Summary of Qualifications
Over 17 years of experience in construction management including document control, generating and updating project schedules, preparing progress reports, processing RFI's, submittals and CO's and Office Management project close-out and coordination with A/E and DSA. Overseeing project budget, and preparing project weekly and monthly progress reports.
Project Experience
Confidential
MTA Metro Blue Line Traction Power Substation Replacement Project/Wayside Traction Power Engineering 85M
- Provide project document control by keeping documents and electrical records of correspondence, on-going site construction, emails, change orders, payment applications and photos.
- Prepare and oversee budget and project progress reporting for MTA FTA. Monthly submission of ARRA budget reporting to FTA and project progress reporting to PMOC.
- Oversight of installation testing of new 750 MCM copper feeder cable positive and negative
- Onsite supervision of site construction by three sub-contractors to Siemens. Clean up of basement and epoxy painting, installation of sump pump and electrical cable ways, and additional as needed conduits after substation removal.
- Oversight of Overhead catenary System OCS by-passing and transfer trip and DC breaker transfer trip wiring and testing primary and secondary
- Oversight of electrical feeds of Communications Signals building
- Oversight of demolition and removal of substation on site based on presented and approved demolition plan.
- Onsite inspection and oversight of repairs of existing foundation by contractors
- Oversight of installation of high voltage conduits 12 KV, 16.5 KV and 34.5 KV services
- Oversight/inspection of new substation manufacturing at Crown Technical Systems in Fontana CA. Oversight and observation of TPSS water tight testing and preparation of shipping and delivery
- Coordination of DWP/SCE
- Track Allocation Coordination with MTA Rail Operations Center/ weekly meeting attendance and obtaining necessary work permits
- Oversight of substation energization to normal OCS and transfer trip testing
- Preparing and reporting monthly status to the Project Management Oversight Committee of current project progress and budget
- Attend weekly project schedule meeting with Siemens Project Manager to plan on-going subcontractor work and MTA work requirements and forecast track allocations needed
- Familiar with FIS and MIS, Metro Financial Information System to create/track project work orders
- Assist in generating project change orders and backup submitted by Siemens to MTA for approval.
- Assist in providing project site sketches for CADD drawings to Project Engineer for maintain up to date project site records.
- MTA- Provided technical support and oversight of the following MTA projects:
Metro Blue Line/ Green Line and Gold Line Cathodic Protection/Stray Current Survey Project, Metro Red Line Corrosion Protection Project, Metro Blue Line Overhead Catenary System Rehabilitation Project, Metro Foothill Extension Project, Metro Expo II Extension Project, Metro Green Line Emergency Transfer Trip System Project.
Confidential
As Office Engineer provide office management reporting directly to Senior PM. Daily processing and logging of RFI's, submittals, contractor and specialty invoicing. Assist in updating meeting minutes and monthly reports. All project document controls utilizing Expedition. Daily support and coordination with project inspectors and specialty inspectors
Relevant Project Experience
- MTA Blue Line Substation Replacement Project, Los Angeles, CA - 87 M
- Los Angeles Unified School District, BB Bond Program, Los Angeles, CA - 2.4B
- UCLA Westwood Replacement Hospital, Los Angeles, CA, 875M
- MTA Metro Blue Line Traction Power Substation Replacement Project, Los Angeles, CA - 100 M
- LAUSD Valley New High School No.1, Northridge, CA - 24.6M
- Metro State Hospital Satellite Kitchens, Norwalk, CA - 19M
- WSHUHSD Hart High School Modernization, Valencia, CA - 18.5M
- WSHUHSD Rancho Pico Jr. High School - Gymnasium, Stevenson Ranch, CA - 6.5M
- WSHUHSD Valencia High School Air Force ROTC Facilities, Santa Clarita, CA - 2.9M
- LAWA Los Angeles World Airport Utilities Survey Documentation LUSAD
- Joseph Jensen Filtration Plant, Granada Hills, CA, 102M
- Kawasho vs. Mitsui Claim, Los Angeles, CA, 134M
Computer Experience
Microsoft Office, Excel, Expedition, Primavera, SureTrack, Prolog, SharePoint, LaserFisch