We provide IT Staff Augmentation Services!

Project Scheduler Resume

ColoradO

SUMMARY
analyze systems and processes and implement infrastructure improvements. A self-directed, disciplined, and confident leader and vibrant team player who delivers exceptional rather than expected results through strategic thinking, innovative problem-solving, and managing teams for performance excellence. Key competencies in project scheduling, designing and implementing systems and procedures with proven ability to achieve financial discipline and enhance the overall efficiency and effectiveness of the organizations he represents.


PROFESSIONAL VALUE OFFERED


  • Team & Project Leadership
  • Project Planning, Management & Evaluation
  • Primavera P6 and Ms Projects Skills
  • Reporting/Documentation
  • Contractor /Resource Management
  • Analytical / Critical Thinking Skills
  • Training & Development
  • Quality/Control Skills


PROFESSIONAL EXPERIENCE

PROJECT SCHEDULER
Confidential,Colorado 2012 –

  • Prepare project schedule on primavera P6 with WBS, activities and milestones
  • Run Primavera Project planner reports and analysis
  • Update schedules when required
  • Run Filters on the primavera Planner for reports required by management
  • Prepare Logic Diagrams, bar charts and histograms
  • Analyze and mitigate schedules for impacts
  • Prepare Critical Path Method (CPM) schedules as required
  • Perform cost to complete projections and earned value
  • Support the project team in the development of Project Change Notices.
  • Create project plans by identifying tasks to be performed, necessary requirements, deliverables and milestones.
  • Demonstrated skill in defining project scopes and details and devising and recommending alternative methods of standardized analysis as a basis for solving problems.
  • Manage data and information collection and research.
  • Analyze, compare and forecast current status against established baseline schedule
  • Monitor and evaluate results in alignment with project goals and objectives.
  • Interpret and apply Federal, state and local regulations
  • PROJECT COORDINATOR
    Confidential,United Kingdom 2010 – 2011

  • Participate in all phases of multiple construction projects including planning budgets and monitoring costs, developing action plans, forecasting project requirements, analyzing variances, determining system improvements, initiating corrective actions and completing audits.
  • Facilitate Project WBS, resource allocation and loading, create and maintain schedules and provide key project tracking data to Project Lead.
  • Manage a multi-disciplinary team of various specialists and contractors and ensure they comply with work specifications, safety standards and regulatory requirements.
  • Develop, Measure and report Project plans and status with Ms Projects, prepare project status report, monthly progress reports and customized client report.
  • Make effective presentations on behalf of the planning and scheduling team.
  • Review and approve monthly and final payments for contractors and vendors.
  • Prepare project quality plans with activity timelines and budget predictions and assist in the control and co-ordination of the company’s Quality Management System QMS ( inc. ISO 9001: 2000 )
  • Populate submittal logs with project information and complete daily report logs by the end of each work day.
  • Assemble permit applications, understand existing regulations and continue to review new and proposed regulations pertaining to clients.
  • Serve as primary point of contact for prospective and current clients.
  • Design all Standard Operating Procedures (SOPs) to standardize daily operations.
  • PROJECT CONTROLS ASSISTANT
    Confidential,Birmingham, UK 2008 – 2010

  • Involved in initiating project scope and preparing scoping report and assisted in identifying all changes or potential changes to the project scope.
  • Identified and collected performance data and participated in project reviews.
  • Analyzed and monitored Project risk, earned value and productivity and produced daily cost compilation.
  • Oversaw WMCCE retaining wall construction.
  • Consulted and partnered with team members regarding architect/engineer (A/E) and construction projects and contracts.
  • Compiled and recorded eligibility studies and operational data for review and further analysis.
  • Authored daily reports for review by project manager.
  • SITE ENGINEER
    Confidential,Nigeria 2004 – 2007

  • On site; supervised the contractors, tracked each phase of the project and carried out project reviews.
  • Inspected equipment on site and operational machines periodically for conformance with operating standards and ensured QA/QC commitments for all the assigned equipment and tools.
  • Calibrated and supervised maintenance of equipment at the base and offshore.
  • Participated actively in equipment mobilization, equipment qualification testing (FAT, SIT and EFAT) and also mentoring technicians and junior field engineers
  • Provided technical parameters and Bill of materials (BOM) during equipment shipment to site and participated in generating Engineering Bill of Materials (EBOM) during product design and costing.
  • Maintained interface with clients and vendors regularly.
  • Carried out HAZOP analysis for all operations I was involved in and promoted the use of safety and HAZID methods during operations through completion of Job Risk Analysis (JRA)/Job Safety Assessment (JSA) forms.
  • EDUCATION

    MSc International Project Management

    • Dissertation: Value and Impact of Total Quality Management in the Management of Projects.

    B.Eng. Mechanical Engineering

    • Dissertation: Design and construction of a Cow Pea dehuller

    Hire Now