We provide IT Staff Augmentation Services!

Project Manager Resume

3.00/5 (Submit Your Rating)

OBJECTIVE
A challenging position which effectively utilizes my prior experience, training and abilities; and offers opportunities for professional growth and advancement. Willing to travel up to 90 percent.

EDUCATION

BA, Liberal Arts and Sciences.
AH-64 Apache AQC.
Army Aviation Officer Advanced Course.
Honor Graduate, Master Fitness Training course.
Army Flight Training, AH-1 Cobra Track.

MILITARY
United States Army Reserves
Officer and Aviator
November 1983 - February 2004

STRENGTHS
Twenty years experience as a manager, project manager and U.S. Army officer / aviator. Achieved outstanding results during 14 years of solid project management work including: Enterprise Application implementations, technical training development/delivery, and business process creation and maintenance.

PROFFESSIONAL EXPERIENCE

Self-Employed 2004-present
Project Manager / Consultant

  • Recently deployed a hardware and software solution for Confidential. Responsible for training, monitoring, reporting and support for all aspects of change management.
  • Senior Equipment Engineer for Confidential. for physical vapor deposition system refurbishments.
  • Conducted a training development and web conversion project for Whole Foods Market.
  • Transitioned workmanship standards curricula to a Japanese training center (AMJ), including kit builds, training development, inventory management, and train-the-trainer sessions.
  • Created and delivered multiple instructor guides, in support of Confidential, for business system implementations of eMatrix and Inventor.
  • On-site technical support for Archer Grey during business system implementations supporting the F-22 Raptor design project.
  • Created system-level training for multiple semiconductor tools, including physical vapor deposition, abatement systems, and soft etch.
  • Developed troubleshooting curricula, consisting of: Mass Flow Controllers, Fittings, Fasteners, Electrical Connectors, Advanced Electronics, Helium Leak Detection, and Oscilloscope and Digital Multi-Meter usage.
  • Global technical trainer for multiple Fortune 100 companies.
  • Performed personnel assessments, pre and post training, for performance improvement metrics and effectiveness.

Applied Materials 1994-2003
Senior Engineering Project Manager

  • Project Lead for a company-wide initiative implementing integrated eMatrix, Inventor and Oracle business solutions/applications. This initiative resulted in a 48% reduction in time-to-market of new products, and a 29% reduction in cost of goods sold.
  • Trained the Engineering base and Super Users on the use of all new tools and applications associated with the initiative, to ensure success during and after the business systems rollout.
  • Wrote, released, and maintained corporate core business processes supporting: Engineering Change Orders, Supplier Notification Sheets, Supplier Problem Sheets, Engineering Specification Waivers, and 3D Solid Model Management, to ensure standard practices and methodologies across all divisions.
  • Led multiple small and large teams to close issues affecting interchangeability, cycle time, quality, and ISO compliance.

Engineering Services Manager

  • Managed all personnel and administrative activities for Document and Data Control, Engineering Change Management, Engineering Data Services and Metrology.
  • Created the Engineering Change Analyst job family, grade structures, career paths, and job requirements.
  • Led a cycle time reduction initiative that decreased average ECO cycle time from 48 days to 15 days.
  • Process Engineering Authority for Document and Data Control for ISO implementation and sustaining operations. Received the DNV Quality award for excellence.
  • Managed and reported corporate KPI data for all core business units.

Engineering Change Manager/Project Manager

  • Reviewed and routed all engineering changes affecting the Metal Division, as well as interdivisional changes affecting multiple product business groups in support of new product releases and continuous improvements.
  • Maintained Divisional KPI reports for upper management.
  • Lead technical writer for the ECO Survival Guide.

Supervisor, Pre-Production Line / Final Test

  • Managed and developed 20 Final Test Technicians responsible for final product testing and quality assurance.
  • Created status reporting for PPL and Final Test for system tracking and resource management to maintain a 98% on-time-delivery record.
  • Decrease cycle time from 17 days to 11 days in Final Test.

Physical Deposition Chamber assembly and testing

  • Built high vacuum chambers and components to meet 1-0e-9 Torr requirements and tested all chamber functions.
  • Project managed product transitions from evaluation to production status.
  • Mentored workmanship standards to new-hire employees, as required.

We'd love your feedback!