We provide IT Staff Augmentation Services!

Senior Technical Project Manager Resume

4.00/5 (Submit Your Rating)

Chicago, IL

SUMMARY:

A results - oriented leader with an engineering background who works well under pressure, has strong communication skills, and enjoys a fast-paced environment. Strengths include project management, time management, strategic planning, telecom technology, and a proven ability to bridge gaps between technology systems resulting in measurable cost savings and profitability.

COMPUTER EXPERIENCE:

ACAD Drawing Experience: ACAD 12 / ACAD 13, Microsoft Project, Word, Excel, Access, Explorer

EMPLOYMENT HISTORY:

Confidential - Chicago, IL

Senior Technical Project Manager

Responsibilities:

  • Coordinates departmental or cross-functional teams, focused on delivering new or upgrading existing products
  • Manage the development and implementation process of a company's products and services.
  • Plan and manage company resources to execute development project or project components from design phase through implementation
  • Reporting and metrics from multiple order entry, workflow and inventory systems as well as support data marts / databases supporting internal and external customers
  • Organizes cross-functional activities, ensuring completion of the project i.e. product on schedule and within budget constraints.
  • Identify and communicate project scope and ensures program milestones and objectives are met
  • Project manager for complete nationwide network build out (legacy Wiltel identification of switches, costing, ordering and tracking)
  • Integration of networks by managing capacity and migrating Customer circuits to end state equipment (TDM/PRI to VoIP)
  • Monitor network to ensure that network performance meets expected service levels for customers
  • Utilized trending data to determine network growth and appropriate costing data to initiate network capacity augmentation, grooming and disconnection
  • Worked with Customer to develop a plan for new product promotional launch based on three and six month forecasting, identifying calling areas of interest, and tariff cost savings
  • Created maintenance and operating procedures for engineering and provisioning teams
  • Analyze and provide feedback on forecasts from customers

Confidential - Decatur, IL

Supervisor/ Engineering Change Control

Responsibilities:

  • Managed engineering change control (ECC) team with the focus on engineering bill of material changes, effective dates, and sourcing of products to enhance implementation of new product introduction
  • Member of the total productive maintenance team which helped prevent, predict and minimize machine failures
  • Interviewed, selected, and trained new personnel through a 40% turnover in the department
  • Member of resource strategy team to implement the transition of modular builds to outside suppliers in order to reduce cost
  • Developed and executed a transition plan to relocate the ECC group from Joliet, IL to Decatur, IL
  • Coordinated a project of rework through the ECC area for cell ISO 9001

Confidential - Bradley, IL

Project Engineer

Responsibilities:

  • Designed and installed an automatic depalletizing and conveying system to reduce head count by one person per shift on labor intensive line
  • Scheduled and tracked multiple project timelines to ensure deliverables remained on time and on budget.
  • Using AutoCad, created USDA approval drawings for the Automated & Dry Mix facility
  • Managed outside contractors on installations for projects and facility upgrades (i.e. heat exchangers, roofs, RxR spurs, tanks, dock levelers, boilers)
  • Designed automatic oil delivery system from outside tank farm to the inside tank farm
  • Increased safety of railcar bulk unloading through new catwalks and jib design
  • Instituted tracking system of cans for tracing defects of packaging materials through system so items could be recalled out of the warehouse

Confidential, - Lombard, IL

Packaging Engineer

Responsibilities:

  • Developed proposals for packaging and processing systems by costing, specifying, and detailing layouts of equipment.
  • Implemented the projects on schedule and within cost target of Confidential .
  • Liaison between corporate head quarters and bakery personnel for $ 4.5 million dollar packaging project
  • Specified and installed upgrades to Doy pouch maker to increase machine efficiency by 40 % by eliminating film jams, bad pouches, and feed problems
  • Optimized and installed a metal detecting reject system on product line, increasing operator safety and reducing bad rejects
  • Responsible for the relocation and layout of packaging lines to reduce head count of three people per shift with a savings of $ 150,000 annually
  • Member of a safety team responsible for developing a lock out tag out procedure of equipment for bakery personnel
  • Developed a bulk product delivery system to packaging lines to reduce down time
  • Coordinated Eddy current analysis on a chiller to determine the condition of tubes as a part of a preventive maintenance program for heat exchangers in the bakery

We'd love your feedback!