We provide IT Staff Augmentation Services!

Distribution Designer Resume Profile

4.00/5 (Submit Your Rating)

Florence, SC

OBJECTIVE:

To effectively utilize my previous Design, Energy Reduction and Information Technology experience to make a positive contribution to a successful organization.

PROFESSIONAL EXPERIENCE

Confidential

Distribution Designer

  • Lead Geographic Information Systems Technician for Duke Energy's Southern Region. Learned and excelled at role in less than three months, completing exceptional amounts of work, with intricate quality. 10/2013 Present
  • Update and maintain Duke Energy's mapping system using programs such as AutoCAD, Intergraph G-Technology and Microstation. This helps the company plan for smaller projects when facility installations are requested by customers. 10/2013 Present
  • Update and maintain Duke Energy's One-Line Diagrams of major equipment using AutoCAD. This results in the entire company having access to accurate information when planning for new projects and system upgrades. 10/2013

Confidential

Engineering Technician

  • Maintained and updated Fort Bragg Army Base Geographical Information Mapping System using programs such as, but not limited to, AGi32 Lighting Analysts software, AutoCAD, ESRI ArcCatalog ArcMap, Microsoft Access SQL, and Bentley Microstation. This directly affected the company's contract with the US Army, as all data had to be presented bi-annually, and to the specifications of the Fort Bragg Department of Public Works GIS Department. 08/2008 10/2013
  • Upgraded and implemented company mapping software annually using ESRI, Microsoft SQL and Trimble Utility Center. This resulted in the company maintaining an up-to-date mapping system while also saving money by not having professional contractors to complete the upgrades, as would be the normal practice of a company. 08/2008 10/2013
  • Co-lead in replacing obsolete company computers and servers. This directly resulted in providing co-workers and management with faster and more efficient ways to complete their work. 03/2009
  • Inventoried all working and out of service generator units on Fort Bragg Army Base. This resulted in the company obtaining annual funds for maintaining, replacing and upgrading new and used generator units. 06/2009
  • Created Specification Installation and Parts Manual, which included, but not limited to, parts for overhead and underground transformer enclosures, Switchgear enclosures, Single Three Phase Junction Cabinets, PVC and Flexible Conduits. After the inception of this manual, these drawings were submitted with every project to instruct construction teams of proper height, width, depth, and installation of all parts. 06/2009
  • Created Engineering Design Package Template for all Engineering designs submitted to US Army Corps of Engineers, which resulted in the company acquiring 10 of the annual budget specifically for engineering designs. 02/2010
  • Elected to be lead and subject matter expert in special project which replaced obsolete lighting fixture inventory with energy efficient lighting fixtures. Met with vendors, hosted and gave presentations to the CEO and Management to show cost savings and evaluate the product best suited for the company. This resulted in the reducing the warehouse lighting inventory by over 50 , while also upgrading the fixture efficacy to 65 or higher. 10/2012
  • Elected as co-lead in special project to reduce company As-Built Job Inventory in a four-month time period. This resulted in saving the company over 50,000, by not hiring contractors to come in and complete the work. 02/2013
  • Elected as co-lead in inventory of all sports lighting fields on the Fort Bragg Army Installation. This resulted in the company's award of annual funds to either maintain or upgrade these sports lighting fields. 03/2013

We'd love your feedback!