SUMMARY OF QUALIFICATIONS
Results-driven, dedicated project manager with excellent technical, and analytical demonstrated by performance in automation, chemical, oil gas industries. Experience in cost/performance/schedule, change management, strategic planning, conflict management, customer relations, data analysis, financial management, concept development, logistics facility deployment, personnel management/recruitment and excellent team building skills. Advanced command of Microsoft Office and Microsoft Project programs.
PROFESSIONAL EXPERIENCE
- Project Engineer, Confidential -Lead engineer, developed teams and provided engineering support for the procurement and rehabilitation of major capital facility project for painting/quality processes.
- Engineer liaison between the customer and manufacturing.
- Single point of contact for the customer domestic and international .
- Provide risk analysis quantitative and qualitative with control plans and product FMEAs including causes, controls, consequences and scoring for new and existing designs. -Resourced facilities identifying, confirming, and responding to internal/external customers of product manufacturing and supply chain.
- Assists in or leads the project in technical studies, new product design, preparation of specifications, technical plans, and product testing. Assess progress in assigned projects and resolve issues resulting from contractor Request for Information RFIs or field problems and procedures resulting from differing site conditions.
- Provide technical support for drafting of contracts including documentation and testing requirements of new product line for customer and company, standard clauses and special provisions. Assist with negotiations or conducting complex negotiations with the customer.
- Analyze bids or proposals per contract requirements and responsiveness of vendor/contractor quotations. Recommend to upper management and sales the contract award.
- Review and approves design changes ECNs , specifications, and drawing releases. Support a 2M project portfolio with 7 projects simultaneously providing 4 to 7 technical resources for design and manufacturing. Experience with pantograph procurement, engineering and rehabilitation and/or experience with providing engineering designs and construction support for the procurement of 100 jobs per project.
- Develop requirements and measures effectiveness, schedule logistical services, and ensure logistical support is provided within the acquisition program objectives
- Lead customer audits on all company policies and procedures to the specifications of the contract.
- Monitor contractor's quality and performance to the specifications of the contract.
- Lead customer audits on quality, inspection and testing to approved contract documentation and drawings. Serve as a team leader for 15 members daily with various phases of the project process through fully mission operational capability. Analyze staff activity to determine appropriate course of action to meet mission requirements.
- Negotiate the cost of designs and completion schedules for design projects to include maintenance, repair and overhaul type of work
- Assures the design of the systems, their components and testing are technically adequate and complies with all specifications and changes from the customer during the course of design development.
- Manage design and manufacturing teams to do continuous improvement towards quality and assembly time of pantographs from collaborated corrections list. Assess progress in assigned projects including cost estimates, schedules, technical and performance supportable baseline requirements by applying and tracking project progress methods and procedures.
Project Engineer/Internal Auditor Confidential
- -The primary purpose of this position is to serve as the senior professional engineer facilitating a team of lower graded engineers/architects from a variety of disciplines and technical staff on large and complex design and projects. Team lead for product and program development consisting of conceptual design and project development effectively initiated, planned, designed, executed and implemented automation turnkey projects through start-up.
- Lead investigation of field safety incidents assist root cause analysis by working with cross-functional teams: Installation, Technician Specialists, Design Engineering and EHS. Utilizes a professional knowledge of mechanical engineering to work large and complex design and projects created detailed technical drawings for electrical and instrumentation design of control, pneumatic, vfd, and remote instrument enclosures using AutoCAD.
- Managed night shift and provided staff supervision as a construction manager on contractor's installation of 1M automation project for customer in Chemical industry. Coordinated project turnover and closeout activities--successfully completing project two weeks ahead of schedule and under budget.
- Reviewed Scope of work for contractor task orders to aid in the preparation of contracts.
- Kept abreast of emerging technologies, regulatory requirements, and best practices to ensure electrical equipment selection and sizing, conduit and cable sizing, cable tray sizing, and voltage drop calculation that facility equipment, projects, and strategies remain relevant and functional.
- Assisted with the design and start-up mechanical and electrical of the bottom and up-tower panels for a turnkey wind turbine project this was successful and cutting edge technology never performed before in the field.
- Designed, assisted in installation, and start-up/troubleshot an integrated junction box with Trumpf laser, ABB robot, control panel and safety circuits for gas turbine customer.
- Analyzed proposals to ensure specifications and estimate to completed work for accuracy.
- Designed 3 heat trace projects with electrical control panel, RTD location plans, conduit and cable tray routing, cable schedule, heat trace hardware and software, installation details.
- -Oversaw quality assurance, data management, product testing, supply chain management, cost estimating/forecasting, property management, contracting activities, and provided program status briefings to leadership.
Project Manager/ Director of Safety, Panelmatic Greenville, Piedmont, Confidential -Simultaneously managed 4 projects ahead of schedule and under budget totaling .5M.
- Successfully managed facilities and oversaw respective improvement projects through various stages of the acquisition and project process.
- Experienced working directly with Controls hardware, PLC and HMI design, and design of assembly drawings for DCS and PLC control system cabinets and enclosures for the Automotive, Oil Gas, and Process industries.
- Engineer liaison for all 5 technicians on the manufacturing floor to the customer.
- Established creative solutions and resolved part, assembly and testing discrepancies.
- Expert who communicated with vendors to acquire material quotes for each project. Single handedly designed, troubleshot, and tested control panels which included Allen Bradley or Siemens ET200S hardware per project. Project Manager/Director of Safety, Confidential
- In this lead position, managed 7 to 13 projects on a quarterly bases, averaging a projected total completion of 2M.
- -Delivered customer approved Wind Turbine improvement and implementation project of 100 S88 2.1 MW Wind Turbines , with a total of 4,000 man-hours, and a 5 member team, brought the improvement process ahead of schedule and prevented catastrophic wind turbine related failure in the price range of 120M.
- Lead investigation of safety incidents assist root cause analysis by working with cross-functional teams: Technicians, Design Engineering, EHS and Management. Responsibilities included project management, administration, and operational control of 3-10 entry-level engineers operating the projects.
- Planned, led, organized, and controlled safety meetings for entire Panelmatic, TX division of 40 people insured division continuously followed all safety protocol and met Panelmatic Safety Program and OSHA requirements
- Experienced using AutoCAD to work directly with Safety Instrumentation Systems SIS and Emergency Shutdown Systems ESD , Controls hardware, PLC and HMI design, fiber optic network, and design of assembly drawings for DCS and PLC control system cabinets and enclosures for the Oil Gas and Process industries.
- Avoided any auditory discrepancies by performing calculations for electrical equipment selection and sizing.
- Developed designs for ventilation, air conditioning, power distribution, lighting and other systems of major size and complexity for use in large facilities Un-manned buildings Remote Instrument Enclosure Building . Oversaw respective improvement projects with engineers, project managers, designers, procurement, and technicians regarding design parameters for client projects. Developed quality assurance checklists, traveled to off-site facility to inspect fieldwork and compliance to customer drawings, specifications, and quality standards.
Confidential -Hand picked by leadership from Panelmatic Texas division to design/develop layouts and electrical schematic drawings of AB PLCs and Bentley Nevada equipment for Control Panels to top Panelmatic Youngstown turbine customer. This leadership role included responsibilities designing project for turbine customer was the first outsource of CAD work resulted in complete satisfactory on project.
Confidential Designed layout of the new shipping yard that contained sections of piping. Created maintenance assembly drawing of an Italian coupler machine shaft and bearings to improve maintenance practices. Provided performance management plans to meet mission requirements, established project goals via market intelligence/analysis.
Confidential Hand-designed architect plans in architect I class for 2800 sq ft house. Received excellent grade and plans went to the Ohio State Fair.
Hand-designed architect plans in architect I class for 2 car garage with work space.
SPECIALIZED SKILLS
AB plc hardware, ANSI, assembly, Automation, Automotive, budget, cable, CAD, communication skills, control's hardware, client, clients, design, drawing, electrical, fiber optics, fieldbus, field instrumentation, HART instruments, heat trace, IEC, IEEE, intrinsically safe, i/o list, ISO, layout, managing, mechanical NEC, network, NFPA, Oil Gas, one-line dwgs, plc design, p ids, plan drawing, planning, pneumatic panels, process design, Process Innovation, power distribution dwgs, Primavera P6, progress, proposal, purchasing, quality, read, safety, sales, scheduling, siemens plc hardware, SolidWorks, UL508A, Unigraphics, vfd panels, wiring, wiring schematics