Planner/scheduler Resume
5.00/5 (Submit Your Rating)
Deer Park, TX
SUMMARY:
- I've worked in Project Controls and have developed skills in the areas of estimating, SAP, Primavera P6 scheduling, cost/progress reporting, and training new employees.
- Progress reporting experience includes both engineering and construction progress by preparing and utilizing drawing status reports, field audits, progress reports, quantities of materials installed and with a working knowledge of rules of credit.
- Experience with SAP and scheduling in Primavera resource loading/leveling and activity logic based on written scope of work, field walk downs and engineering construction design drawings.
- Managed scheduling, estimating, cost engineering, budget preparation, trending, change management control, forecasting, cash flows, and effective communication thru narrative reporting, graphical media (P6 Scheduling), SAP planning and material procurement.
TECHNICAL SKILLS:
- Computer MS Office
- SAP
- Primavera P6/P3
- SAP
- Management
- Oracle
- CMIS
WORK EXPERIENCE:
Confidential, Deer Park, TX
Planner/Scheduler
Responsibilities:
- DOW (Deer Park, Bayport, La Porte TX) - project estimator (all craft), I&E Planner (Oracle/SAP), Scheduling (Primavera P6)
Confidential, Alvin, TX
Scheduler
Responsibilities:
- INEOS Chocolate Bayou Works - SAP, Primavera P3/P6, scheduled routine maintenance, TAR, capital projects and sub-contractors. Planned unit PM, material procurement, specialty contractors (scaffolding, paint, insulation, rental equipment)
Project Controls Manager
Confidential, Old Ocean, TX
Responsibilities:
- Established a department that provided project estimating, scheduling, and cost reporting per project. Provided and managed estimates, Primavera schedules, progress, cost, SAP, and reporting to our client and site management for all capital projects, maintenance, and turnarounds.
- Responsibilities include working with Supervision, Engineering, Project Engineering Group, Sub-Contractors, (TA) Turnaround Scheduling and Construction Group.
- Managed small capital project estimators, Civil, IW, Rig/Op, Piping and I&E planners, cost reporting, SAP planning, and Primavera Schedulers, MS Office reports.
Project Controls Manager
Confidential, Texas City, TX
Responsibilities:
- Established a department that provided project estimating, scheduling, and cost reporting per project.
- Provided and managed estimates, Primavera schedules, progress, cost, SAP, and reporting to our client and site management for all capital projects, maintenance, and turnarounds.
- Responsibilities include working with Supervision, Engineering, Project Engineering Group, Sub-Contractors and (TA) Turnaround Scheduling and Construction Group.
- Managed small capital project estimators, Civil, IW, Rig/Op, Piping and I&E planners, cost reporting, SAP planning, and Primavera Schedulers, MS Office reports.
Confidential, Clute, TX
Scheduler
Responsibilities:
- Alliance project engineering scheduler, engineering and design capital construction projects and revamps including small capital projects for both contracts (Longview Eastman Co & INEOS).
- Responsibilities included overseeing scheduling and working with the onsite schedulers.
- Roles and responsibilities, to provide the project management team with engineering schedules and updated reports on project engineering and design drawings.
Confidential, Houston, TX
Cost Engineer
Responsibilities:
- Assigned to Lyondell as the S&B Representative for cost estimating/engineer for the 2007 FCCU unit shutdown included Maintenance and Capital Projects overseeing other contractor cost, equipment cost, scheduled data in providing the project management team with reports, trends, changes, cash flows and other special reports such as PF curves.
Confidential, Alvin, TX
Estimator/Scheduler
Responsibilities:
- Project Controls lead for Capital Projects. I was the lead estimator and cost engineer as well as back up scheduler.
- I was responsible for Capital Construction controls including progress monitoring, cost reporting, change management and monitoring SAP reporting.
- Reporting progress and cost to construction management and client weekly.
Confidential, Baytown, TX
Scheduler
Responsibilities:
- I was the turnaround scheduler for the CPC Poly outages.
- I provided schedule reporting for all sub-contractors involved in these outages.
- Also, had to provide the frontend cost estimate based on sub-contractor work hours and composite hourly rate provided per contractor.
Confidential, Sweeny, TX
Estimator/Scheduler
- Provided estimates and construction cost reporting for all disciplines, off-sites (Clemens & Freeport terminals), Other projects such as SCR, Re-boiler Replacements, HRVOC's, VOC's, Fugitive Emissions Monitoring and Installation of MCC's, analyzers, and turnaround piping tie-ins. SAP and Zachry proprietary systems to report cost weekly and reported to management a monthly scorecard.
- Trained staff and employees (Primavera, SAP, Cost, MS Office, CMIS).
Confidential, Alvin, TX
Project Controls Rep
Responsibilities:
- SAP weekly, bi-weekly, monthly, three month, yearly, two year, three year, five year and ten year electrical PM's.
- Assignment included combining Lyondell, Equistar and Manufacturer Standards into one process for a standard PM report for operations to track history of all electrical equipment at their Polymer Units consisted of two Polymer lines, the unit location was on TX FM 2004 inside the AMECO-BP Plant.
Confidential, Borger, TX
Planner/Scheduler
Responsibilities:
- I was moved into Project Controls to establish and implement a Work Package system for Capital Projects. Then was trained in cost and cost reporting at the same time as working with the Work Packages. Then while building Work Packages and Cost Reporting was trained to Estimate for all crafts starting on small capital projects.
- While building Work Packages, Cost, Estimating, trained in P3 3.1v. Then I started to track projects from start to finish starting with JP8 (Jet Fuel Filters Project) then on to bigger project such as the Refinery Debottlenecking Project as well as other small projects up to at least eight projects maintained weekly.
- I was trained in SAP the main tracking systems for the client. Then was offered to move to the Gulf Coast Region to provide training to others in Project Controls in need of experienced staff members that could and would train others in proprietary systems. Past work history available upon request
