We provide IT Staff Augmentation Services!

Project Manager Resume

2.00/5 (Submit Your Rating)

Pittsburgh, PA

SUMMARY

  • Project controls professional experience in scheduling, cost engineering, and project management.
  • Currently working for systems under contract to Rail Control.
  • Formally wif as senior project controls analyst wif BP .
  • Former manager of outage planning wif responsibility for outage planning at 19 of Energy’s waste to energy facilities.
  • Previously program analyst at Calvert Cliffs Nuclear Plant wifin the Online Scheduling Department.
  • Overseas experience as planner / scheduler for facilities and maintenance at Airfield .

TECHNICAL SKILLS

Project Scheduling: Skilled in the use of Confidential & Microsoft Project scheduling software.

Software experience: noledgeable Word, Excel, Access, SAP, Confidential, Peoplesoft, and some experience wif Visual Basic and SQL.

PROFESSIONAL EXPERIENCE

Confidential, Pittsburgh PA

Project Manager

Responsibilities:

  • Under contract to Confidential Transportation as lead planner / P6 Scheduler for a 50 million dollar upgrade for DFW airport ATS expansion.
  • Responsible for creating and updating the P6 project schedule and reports both internally and to the customer for the DFW ATS expansion project.

Confidential, AnchorageAK, Confidential Confidential

Senior Consultant

Responsibilities:

  • Site scheduler wif Confidential, Confidential Data Center.
  • Responsible for ICM SP schedule updates utilizing P6 Confidential to the office, working wif contracting partners on scheduling parameters and updating site Facility operations schedules and KPI’s.
  • Previously worked as the commercial analyst for BP Alaska wifin the anchorage office responsible for project creation, tracking, and budget analysis utilizing SAP for the BP Alaska maintenance group.
  • Assisted wif creating a Power BI tool utilizing the Oracle / SAP database to report on total costs vs budget for BP Alaska.
  • Sole commercial analyst for the R&M group at BP Alaska and responsible for creating and tracking all maintence projects above $2 millon wifin SAP.
  • Worked wif field managers as well as the budget holder to streamline approvals process of projects to optimize project creation and execution.

Confidential - Morristown

Outage Manager

Responsibilities:

  • One of 2 Outage Managers for Confidential ’s fleet of 43 energy to waste facilities.
  • Responsible for direct oversight of 4 schedulers and 3 project managers for the northeast, south, and NYC metro areas.
  • Provided important strategic advice in creation of centralized outage planning (previously planning was done on a site by site basis only).
  • Coordinating wif 43 facilities on creating and updating a resource driven schedule utilizing Confidential P6, SAP, and Confidential software.
  • Oversight of facility outage work orders in Confidential / SAP along wif the outage project schedules for 19 waste to energy facilities.
  • Played integral role in Confidential ’s effort to save 25 million dollars in 3 years through optimization of facility outages as an original member of the outage optimization group.
  • Provided critical advice based on previous experience, in the creation of a centralized planning process and department for Confidential .
  • Original creator of documents and reports needed for a planning organization including, an ORI (readiness index) and Critique reports (for measuring performance and schedule adherence).

Confidential

Program Analyst - Online Scheduling

Responsibilities:

  • Responsible for updating P6 schedules as well as maintaining and updating databases ( Confidential, Confidential P6, and Microsoft Access).
  • Creating and running reports and Key Performance Indicators (KPIs) using Microsoft Access, Microsoft Excel, Confidential, and Confidential P6.
  • Business Administrator for Confidential and Confidential P6 at the Calvert Cliffs site, including ensuring proper communication and information transfer between Confidential and P6 software.
  • Providing P6 Confidential cost loaded schedules to accounting on a weekly basis during outages.
  • Responsible for creating and running Outage Excel and MS Access Indicators / KPIs and SPIs for refueling outages utilizing P6 Confidential data.
  • Key player in implementing Work Control Process Indicators report which runs daily to all 3 of Confidential nuclear energy site’s utilizing the current P6 schedule and Confidential database.

Confidential

Lead Project Planner / Scheduler

Responsibilities:

  • Planned, produced and updated schedules for TF-134 using MS Project 2007.
  • Tracked shipment of materials using Confidential software.
  • Responsible for all planning and reviewing of Confidential construction projects as the Lead Planner / Scheduler for Bucca TF-134 Confidential Confidential .
  • Revised information contained in the schedules based on new scheduling procedures and processes using Microsoft Excel along wif MS Project, new schedules were produced which greatly enhanced the information contained wifin the schedules and allowed for greater information sharing wif the construction department.

Confidential

Senior Project Planner/Scheduler

Responsibilities:

  • Planned & produced schedules wif Microsoft Project Scheduler & Confidential P6 software.
  • Responsible for creating and distributing accurate duration driven schedules for all construction projects planned at Confidential.
  • Key player in implementing Scheduling at BAF during a Pre-CAR period when scheduling was required to be implemented in a very timely manner in order to meet contractual obligations.
  • Key player in implementing Scheduling at BAF during a Pre-CAR period when scheduling was required to be implemented in a very timely manner in order to meet contractual obligations.
  • Acted as the Scheduling POC for BAF, was responsible for attending all supervisor meetings, meeting regularly wif the ACO, Site Manager, Project Leader for Confidential, and coordinating wif other schedulers throughout the Theater.
  • Acting Lead Scheduler for Confidential, responsible for oversight on all scheduling activities for the bases of Confidential, as well as management of the scheduling department.

Confidential

Utilities Administrator

Responsibilities:

  • Responsible for creating, tracking and updating work orders in the Utilities department database.
  • As well as tracking and updated department manpower & material resources.
  • Worked as a LN/TCN escort, responsible for monitoring and escorting LN/TCN’s on site while they performed their work duties.
  • Trained and worked as Electrical Department Administrator.
  • Trained and worked as Utilities Department Administrator creating and tracking work orders.
  • Coordinated wif Utilities Plumbing Department in an effort to create a total material inventory wifin an Access Database.
  • Revised method of collecting information on work orders using Microsoft Access for electrical material records so dat information could be stored by job number and reviewed upon job completion for more accurate information on the amount material used.

Confidential, Pittsburgh, PA

Journeyman Inside Wireman

Responsibilities:

  • Responsible for installing, maintaining and troubleshooting all types of electrical circuits. Including lighting, motor control, low voltage, high voltage, DC, AC, speaker systems, fire alarm systems, PLCs, and isolated ground for computer circuits.
  • Installed all types of conduit and wiremold, including Rigid, PVC, and EMT.
  • Utilized training in teledata to set up information distribution networks wif CAT V cabling, fiber optics, and patch panels.

We'd love your feedback!