination due to Partner Profiles issue in ECC system
- Installation of Dialog Instance to accommodate load for Central Instance on AIX 7.1 and DB2 10.5
- Provided fix to the issues during Upgrade of EHP for Portal, PI and BW systems by analyzing the SUM log in such a way by changing the parameters, and ran db2updv to update db2 to the current fix pack level
- Performed SLD repair by creating temporary namespace and update the content of temporary namespace, later repaired the original namespace
- Performed installation of Solman 7.1 and System Preparation and Basic Configuration after immediate installation
- Ran Managed Systems Configuration for various systems like ECC, PI, BI
- Turn Maintenance mode on for SMD during SPS Patching and upgrade of Solman, later turned off to listen from SMD
- Configured EWA in Solman 7.1 for Managed systems with SOLMAN SETUP
- Created data suppliers on Managed systems to send data to SLD
- Performed Automatic Maintenance Certificate distribution to Managed systems from Solman with respective configuration
- Installation of SAP Host Agent on each physical host of Managed system and Solman and SMD Agent on each host of Managed System and Solman
- Assigned SMD agents for Managed systems as part of Managed System Configuration
- Performed installation of GRC 10.1 on AIX 7.1 DB2 10.5
- Configuration of GRC 10.1 with Managed Systems ECC and SRM by adding plug-ins and provided required configuration in GRC 10.1 and Managed systems IMG
- Stop and Start of HANA Database with Various tools like HDB, sapcontrol and SAP HANA Studio
- Performed SAP HANA Backup and Recovery
- Worked Extensively with SAP HANA Studio to fix the issues related to HANA Performance
- Have installed and Configured SAP HANA Studio and SAP HANA Client
- Monitored the SAP HANA system to run system normal and be proactive to fix the alerts appeared in the system
Confidential
Senior SAP NetWeaver Consultant
Responsibilities:
- Build SAP NetWeaver PI 7.4 SR1 with DB2 10.5 on RHEL 6.5
- Installation of B2B Adapter in PI7.4
- Performed patching of PI 7.4 components using SUM
- Ran Configuration Wizard for initial and advanced functional units in PI 7.4 and after Support Package Update
- Worked on Enterprise Services Repository and Integration Directory by importing B2B content
- Configured CTS Plus in PI 7.4 with close coupling
- Worked on Exchange Profile Parameters like adjusting client for ESR, ID, IS
- Configured SLD in PI 7.4 to get communicated with Source system
- Configured SLDAPICUST in ECC 6.0 to exchange data with PI 7.4 and confirmed this with SLDCHECK
- Configured Go-Live Analysis Session Report in Solution Manager 7.1 SP9
- Implemented recommendations suggested in Go-Live analysis report
- Handled issues with ESR, ID while launch due to javaws configuration
- Configured post GO-Live Verification session after 4 weeks in Production system and Implemented recommendations
- Worked on PI 7.4 Cache Connectivity issues
Confidential, Burbank, CA
SAP NetWeaver HANA Consultant
Responsibilities:
- Performed initial check on Target system to meet the requirements to get HANA Migration like java 1.6, gtk2, libsh are installed
- Ran HanaHWCheck Python Script to check the Hardware Consistency with SAP HANA
- Installed HANA 1.0 SPS06 on a separate host to perform Migration on SLES 11 SP2
- Installed SAP Host Agent in PAS and established communication with DMO
- Ran DMO on PAS
- Generated Migration Key and provided during Migration
- Analyzed logs of DMO located in SUM Directory to fix the issue aroused during Migration
- Installed unenforced license to function system during memory exhaustion
- Analyzed respective log files from /var/tmp during installation and Upgrade of HANA components
- Configured Parameters /clonepar/index creation=brfore load in SAPup add.par file of SUM Directory to avoid Out of Memory error on Index Server and /SUM/abap/var/HDBCONFIG.LST file after the phase HDB CONFDMP as per the requirement of migration as permanent
- Created indexes on Target Database which are missed and shown by DMO Tool during Post Processing Phase
- Dropped tables of Transparent type instead of cluster on Target system as part of Migration
- Made the function module UPG DMO SLT STATUS remotely enable on Target system to continue
- Configured System backups for SAP HANA like Daily Full Data Backup to external storage device in SAP HANA Studio with Backint Interface
- Configured Log Backups when one third of Log Directory is full to External device in SAP HANA Studio and Backup Strategy for Configuration Files to external Storage device with SAP HANA Studio
- Added host to the SAP HANA System to distribute load and to act as standby node during failover
- Mounted file systems on Scale-Out environment with Server Hardware Storage Connector API
- Performed Data Volume Encryption for Data Volumes by generating Root Keys
- Checked the system to function normally during Failover, by checking systems tab in SAP HANA Studio
- Configured SLD Registration with SAP HANA to send Component information to Central SLD
- Troubleshoot the SAP HANA Database issues when database is down using Trace files available in SAP HANA Studio tab traces with the help of sap start service
- Analyzed Expensive SQL Statement with Plan Visualizer in SAP HANA Studio, in such a way to Accelerate the performance by Aggregating the respective
- Loading and Unloading tables from and to SAP HANA Database memory with SAP HANA Studio, when required especially during Performance issues
- Ensure the respective traces on and off when required, especially during Performance issues
- Recovered the SAP HANA system with full logs when system was crashed using HANA studio
- Created backup catalog using existing backups when corrupted
- Configured automatic update of SAP HANA studio
- Installed additional Application Server Separately on Migrated environment to accommodate load
Confidential, Burbank, CA
Senior SAP Basis Consultant
Responsibilities:
- Prepared high level plan for the OS/DB Migration Project and send to SAP for Approval
- Ran pre checks for Migration like ICNV is not started and Prepare phase of upgrade is not started and Removed failed updates and make DB statistics up to date
- Ran report SMIGR CREATE DDL on Source System as Batch job to copy database objects which are non-standard
- Performed SAP system Export using SAP Standard tools like SWPM and Selected Target system installation method as Migration Load based
- Prepared strategy for minimizing downtime using table splitting and package splitting options
- Handled failed import, to be started again after changing the status of entries in export state.properties file by changing the value to 0 after correcting the issue and repeat the import
- Ran the report RS BW POST MIGRATION in target system for BW specific objects and Tuned SAP Profile parameters and Optimized Database Parameters as per target system
- Imported printers and Configured Spool server into Target system and Re configured TMS and Applied SAP License in Target system
- Released system for functional test, afterwards Go/No Go decision by Management
- Implemented post GO-Live Verification session recommendations
- Provided Post Go-Live support for 4 weeks, during this opted Memory parameter related to Database and SAP when required
Confidential, Burbank, CA
Senior SAP Basis Consultant
Responsibilities:
- Performed 24*7 Production Support for Production Landscape with L4 Support
- Managing Inbound and Outbound queues in SAP ECC, BI & SCM
- Provided analysis of Long Running Background jobs which are not expected to be and recommend Functional people, ABAPers to opt selection and optimize programs
- Performed processing of IDOcs which are not sent to destination due to Port failure at third party end
- Performed System Copy of Quality Assurance System with Production System for all the productions in the environment like ECC, BI, Portal, SCM and SRM
- Tuned Memory Parameters of ABAP in such a situation where memory bottleneck has occurred in the system like No more page memory
- Worked as Team lead to manage deliverables
- Handled Buffer Synchronization issues when a particular buffer changes frequently by changing the object status not to include in buffer if not required
- Controlled the growth of rapidly developing tables with variants, by setting up Archiving object and scheduled batch job to move data to storage, later the data will be deleted from the Database
- Printer issues related to technical like driver compatibility and connectivity
- Analyzed Java Performance issues with Default Trace and Thread Dump of Java, provided fix to tune Java heap memory parameters
- Establishing Communication between AS JAVA and External Database to fetch data from Non-SAP Applications in Config Tool as New JDBC Connection
- Exported Java Objects and imported into Portal system with Transport Package editor
- Performed EHP Up gradation from EHP1 SPS 08 to EHP2 SPS 03 for AS Java Stack using Business Package Method with JSPM in SAP Enterprise Portal 7.01
Confidential
SAP Basis Consultant
Responsibilities:
- Analyzed the Hardware requirements with Quick Sizer as per the Specifications given by Client
- Requested required File systems to be mounted as part of SAP System Setup
- Downloaded required SAP Product Software from Market place and placed into Mounted Directory
- Analyzed Installation guide and prepared Customer Specific Installation Guide with the Notes and other requirements to be used for next Installations
- Prepare to Run SAPINST
- Generation of Solman key by registering the system into Solution manager
- Installation of Oracle 11g with Patch set 1 and SBP Deployment
- Perform Post Installation activities like Client Creation, STMS Configuration, Critical users Creation, SPS Patching, SGEN and Integration to other systems in the Landscape
- Refreshed Quality system from Production with BR Tools and SAPINST Export / Import Method of AS ABAP and AS JAVA
- Analyzing long running Info process chains and made to run smoothly by Optimizing Indexes of the respective report and Reorganization of Table
- Optimizing Performance of SAP BI 7.01 System by analyzing Expensive SQL Statements and Memory Parameters, by considering for the possibility of new indexes or optimizing the program code
- Performed Upgrade of NW 7.0 EHP1 SPS3 to EHP2 SPS8 for ABAP and JAVA
- Established Integration between Legacy systems and SAP Netweaver BI 7.01 for Data Loading like Creation of Data source in RSA1
- Installation of Tivoli Agent and TDP Agent with Configuration to Server to Perform SAP system DB Backup and Application Backup and Defined Backup strategy in Crontab
- Installation of SAP SCM 7.0 With EHP1 on AIX 6.1 and Oracle 11g
- SAP Live cache Server 7.7 installation on AIX 6.1 and MAX DB and Installation of SAP Optimizer Engine
- Configuration of satellite Systems STMS with Solution Manager as Domain Controller
- Version Upgrade of ADS 7.0 EHP1 SPS 17 to ADS 7.3 EHP1 SPS 8 on AIX 6.1 and Oracle 11g
- Configuration of SAP Maintenance Service Connections in Market Place for SAP Systems which are newly build in the environment
- Implemented the recommendations provided by SAP as Go-Live Verification report after 4 weeks of Post Go-Live support
Confidential, Santa Clara, CA
SAP Basis Consultant
Responsibilities:
- Registered objects & Generate keys for developers in service market place
- Performed Client copy locally and Client Export/Import followed by Post Processing Steps
- Optimized system response time by creating logon groups and assigning to instances
- Registered SAPCCM4X and SAPCCMSR agents in AS ABAP and AS JAVA Systems
- Load balancing of spool requests with Logical Spool Server
- Day to day spool issues like None of the production user able to print sales order due to host spool server is down
- Analyzed Oracle alert log to trace the issue about check point not complete
- Worked as Team lead to manage deliverables
- Enhancement of Redo Log File Size to avoid frequent Check Points
- Tuned SAP Memory Parameters and DB Parameters as part of optimization
- Analyzed dumps and offer relevant fix to the customer with SAP Note
- Perform Complete Recovery to bring database to consistent state
- Patching SAP Web Dispatcher from 7.0 to 7.2 with configuration
- Applied Patches for ABAP Stack with SPAM from SPS03 7.01 to SPS09 7.01
- Java Stack Patching with JSPM from SPS03 7.01 to SPS09 7.01
