We provide IT Staff Augmentation Services!

Senior Sap Netweaver Resume Profile

5.00/5 (Submit Your Rating)

WORK EXPERIENCE:

Confidential

Senior Netweaver

  • Installed GRC 10/Netweaver 7.4 on three system landscape on AIX/DB2UDB 10.7
  • Installed BI 7.3 AIX/DB2UDB 9.5
  • Pre and Post Golive BI 7.3 development and production support
  • Patch BI 7.3 Stack upgrade
  • Install HANA SP8 Database POC Sandbox
  • Install BW 7.4 on HANA POC Sandbox
  • Perform Solution Manager Stack upgrade from SP4 to SP10 for both ABAP and JAVA.

Confidential

Senior SAP Netweaver

  • Upgrade ECC5 to ECC6 EHP6
  • Install BI 7.31 /ABAP on Linux CI AIX Oracle 11G
  • Install Netweaver 7.31 Gateway Server Linux CI AIX Oracle 11G
  • Production Support for CRM 7.0 EHP2
  • Primary Support for BI -7.31 Development Support
  • Primary Support for BI 7.31 Production Support
  • Primary Support BPC
  • Capacity Planning For BI DB
  • Homogenous System Copy for BI 7.31 from Production to QA
  • Build BI N 1 Development landscape
  • Design TMS strategy for N 1 Landscape
  • Using SUM to perform Stack upgrade to Portal and Abap systems Landscapes.
  • Primary support for Libelle System Copy Tool
  • Primary Support for Adapter SAP BCM for Cisco PBX to SAP CRM

Confidential

Principal Netweaver

  • Upgrade ECC5 to ECC6 EHP5
  • Install MII 12.2 on MSSQL/Windows 2008
  • Installing CRM 7.0 EHP2 ABAP
  • Using Add-On Manager Patch CRM ABAP to SP4
  • Installing Netweaver 7.3 EHP2 JAVA
  • Using SUM Patching NW JAVA 7.3 to SP4
  • Upgrade GTS 8 running on 640 to GTS 10 running on NW7.0
  • Upgrade EHP2 Upgrade on BW 7.0 w- Kernel 720-200
  • Upgrade to SCM APO 7.0
  • Install Solution manager 7.1
  • Install Hana 1.0 , SLT
  • Install BW731 on Hana
  • Migrate BW 7.3 to Hana POC
  • Migrate ECC6 EHP6 on Linux/Maxdb to Windows 2008/Max DB for Development QA and Production
  • Presales conference calls for upgrade strategies, Installation strategies.

Confidential

  • Windows MSSQL 2008 64/bit Durham
  • Upgrade Client 4.7 environment to ECC 6.0 Windows/MSSQL W- EHP5 Rampup
  • Basis Architecture responsible for all hands on activities, all architecture Client, Transport, Upgrade strategies as well as mentor/manage one Portal administrator, and two junior Basis employee.
  • Migrate existing 4.7 environment from Windows and MSSQL 32bit to 64 Bit
  • Upgrade landscape from 4.7 to ECC 6.0
  • JAVA System copy using migration tool kit.
  • Upgrade Portal Java stack from 7.0 EPH2 to 7.3
  • Rampup Support for EHP5/MSS/ESS
  • Apply all Support Packs for ECC 6.0
  • Configure CHARM and CTS for ECC 60 and Portal 7.1
  • Configure CCMS System monitoring and alerting VIA Solution Manager
  • Configure Earlywatch reports for satellite systems
  • Design Upgrade Strategy
  • Upgrade ECC60 to EHP5
  • Upgrade Solution Manager to EHP1
  • Successful completion of client upgrade from 4.7 to ECC60 w- EHP5 and Portal EHP2.

Confidential

  • Department Of Treasury State of Michigan
  • Basis lead for IS- Public Sector Treasury Module BRF Business Rules Framework
  • Supporting Deloitte and State SAP development and customization initiative for Business Tax Returns project.
  • Manage Transport management for Development and customization efforts.
  • Mentor State Basis team on best practices regarding to supporting end users, supporting development efforts
  • Create PowerPoint presentations and conduct training sessions for Basis Activities, TMS strategies, OSS overview and Notes Application.

Confidential

Dr Pepper/Snapple

  • Production support for system ranging from 4.6C to ECC 6.0
  • Production Support of Functional areas FICO/GL, HR, SCM, MDM
  • Client Environment is AIX 5.3, LINUX SUSIE and WINDOWS/64 bit with Oracle 10.2 database
  • Project Support Installation of MDM 7.1 on Windows 64Bit and Oracle 10.2
  • Project Support Installation of MDM 7.1 on Windows 64Bit and Oracle 10.2
  • Project Install SP3 to MDM 7.1
  • Project Install MDM PI ADAPTER to PI 7.0
  • Project Install MDM JAVA API to PI 7.0
  • Project Install MDM PI CONTENT to PI 7.0
  • Project Install MDM Web Services t o EP 7.0
  • Project Install MDM Web Services Runtime 7.1
  • Project Install MDM Business content to EP 7.0
  • Project Install MDM Change Tracker 7.1 on EP7.0
  • Stack upgrade PI 7.0 from SP13 to SP19
  • Upgrade PI 7.0 content SAP BASIS and SAP ABAP to SP19
  • Update SAPXIAFC19 on PI7.0
  • REVTRAC transport support for landscapes.

Confidential

Senior SAP Basis Consultant

  • Basis production support for ECC, BI 7.0 XI , CRM and MI production systems.
  • Production Support for functional areas, FICO/GL , HR, CCS, SCM, MI
  • Client Environment is Solaris 10 with Oracle 10.2
  • Primary Basis support for Solution Manager 7.0 , CHARM and Maintenance Optimizer and SLD
  • Configure Charm for new system Landscape transport support.
  • Perform maintenance patches for Solution Manager ABAP Java Stacks for Netweaver 7.0 SM systems using SAINT, SPAM and JSPM.
  • Monitor SLD RFC's problems..
  • Apply EHP4 Enhancement Service Packs 4 for JAVA/ABAP Stack
  • HR Support includes applying BSI Tax Factory TUBS to HR landscape.
  • Using Maintenance Optimizer to download stacks patches for Enterprise.
  • Create Solution Manager RFCs to Satellites systems using Tcode SMSY.
  • Install and Support HP Quality Center Addon to Solution Manager Server
  • Install and Support SAP TAO Test Acceleration Optimization
  • Manual online and offline backups using brbackup and brrestore.
  • Homogeneous System copies using brrestore.

Confidential

Basis OS Migration

  • Migration support for Mylan Pharmaceuticals of a division from Merck Pharmaceuticals which had over 30 SAP systems over 5 countries. Spain , France, Ireland, England and Germany
  • Utilizing support from SAP Germany and IBM Germany.
  • Mylan new AIX servers were hosted by IBM in Frankfurt. Merck data center was in Manheim Germany.
  • SAP Germany built the data exports in Manheim Germany and transferred them to IBM Frankfurt data center which stage the exports. The Basis team in Morgantown W.V. then built the landscape using sapinst and R3setup using the exports files from IBM Frankfurt. The release were a combination from 4.6C to ECC5. These tasks were done by a team of 10 Basis members to migrate for 5 countries DEV QA and Prodution systems. .
  • Basis migrations support for Solaris/Oracle Windows/SAPDB migration to
  • AIX servers and Windows blades servers.
  • Migrate release 4.6C ECC 5.0 from Solaris/Oracle to AIX Oracle using either R3setup and sapinst.

Confidential

Senior SAP Basis Consultant

  • Primary support for CRM 5.0 and Portal 7.0
  • Client Environment is AIX 5.3 and DB2 UDB 7.0
  • Utilize Visual Administrator, Configtool, Software Deployment Manager SDM and logviewer to support and maintain Java stack and SAP Java applications
  • Maintain Netweaver 2004S CRM Abap/Java Stack
  • Maintain/upgrade MAPBOX on Java stack
  • Production Support for R/3 4.7, CRM 5.0 and BI 7.0

Confidential

  • ECC60 Upgrade
  • Migrate 4.6C/32 Bit/SQL 2000 to 4.6C/64bit/SQL2005
  • Install and configure Netweaver 2004S Java Stack and Adobe Document Server
  • Upgrade SAP 4.6C/64bit/SQL2005 to ECC60/64bit/SQL2005
  • Perform Post ECC60 upgrade task
  • Install Solution Manager 4.0
  • Help configure Maintenance Organizer on Solution Manager
  • Notes research for problems/issues
  • Setup SAP Help for ECC60 on IIS
  • Install Netweaver 2004s JAVA Stack Adobe Document Server for HR PDF forms.
  • Activate extensions sets
  • Help develop rollout strategy for gui rollout for version 710 SAPgui.

Confidential

  • Associates SAP Basis/Portal Vera Bradley AFS 5.0
  • Install SAP ECC 5.0/64bit w- AFS 5.0 system on Windows X64/MSSQL 2000/64Bit 2005.
  • Install AFS Addon
  • Install Metamore AFS Client Bolt On.
  • Troubleshoot Portal Development issues EP 6.0/SP18
  • Install IDES AFS 5.0 system
  • Install and Configure EP 6.0/SP18 with Rapid installer 2.5.
  • Install BI 3.5
  • Install BI 7.0 on Netweaver 2004s
  • Homogeneous System copy for ERP2004SR1 and BI 3.5
  • Primary Basis support for Integration Testing and Mock Go-Live Testing
  • Build and Support Security Roles for SD, AP, AR, MM/PP FI/CO
  • Design Strategy for Clients and Transport landscape.

Confidential

  • ESS/MSS Portal Basis Support
  • Support Portal ESS/MSS HR implementation
  • Environment is HR/ECC 5.0
  • Monitor Portal Logs using Log Viewer
  • Add Portal Support Packs using sapinst.
  • Configuration changes to the J2EE engine using Visual Administrator
  • Monitoring the Portal logs using log viewer
  • Generating Treads dumps
  • Maintaining exports and imports of Iviews, pages, from DEV to QA to PRD.
  • Using Software Distribution Manager to add applications to the Portal
  • Monitoring the J2EE full garbage collections in PRD.
  • Move Portals Deployments via SDM.
  • Portals imports objects from DEV, QAS and Production
  • Use Log viewer, Visual Administrator and Config tool for Portal maintenance.
  • Basis support for Redwood Job Scheduling Package schedule jobs, adhoc running of jobs, Change schedule, deactivate Queue

Confidential

  • Basis Lead for 4.6C to ECC 5.0 Upgrade
  • Manage/Mentor to Basis consultant for upgrading to ECC 5.0
  • Peform NT/MSSQL 4.6C upgrade to ECC 5.0

Confidential

  • Basis Lead for 4.6B to ECC upgrade.
  • System Copy of BW 3.1, CRM 3.1 and APO 4.0 from PRD to QA
  • Test/Validate interfaces BW, CRM Middleware and APO from QA R/3
  • Upgrade R/3 NT/Oracle release from 4.6B to ECC 5.0
  • Apply notes for pre-upgrade and post upgrade activities.

Confidential

  • Sun Solaris Dual E-10K Shop running Oracle 9 and SAP 4.6C Financials and HR
  • Production support for Basis activities Client Copies, Printer Issues, Performance Monitoring, Development Support
  • Project Lead for Production to QA Homogeneous System Copy.
  • Technical Lead for LDAP to SAP User Master Synchronization project
  • Basis Lead Manage three Basis employees.
  • Security support for FI/CO and HR security

Confidential

Two week assignment to build APO 4.1 w- LC 7.5.0 on W2003/Oracle 9.0.2.6 environment.

Confidential

  • Basis Lead Building a U.S. and U.K. SAP landscape base on W2003/Oracle 9.2.0.5 running 4.7
  • Install Japanese Language
  • Install and configure IVIEWS for Portals 6.0 Stack 11.
  • Configure MS Cluster for SAP and Oracle RAC.

Confidential

SAP Technical Project Lead for BearingPoint Sap Public Service Center of Excellence

  • SAP Basis responsible for managing of BASIS consultants to build Public Sector solutions
  • For Federal, County and Local governments demo templates.
  • Installation and or support of the following R/3 products, Enterprise extension set 200, APO 4.1, ECC 5.0, BW/SEM 3.5, SRM 4.0, CRM 4.0, Exchange 3.0 and Portals 6.0 SP3, ESS/MSS andSolution Manager 3.0.
  • Manage three Basis engineers to build Public Sector Service demo Solutions running Unix and W2003 running Oracle and MSSQL
  • Build SAP R/3 ext-200 solution for Vietnam DEMO on HPUX/Oracle platform
  • Develop project timeline for building COE landscape
  • Support for 22 SAP SID running W2003 on Oracle 9.2 or MSSQL 2000.
  • Perform homogenous system copies from different Intel platforms for both Oracle and MSSQL.
  • Write technical proposals for sales initiatives.
  • Develop MS/Project Tasks to support ongoing technical efforts of 'Center of Excellence'

Confidential

Nortrak

  • Environment is NT4/3.0F/MSSQL-7 Company was bought by a Canadian Company
  • Create Development system from Production copy.
  • Migrate Production SAP system to new Hardware and Disk Storage System EMC
  • Remote support for backups recovery, security, transports, and client administration
  • Technical BASIS Project Lead for the following.
  • Add Canadian Currency to U.S. only currency system
  • Development effort to filter one business unit off of SAP
  • Project to change company name and address information to New Company on Invoice, Bill Of Laden, and Work Orders.
  • New Implementation to migrate 3.0F NT4/MSSQL 3.0F environment to W2K/MSSQL2000/ 4.6C

Confidential

Development System

  • Install BW 3.1 on AIX 5 W- Oracle 9.2.0.4
  • Install Add-On FIN/Basis 150
  • Install SEM-BW Addon 320
  • Install PI BASIS 2002 1 620
  • Upgrade BW Content 320
  • Upgrade Service Packs for BW, BASIS, FIN/BASIS, PI BASIS, BI CONT, BW SEM
  • Activate BW Content

Confidential

Senior SAP BASIS Administrator

  • Installation of 4.7 SR1 Enterprise on WIN2000K/Oracle 9.2
  • Install Oracle 9.2.0.3 patch
  • Install/Configure ITS for web connectivity
  • Install/Configure JAVA SAP gui for Apple Mac desktops.
  • Develop SAP Front-End Solution for Heterogeneous desktop landscape.
  • Setup/Configure OSS connectivity via VPN
  • Configure TMS
  • Install CUA Client
  • Creation OSS ID's for development Team
  • Creation Developers keys for Team.
  • Configure Business Connector for SMTP support to Domino Server
  • Build initial Security roles from configurating FI and MM templates utilizing Profile Generator.

Confidential

  • Installation 4.7 SR1 Enterprise on WIN2000/MSSQL for Production system
  • Train/Demonstrate PRD homogenous system copy procedures to Junior Basis
  • ASAP methodology project
  • BASIS Architect for Client Strategies, Technical Integration Testing, Gui Rollout, Backups Recovery.
  • Install Service Packs for BASIS, ABA, APPL, HR, EA-HR, EA-PS
  • Reconfigure TMS landscape
  • Resolve printing issues for obscure printing devices
  • Design role base security for FI and HR from config template.
  • Develop delegate BASIS technical responsibilities for integration testing.
  • Develop client strategy for integration testing.
  • Activation of EA-PS.
  • Install BW 3.0B on W2000/MSSQL 2000
  • Supported Solution Manager 3.1
  • Mentor Train Junior SAP Basis Consultants in all aspects of Basis technical.

Confidential

  • Security Workshop Miami Florida Sub-Contractor
  • Conduct three day security workshop referencing course material CA940
  • Prepare customer in setting up security for seventy users using SD, FI/CO, MM, PP
  • Teach customer the use of Profile Generator and the technical architecture and concepts of security within the R3 system.
  • Detailed a security implement roadmap for the customer to rollout security in the allotted timeframe.

Confidential

Sub-Contractor

Short term Project to migrate customer 3.0F/MSSQL 7.X environment from one NT4 server to another along with migrating the database to another EMC frame.

Confidential

  • IL Sub-Contractor
  • Short Term project to Upgrade BW-OS390/DB2/AIX CI from BW 2.0B to BW 3.1 on PRD copy.
  • Replace OS390/Upgrade CI with NT CI after Upgrade.
  • Reconfigured Print Devices from AIX to NT
  • Develop Upgrade Strategy MS Powerpoint for Upgrade Team
  • Recommended Upgrade Architecture moving from BW-AIX CI/App servers to NT CI/APP
  • Develop SAP BASIS project plan for TTX BASIS Staff for entire upgrade project.
  • Research OSS for optional upgrade strategies to prevent from installing a CI on OS/390 for Upgrade.

Confidential

Sub-Contractor

  • Work as a team member to analyze the cost to Exxon/Mobil to implement a Technical upgrade to their Everest II OS390/DB2/AIX landscape.
  • Determine the cost driving factors to conduct a technical upgrade to the Everest II OS390 landscape.
  • Conducted fact finding sessions to determine the Hardware Architecture i.e. Mainframe MIPS capacity and utilization, LPARS layout, DB2 versions, DB2 fixpak levels, DB2 members layout, DB2 member fail over layout, DASD utilization , Security Landscape, SAP service packs level, SAP kernel level, AIX OS versions and AIX
  • Work with other team members i.e.: Interfaces, Reports, ALE, BW to develop a costing document for Exxon/Mobil for the Technical Upgrade of their Everest II landscape.

Confidential

DC Sub-Contractor

  • Basis Lead for new SAP 4.6C AIX DB2 UDB 7.2 HR and Payroll implementation.
  • Develop hardware rollout strategy for 4.6C using SAP 4.0B as the legacy system. The challenge for this is to implement the new environment without any purchase of additional hardware using the legacy 4.0B hardware AIX P660, M80, ESS landscape to implement 4.6C
  • Design Client Strategy for new implementation

We'd love your feedback!