Prm Resume Profile
OBJECTIVE: | Seeking Program/Project opportunities for technical, operational, and mission critical programs with global, matrix and distributed teams |
STRENGTHS: |
|
Passionate and experienced in industry first, high risk Can isolate industry. | |
EXPERIENCE: | |
Aug. 2011 To Present | Confidential Program Manager Deployment Swift Server worldwide Deployment APAC/Asia Pacific , AMEA Europe and Americas Datacenter following strict project management methodologies Scope, Procurement/Approval, Datacenters, Quality Assurance QA , Scrum, Waterfall, Agile, etc. Confidential Program Manager Operations and Programs
Confidential Program Manager Cost-point to PeopleSoft Conversion
Confidential Program Manager Turnaround Management
Executive summary reporting to C-Level of Omnicom, Steiner Sports PMO. |
Apr. 2008 To Jul. 2011 | Confidential Project Manager Internet of Things/IOT
|
Jun. 2000 To Mar. 2008 | Confidential Senior Program/Project Manager SPM /PMO |
| |
Program Manager for Worldwide Product Enablement across Asia, European Union and Americas for streamlining budget and formulate accurate forecasting. Conference and Event Support | |
Managed Virtual Infrastructure Access from Training, Enablement Verification and Labs across Asia Pacific, European Union, and Americas. Argentina, India, France, Italy, Australia, USA | |
| |
PM on Global Delivery Research and Development GDRD directive. Confidential o Formed a team of 30 during pre-design phase. Project didn't Kickoff Issue - resource acquisition | |
PM for E-Commerce/Business Development eBOD
| |
Senior Project Manager Reporting to the Director of RetailSI
| |
Confidential | |
Sep. 1994 To | Confidential |
Apr. 2000 | Confidential |
Project Manager for establishing project wide Methodology
| |
Confidential | Confidential |
Project Manager establishing project wide Quality Assurance standards. Responsible for resource management Client/Server , Software development for automated testing and simulation of load and stress scenarios | |
Confidential | |
Integrated Transport Manager/Project Resource Management ITM/PRM Project Manager Software deployment, performance measurements/automation to client sites in US and Saudi Arabia | |
Confidential | |
Network Bill Recording Engineering and Quality Assurance QA Project Manager Responsible for end to end Quality Assurance, test tool development, test case development in the Call Detail Warehouse CDW Informix environment and Reliable Message Transport Protocol RMTP | |
Confidential | |
Trunk Operations, Administration and Maintenance Product Team | |
ATP International and ASOS Group: Project Manager / Lead Developer Designed and developed functionality to normalize date and time between CONNECTVU and the switches e.g.: AT T - 5ESS, 1AESS Northern Telecom - DMS 100 and DMS 200 | |
ATP Switch Coupler and Test Group: Designed and developed parser for the Echo Back process for autonomous 1A ESS messages. | |
Trunk and Core Development Group Project: ACCLAIM : Designed and developed a Link Sharing, TCP/IP socket based multiplexer. | |
Sep. 1991 | Confidential |
to | Senior Technical Staff/Technical Project Manager |
Sep. 1994 | C3I Command, Control and Communication and Integration: |
LOA Overlap | Responsible for development, integration and testing of the Message Handling Block for Department of Defense DOD Global Command and Control System GCCS . |
Conceived and developed automated test suite for interaction of Message Block with Communication Block and protocol verification | |
Member of the Technical Staff MTS , Project/Development Lead | |
Integrated Intelligence Systems Special Programs Division | |
Responsible for the integration of high-end peripherals, commercial-off-the-shelf COTS and government-off-the-shelf GOTS software applications | |
Designed and developed name parser algorithm for the X500 directory server | |
Developed prototypic programs for the Navy Enterprise Model using Oracle Database. | |
Co-developer of a DoDIIS-compliant prototypic operational intelligence system for the United States Marine Corps Intelligence Center. | |
Oct. 1985 | Confidential |
to | Senior Developer/Sr. Project Manager SPM |
Aug. 1992 | Network Management Systems Development: |
LOA Overlap | Bandwidth Management Software Group : Responsible for system installation, Sub-system Integration SSI , system network configuration TCP/IP X25 /testing for the Accunet Bandwidth Management System ABMS . |
Advanced Software Development Group : Designed and developed the Enhanced Map Editor for the Accumaster Integrator, AT T's first OSI NMP Network Management Protocol offering | |
Network Interface Software Group : Designed and developed gateway processes for mapping ASCII messages into UNMA/NMP AT T's Universal Network Management Architecture format. | |
Designed and developed gateway process for EMS Element Management System | |
Member of the Technical Staff MTS /Sr. Project Manager SPM | |
Advanced Decision Support System - Project Management. | |
Responsible for development of the product cycle scheduling/builds, project plan and maintenance of KORBX, a product based on the Karmarkar Linear Programming Algorithm. Responsible for front-end GUI development | |
Management Information Systems, | |
UNIX System Support Group. Senior Systems Programmer : Member of the UNIX system support group.
| |
May 1984 to Sep. 1985 | Confidential Office Automation. System Support Engineer : Developed and maintained menu driven tools for automated data transfer from the IBM mainframe to iDIS Intel's Database Information System |
INDUSTRY FIRST and/or NOTABLE PROJECTS |
|