SUMMARY

  • Over 30 years of experience in Project Management field.
  • Extensive experience in project management, resource management, scheduling, planning and Cost control within major industrial projects including Oil Sand, Mining, WWTP, Commercial and high rise Buildings.
  • Specialized in constructability reviews, Construction management planning, cost management, project controls procedures and methods, WBS, and earned value measurement systems.
  • Proficient in management planning, resource allocation & levelling techniques, bar charts, progress 'S' curves, manpower curves, trends and productivity calculation.
  • Excellent analysis, optimization, data processing, problem solving and leadership skills.
  • PMP certification is in progress.
  • Strong noledge Primavera P6, Access, Excel, MS Project.
  • Ability to work - well under pressure prioritizing company goals and challenging environment.
  • 15+ years of experience in planning/scheduling
  • 10 + years of experience in project scheduling in engineering, procurement, Commissioning and construction for large capital projects.
  • 15+ years of experience in heavy civil, Oil Sand, Water Treatment, Mining, transit construction and large scale design build construction, Commercial and high rise Buildings
  • Experienced with all aspects of teh Project Master Schedule (Engineering, Procurement, Construction and Commissioning Schedules) in a construction environment.
  • Ability to read and interpret construction drawings.
  • Excellent technical and mathematical abilities.
  • Fluency in English, oral and written.

TECHNICAL SKILLS

  • Primavera P6
  • Access
  • Excel
  • MS Project.

PROFESSIONAL EXPERIENCE

Senior planner/scheduler

Confidential

Responsibilities:

  • Complete project Master schedule including engineering, procurement, construction and commissioning developed and maintained teh project schedule(s) with collaboration from project managers/construction managers and inputs from Engineering, procurement, subcontractors & client.
  • Provided teh Technical support to Ensure dat teh project schedule is maintained to Management’s satisfaction and realistic schedule.
  • Prepared and maintain complex construction, engineering and procurement schedules for teh project.
  • Prepared reports for Operations Team and Management regarding project scheduling activities.
  • Reviewed and incorporated subcontractor’s schedules into teh Master Schedule.
  • Developed Master schedules using Primavera Project Planning software (P6)
  • Provided recommendations for corrective action due to delays in certain aspects of teh project.
  • Developed schedules in Primavera for teh project during all stages of teh project.
  • Worked with client staff and sub-contractors and developed status schedules for their project components.
  • Ensured Project Schedule activities are coded by teh project work breakdown structure for Cost / Schedule integration and analysis
  • Defined and optimized critical paths, perform total float analysis and notify project management status of critical activities and schedule risks.
  • Conduct recovery plans, contingency planning and schedule compression techniques (part of risk management).
  • Supported and monitored of contract actual progress versus planned progress and key performance indicators, provided exception reporting, and recommend actions.
  • Produced consolidated progress reports and analysis with bar charts, S-curves, manpower histograms.
  • Provided support on development of project cost expenditure forecast curves
  • Performed schedule risk analysis (gather data, input data, analyze, report) on a periodic basis or as required.
  • Developed construction field installation work packages (FIWPs) schedule based on level 4 and integration with Engineering / Procurement work packages.
  • Maintained liaison with project team regarding scheduling activities and assisted them in determining schedule priorities.
  • Attended project team and subcontractor’s meetings.
  • Developed schedule variation reports from baseline.
  • Exercised independent judgment in planning, scheduling, organizing, controlling and monitoring teh work team
  • Prepared weekly progress reports and project performance index (SPI/CPI).

Sr. Planner/Scheduler

Confidential

Responsibilities:

  • Created and revised preliminary master schedules and proposal for operations detailing teh sequence of all work to be performed to ensure schedule is realistic and competitive;
  • Incorporated resource and cost loading data into schedules as required
  • Assisted project managers and superintendents in creating short-term schedules and monitoring these schedules to determine their impact on teh master schedule;
  • Worked with project managers and superintendents to evaluate construction progress and provide regular schedule updates
  • Proactively identified problems or conflicts in teh project schedule and assisted teh Project Manager and teh Superintendent
  • Developed Master schedules using Primavera Project Planning software (P6)
  • Created sequence and schedule analysis
  • Developed and revised full resources and cost loaded project schedules
  • Coordinated project reporting to clients, owners, partners, etc.
  • Reviewed and analyzed schedules from project teams for completeness and overall TEMPeffectiveness.
  • Managed resource requirements
  • Provided 3 week look ahead schedules as well as other schedule updates
  • Provided analysis, progress reports and change impact analysis.
  • Communicate issues with upper management
  • Recovered Schedules and claim impacts
  • Collaborated with Engineering to put accurate estimates for change requests/Field Work Orders, assessed time and cost impact of teh changes, maintained updated logs for all FWI’s, RFC’s, CRC’s and change Orders.
  • Prepared and analyzed weekly & Monthly cost reports (Incurred, Committed & Forecast) and Estimated Project’s Profitability
  • Updating Coding structural for direct and indirect works including labour, Material, subcontractors and equipment and travel, and incorporated teh cost codes with work breakdown structure
  • Responsible for providing scope definitions and development of work breakdown structure (WBS), developing and maintaining detailed EPC project schedules and plan utilizing Primavera Project Planner (P6).
  • Assisted in Estimating field/shop manpower requirements, assigned resources to tasks, perform resource levelling to insure constant resource utilization and prepared manpower loading reports
  • Co-ordinated schedules with Engineering, procurement and field/shop supervisors
  • Prepared weekly progress reports and project performance index (SPI/CPI).

Planner/Scheduler

Confidential

Responsibilities:

  • Created and maintained level 3&4 construction schedule for teh project
  • Maintained schedules and kept project resources on track, provided regular project updates, established project's WBS, cost accounts, baseline schedule, trends and extra work logs and forms, developed progress monitoring database, developed report templates, provided functional support to all project controls activities, performed analysis on cost and schedule variances and developed mitigation plans
  • Created, developed and maintained construction, commissioning and start-up schedule for teh project
  • Created maintenance shutdown plans, scheduled plans using Primavera P6, monitored progress and generated schedule and productivity reports, liaised with project engineers, superintendents and Foremen.
  • Determined scope definition requirements for a discipline or other specialty, and works with Engineering and other sources to coordinate teh production of required data to conform to teh overall estimate preparation plan.
  • Developed quantity takeoffs for a discipline or specialty using defined documents or undefined scope assumptions.
  • Independently provided financial reporting and trending, with oversight, for teh Project Manager
  • Assisted in developing specific project codes of accounts and recommends appropriate modifications and revisions. dis includes training in teh proper use and definitions for teh cost accounts.

Planner/Scheduler

Confidential

Responsibilities:

  • Planned/scheduled and controlled all construction works using Primavera P3. Including formworks, structural and made required modification as per site condition. Followed all additional works and submitting all Extra Costs. Preparation of estimates including special exceptions and omissions.
  • Analyzed monthly schedules and prepared reports.
  • Monitored and analyzed labor productivity and prepare reports
  • Prepared "S" curves for major commodities, progress and productivity
  • Prepared cost flows and cash flows
  • Updated actual costs and resources on a regular basis and worked with cost control to update forecasts
  • Developed quantity takeoffs and issued Commodity Curves.