Apo Manager Resume
New Jersy, NJ
EXPERIENCE SUMMARY:
More than 10 years of experience in the supply Chain. Worked as a Sr. Consultant in Supply Chain Management, Application Implementation and Organizational Change Management in a business process improvement capacity. Worked in more than 8 full life cycle implementations of APO Industries: TME, CPG, Biotech, Pharmaceutical, AFS, Automotive, High Tech, and manufacturing.
EDUCATION:
- MS Computer Science (Supply Chain Management)
- BS Manufacturing Engineering (Operations Research)
TRAINING:
- Trained In FI/CO, SD, MM, and PP SAP 4.6C By Supply Chain consulting
- Trained in APO DP and SNP 5.0 version
- Trained in APO 3.0a 4.1 version
- Introductory training in 4.7 enterprise edition
EXPERIENCE:
Project Name: HMH APO New Design Enhancement project
Confidential,Duration (06/2009) - Tilldate
Role: APO Manager
Systems: SCM 2007, Business Objects
- Manage the Planning project for DP
- Manage 7 sub projects under a DP Future state project
- Develop the Upgrade project plan and assign tasks to consultants
- Review the project milestones and set targets for the respective teams
- Create best in class forecast accuracy and Waterfall effect report using DP,BW, Business Objects and Crystal reports
- Develop the Future state Design using APO DP for 4 divisions and manage expectation of the client
- Resolve conflicts between the team by communicating meetings and brainstorming exercises
- Create Risk mitigation plans for upgrade
- Fine tune the resource plan and resource utilization and present status to management
- Chair the steering committee meeting
1) Project Name: Spares and Service parts planning
Confidential,
Role APO Project Lead
Duration (09/2008) - (03/2009)
Systems: SCM 2007, SNC
- Manage the Planning project for DP and SNP
- Prototype new functionalities in DP ,SNP, SNC and tollgate to the Business users
- Prototype the Planning using Duet for Demand Planning
- Test the scenarios for Planning sheets
- Create a New Planning sheet corresponding to Demand Planning key figures
- Edit the Planning sheet refine data with complex macros and load the results back to Demand Planning
- Work with Planning sheets selections for Characteristics
- Design the Install base forecasting process for Leading indicator forecasting
- Training the Global Planners in APO functionality using uPerform
- Determine the parts forecast for failure rates of Warranty parts
- Configure SNC for customer collaboration and vendor collaboration.
- Design the mechanism to input service levels in Safety stock planning
- Facilitate Best industry practices and critical design changes in Global DP Design
- Study the Custom safety Stock calculation logic and prototype the APO Standard Safety stock algorithm and demo to business
- Design the netting logic in SNP for CTM run
- Successfully manage the go live of the APO project.
- Design reports for KPI and metrics using Corporate Business Objects.
Project Name: APO Workflow
Confidential,
Role APO Planning Subject Matter Expert (Asia, North America and Europe)
Duration (03/2008) - (09/2008)
Systems: SCM 5.0
- Scoping the APO DP and SNP Enhancement project for Applecare
- Prototype new functionalities in DP and SNP and tollgate to the Business users
- Create and prioritize requirements lists in SCM 5.0
- Map the existing Global forecasting process and identify GAPS
- Facilitate Best industry practices and critical design changes in Global DP Design
- Study the Custom safety Stock calculation logic and prototype the APO Standard Safety stock algorithm and demo to business
- Understand the CTM Netting Logic and create training documents for Global SNP Planners to understand the calculations
Project Name: Vanguard Project
Confidential,
Role Demand and Supply Team Lead (Canada, North America and Europe)
Duration (05/2007) - (02/2008)
Team Size Project: 100+ Module: 10
Systems: SCM 4.1 SCM 5.0
- Lead the process mapping workshops and requirements gathering sessions for SNP Capacity Planning
- Design processes for Long and Short term Planning using APO, DP, SNP
- Create the design for new Demand Planning area and merge the old planning area data into new ones
- Facilitate the Workshops for transition of Characteristics to Navigational Attributes.
- Redesign macros and BW data flow and technical design.
- Use the ASAP methodology and Solution manager for Implementation.
- Participated in Integration test cycle 1, 2 and 3 and issues resolutions in APO and R/3
- Create Complex Advanced Macros for Street Date change automation.
- Create macros for Model spreads based on the automatic assignment of models based on Forecast volume
- Implement the R/3 LTP run for capacity planning and create hierarchies for reporting
- Build relevant master data for R/3 LTP simulation MRP run.
- Advise and train Client team in creation of process chain for APO.
- Work on processes to create and standardize the master data relevant for Product groups, Plant, BOM, Classification, Routing and transfer to APO via CIF.
- Worked on standardization of APO master data, Product, Resource, PDS
- Work on SNP Heuristics for Planned order generation and requirements calculation
- Infinite Capacity Planning with SNP Heuristics strategy
- Re fine design and processes for Canada APO Conversion by creating BW design specs to automate the conversion activities in contrast to manual processes
- Create batch jobs and process chains
- Get well versed with the WHV new SAP processes for transports and change requests creation
- Validate Transports and test configuration
- Create design for SNP Capacity Planning reports, FAT and Tollgate to users
Project Name: US Demand Planning Phase 2 project
Confidential,Role: APO Lead Onsite
Duration (11/2006) - (05/2007)
Team Size Project: 10+ Module: 10
Systems; SCM 4.0, SCM 5.0
- Lead the US Demand Planning S&OP enhancements project
- Create project plan and prioritize the key enhancements for Sales and Operations Planning
- Configure the Rules based GATP to work with SD for Product Substitution
- Configure the Product Allocation in GATP to work with DP
- Demo and present to the client of the new design in GATP
- Reengineer the statistical forecasting models and process
- Create the design for integration of Siebel demand in APO DP and create custom macros
- Build
- Introduce the Life Cycle planning and management process
- Simulate the What If simulations from DP to SNP for S&OP
- Worked on Deployment and TLB
- Worked on the SNP Planners for Demand and Supply meetings as the Chair person
- Re Design the Online reporting programs for Product Line reporting
- Work with Client on APO requirements and resource Plan
- Design processes for global forecasts aggregation and Sales and Operations planning and design the BW staging architecture
- Work on standardizing best business practices for S&OP processes
Project Name: Demand & Supply Planning
Confidential,
Role APO Sr. Consultant
Duration (04/2006) - (11/2006)
Team Size Project: 100+ Module: 30
Systems; SCM 5.0
Collaborative Project (PG&E, ACCENTURE and SAP America)
- Create prototype for APO DP and SNP
- Characteristics based forecasting for both Units and $’s
- Design Planning Books and Data views
- Create BW design for data flow for Consumption history (PM Orders)
- Extract test data from R/3, load to infocubes, and load to Planning area
- Configure Planning books and Data views
- Work on Processes for Statistical Forecasting at SKU level and Collaboration at a Higher level in $’s
- Defining the complex Aggregating and Disaggregating of the key figures by means of Proportional factors
- Create Advanced macros and Alerts
- Configure the CTM profile to cater to the Replenishment Planning
- Simulate the Normal and Advanced Safety stock methods in SNP
- Facilitate workshops for requirements gathering
- Full configuration of the prototype to seamlessly integrate with the existing R/3 design
- Refine requirements and work as Subject Matter Expert for the Prototype design
- Guide Accenture and SAP consultants in Prototype designs and analysis
- Guide PG&E Planners to decide the Operations calendar, Supply Chain Process To BE models , Levels of Forecasting and Collaboration with Finance and Materials Planning
- Toll gate and Demo to the steering committee by means of a Conference room pilot (CRP)
- Proficient with the ACCENTURE Delivery model and Documentation standards.