We provide IT Staff Augmentation Services!

Project Manager Resume

3.00/5 (Submit Your Rating)

Summary
Professional experience in construction supervision and design of civil engineering works in urban and rural areas. Experience includes the design, cost estimation and construction supervision of water supply and sewer networks, water treatment plants, and utility services for new and existing houses, state and local roadways and the development of new communities.

Significant Career Milestones

  • Upleta India: Team leader of 40 engineers and staff for construction of 180 km four lane freeway project.
  • Amman Jordan: Independent duty for USCOE to observe subcontractor activities for the construction of 75 temporary offices.
  • Baghdad Iraq: Design Manager for 6 major bridges, two railway repair facilities and 150 railway stations.
  • Madison Wisconsin: Design Manager for East Madison Beltline project including 3 bridges and 30 lane miles of freeway reconstruction.
  • Development of software to model pressure water systems, gravity sanitary sewers and pressure storm sewer systems.
  • Altoona Wisconsin: Design and construction of $1.0M sewer reconstruction project.
  • Land Development Manager for Centex Homes from 1984 to 1990.

Career Summary:

2008 to 2009, Confidential
Camp Lejeune, North Carolina
Project Manager
Imbedded team supporting construction projects. Responsibilities include staff supervision constructability reviews, submittal reviews, development of cost estimates and review of proposals.

2006 to 2008, Confidential
Lake Havasu City, Arizona
Design Manager
Responsibilities included proposal development, staff supervision, design development, specifications and submittals for residential and commercial subdivisions.

  • $10M Commercial Development
  • $15M Residential Subdivision

2004 to 2006, Confidential
Muscatine, Iowa, USA
Design/Construction Project Manager
Independent assignments in India, Iraq, Jordan and Kuwait. Responsibilities included design review, project start up, staff supervision and construction management.

  • $100M Rail Construction Iraq
  • $200M Freeway Project India
  • $10M Building Project Jordan / Kuwait

2000 to 2004, Confidential
Altoona, Wisconsin
Project Manager
Design and construction management of civil, water, sewer and infrastructure works for municipal and private clients.

  • City Engineer Altoona Wisconsin
  • 36" Pressure Storm sewer system
  • $5M DOT Reconstruction of USH 12

1998 to 1999, Confidential
Principle Engineer
Acting as an independent consultant Mr. Johnson provided engineering services to local municipalities.

1995 to 1998, Confidential
Milwaukee, Wisconsin
Staff Engineer/ Project Manager
Design and design supervision for water treatment systems, race tracks, sanitary systems, water distribution systems.

1990 to 1995, Confidential
Kenosha Wisconsin
Staff Engineer
Design of state and local highway projects including design study reports, preliminary plans and final PS&E.

1984 to 1990, Confidential
Chicago, Illinois
Land Development Manager
Directed design and development of 3,500 residential units, including single family and multifamily communities. Duties included over site of utility design, zoning and right of way approvals; bidding and contract awards; supervision of construction; and management of project budgets, costs, and schedules.

Education:

  • B.S., Civil Engineering.

Membership in Professional Societies:
Registered Professional Engineer, Wisconsin; 1991, Arizona; 2006, Nevada, 2007; North Carolina 2009, California is pending seismic test.

Software Experience: Very proficient in AutoCAD with LDD. Proficient to in Microstation with Geopac but prefer Eagle Point. Very proficient with MSOffice including Power Point and Excel. Developed spread sheets to model pressure water systems, gravity sewer systems to include pressure force mains, and site grading. Developed Visual Basic programs to design structures. Very proficient in MS Project, Primavera (also SureTrac) and have been trained for Mcases.

Countries of Work Professional Experience
USA, Iraq, Jamaica, India, Kuwait, Jordan, Japan

PROJECT LISTING

Confidential: Included complete plans and specifications for 6 major bridges in Iraq. Responsibilities included staff supervision, plan review, subcontractor supervision, plan review and submittal for approval.

Confidential: Included construction management for 150 miles of four lane freeway with 12 major bridges, 20 minor bridges and 10 interchanges. Responsibilities included office start up, hiring 40 engineers, supervision of construction activities, approval of payments, quality control, material testing and liaison with Indian government.

Confidential: Included 30 lane miles of roadway reconstruction, 2 interchanges, traffic signalization and construction phasing. Responsibilities included preliminary design, final design, design study report, public hearings, PS&E documents and liaison with WisDot.

100 Acre Development: Included preliminary design of water distribution, modeling, sewer collection, location of lift station, location of water storage for 250 lot subdivision.

360 Acre Mountainside Development: Included design of water distribution, sewage collection system and lift station. This included final plans, permitting, specifications, bid documents and computer modeling.

Confidential: Preliminary study for Upleta, Gujarat, India water and sewer systems. Included preliminary alignments, modeling, locations for treatment plants, wells and storage facilities.

Confidential: Included start up and operations for City of Altoona.

Confidential: Design and construction management included start up and operations.

Confidential: Included design and construction management for 5,000 feet of deep sanitary sewer and 10" water main. This included final plans, permitting, specifications, bid documents, payment approval and computer modeling.

Confidential: As city engineer was responsible for a total of $10M in regular reconstruction and repairs of existing 10 miles of water and sewer systems. This included design of 15 station SCADA system, modeling of collection and distribution systems.

USH 12 Fall Creek: Reconstruction of USH 12 at Fall Creek. Responsibilities included preliminary and final plans for 2,600 feet of urban highway. This included design study report, traffic control, PS&E documents, computer modeling and construction phasing. This project also included the replacement of 2,600 feet of water and sewer mains.

Confidential, Wisconsin: As Director of Public Works managed water and sewer repairs and observation of new subdivisions estimated at $1.0M total cost.

Confidential: Included design and construction of 25,000 feet of replacement sanitary sewer system and new lift station. This included final plans, permitting, specifications, bid documents and computer modeling.

Water Treatment Plant: Design of chemical treatment systems for City of Milwaukee water treatment plant.

Pleasant Prairie Subdivision: Design and construction of 20 lot residential subdivision including water distribution, sewage collection and lift station.

50th Street: Included supervision as DOT representative for ½ mile of concrete street reconstruction. Responsibilities included change orders, payment approvals, quality control, material testing and final acceptance.

Centex Homes: As land development manager responsibilities included the over site of 35 miles of water and sewer construction over a period of 6 years. This included planning, design review, bidding, contracting, construction management, payment approval and acceptance.

40 Acres Commercial Development: Included widening of 1 mile of AZ 95 with additional thru lanes, turn lanes and traffic signalization. Responsibilities included plan development, bid documents, final plans, submittal to ADOT for review and approvals, traffic analysis, bidding and construction observation.

300 Acre Residential Development: Included design of water pumping system, water distribution, construction of water distribution, pumping and storage tank for 400 lot subdivision. This included final plans, permitting, specifications, bid documents, payment approval and computer modeling.

200 Acre Residential Development: Included preliminary design of water pumping system, modeling, water distribution, sanitary sewer collection system and sewage lift station for 100 lot mountainside subdivision.

500 Acre Commercial / Residential development: Included water pumping station, distribution system and start up for 20 commercial lots and 400 acres of desert development. This included final plans, permitting, specifications, bid documents, payment approval and computer modeling.

40 Acre Commercial development: Included water distribution, sewer collection and 1 mile of offsite connection mains. This included final plans, permitting, specifications, bid documents, payment approval and computer modeling.

We'd love your feedback!