Property Manager Resume
5.00/5 (Submit Your Rating)
NY
Untitled Document
PROFESSIONAL EXPERIENCE
Self Employed
Rensselaer, NY
Property Manager,Confidential,7/09 - Present
- Purchased apartment building and managed demo and complete rebuild.
- Ensured project was completed within budget and in accordance with established schedule.
- Completed structural, building, plumbing and electrical requirements to appropriate building codes.
- Managed and coordinated various contractors including obtaining multiple bids, negotiating terms, and managing efforts of chosen vendor to ensure work completed as agreed.
Process Quality Engineer ,Confidential, Schenectady, NY6/08– 7/09
- Ensured all work compliance to engineering specifications, drawings and ISO standards.
- Worked with internal departments to resolve in-house and supplier quality problems.
- Ensured all process validations and ongoing product reliability testing was done to written standards.
- Performed analysis of customer complaints; initiated and followed-up on CAR.
- Developed and presented to management monthly reports identifying quality concerns, trends, and costs.
- Conducted internal audits; prepared and issued summarized reports.
- Assured quality considerations were adequately covered in the design, testing, and release of materials, components, and products.
Manufacturing Engineer , Confidential,Coxsackie, NY7/07 – 6/08
- Planned, directed and coordinated sheetmetal manufacturing processes on coating /chemical process line.
- Managed project for tear down and reconstruction of new coating /chemical process line.
- Wrote machine specifications for the procurement of new machinery and equipment
- Designed, installed, documented and refined production systems to meet safety, quality, and triple cell throughput.
Continuous Improvement Manager,Confidential, 11/05 – 7/07
- Managed and facilitated the entire plant’s Lean transformation initiative and strategy.
- Facilitated the use of such lean tools as Kaizen, Kanban, 5S, load leveling, set-up reduction, Problem-Solving, etc. in support of the Lean enterprise initiative.
- Provided leadership / mentoring / training to all levels of the company on the use and practice of Lean enterprise methodology and tools creating a culture of continuous improvement.
- Measured the effectiveness of continuous improvement efforts to report the results on a monthly basis across the plant.
Quality Engineer,Confidential, East Greenbush, NY11/02 – 11/05
- Worked on several high speed weaving and needling projects with global interaction.
- Worked with R&D to develop new machines and new non woven product and processes.
- Measured weaving process capability Ppk and identified areas for improvement..
- Identified processes not operating at the desired capability levels and led efforts to improve the process capability from a .67Cpk to a 3.47 Cpk.
Process Engineer,Confidential, 9/99 – 11/02
- Applied continuous improvement techniques for weaving bonding and needling process and equipment and turned several R&D projects into full blown production products.
- Increased R&D bonding production more than 800% percent from 5 to 40 fabrics a week.
- Explored, developed and specified new process technology equipment.
- Made quality decisions / provide technical support and training for managers, designers and technicians.
Manufacturing Coordinator,Confidential, 1/98 – 9/99
- Implemented and utilized a plant wide yield program, resulting in annual savings of $130K.
- Formulated a weekly production report encompassing all areas of plant manufacturing for both East Greenbush and St Stephen facilities.
- Developed a data acquisition system to track machine utilization, pieces produced, and downtime by operator.
- Developed data acquisition programs to gather and store all quality data from cardline.
- Worked between technicians and management to continually improve the manufacturing process.
Production Control Coordinator ,Confidential, 1/95 – 12/97
- Scheduled all weaving and carding equipment for the east greenbush facility.
- Ordered all yarns and fibers for production and setup Kanban system for fibers.
- Implementation of the new MRP-2 computer system into east greenbush facility.
- Maintained plant finite capacity planning system (FACT).
- Updated all ISO documentation for Production Control to new MRP system.
MRP Implementation Coordinator,Confidential, 7/93 – 12/94
- Worked with a team of 25 to implement an MRP-2 computer system now used in 36 plants worldwide.
- Developed and maintained a coding document to address all system codes for MRP implementation.
- Conducted group training of plant and office end users of the MRP-2 system.
- Setup all stockroom items / machine parts and product inventory under the new MRP-2 system.
Integrated Data Manufacturing System Specialist,Confidential, 4/92 – 7/93
- Participated on a team of four to develop/ implement several data acquisition software applications.
- Prepared on-line documentation for all data acquisition systems developed.
- Trained Manufacturing Technicians on DOS, Windows and other in house developed software applications.
- Purchased, installed, and maintained all manufacturing computer hardware.
Weaving Technician,Confidential, 9/90 – 4/92
- Functioned as warp-out coordinator for all weave looms at the East Greenbush facility.
- Performed changeovers and setup of various products on all weave looms.
- Operated looms and maintained quality of product.
Education:
- M.B.A., Business Management April 1999
B.S., Business / Public Management May 1989
- A.A.S., Business Administration May 1986
Software
Access, Excel, Powerpoint, Word, ERP, MRP, Minitab, SPSS, Lotus Notes
