We provide IT Staff Augmentation Services!

Project Manager Resume Profile

2.00/5 (Submit Your Rating)

Computer Skills

  • Word Perfect IBM
  • Paradox IBM
  • Quark Express MAC
  • Adobe Illustrator MAC
  • Page Maker MAC
  • Draw Perfect IBM
  • Omni Page Professional MAC
  • Data Viz Translators MAC
  • DEC PDP 11/70
  • Wang VS Systems
  • IBM PC's DOS, UNIX,UNIQUE
  • Apple MacIntosh Operating Systems 6.07 7.01

Other Skills

  • VM/MVS/ESA
  • INFO
  • ISPF
  • DSR
  • SDRR
  • ISO
  • HOCSR
  • iCMM
  • CM
  • DARC
  • WJHFAA Tech Center NAS lab
  • HP ALM Lockheed Martin version
  • IBM 3602 POS System
  • Creating and Managing QA / Test Team
  • MS Office

Experience

Confidential

Hurricane Sandy Debris Cleanup Monitor. Working to monitor that NJDEP cleanup procedures are followed and that no violations occur.

Confidential

  • Asst. Test Team Lead for the Independent Test Team.
  • Assigned to Assist Lockheed Martin Test Team Lead in evaluating, checking for completeness, and assigning team members to patches and fixes for testing and evaluation.
  • Baseline testing, validation of software corrections, additions and deletions, Testing done in lab on HOST NAS System. Creating coding and maintaining software test procedures
  • Assist in the development of documentation and specifications.
  • Provide routine configuration management activities.
  • Integrate baseline for new system changes.
  • Field Support Help Desk: Provide assistance to all 20 ARTCC's and the FAA Academy.
  • Help to resolve problems and questions related to all aspects of supporting the NAS software system and all associated support systems and tools.
  • Independent Test Team: Provide independent-level live and simulated testing to verify the integrity and completeness of software fixes, following iCMM and LMCO ALM procedures to meet and maintain ISO 9000 standards.

Confidential

  • In charge of Quality Assurance team activities on the DARC Direct Access Radar Channel Project and SOS 1 Software Operational Support Project. Also responsible for Software Configuration Management.
  • Review Statements of Work, development of SQA Plans, Master Test Plans, Test Procedures and meet with FAA to review requirements..
  • Review all software documentation and codes developed for adherence to the SQA Plan and the software development documentation requirement analysis, preliminary design, and critical design .
  • Development of RMUX and R-Control scenarios for Programmer, QA and FAA Acceptance Tests.
  • Participated in Code Walk-through's and witnessed programmer Unit and Integration tests.
  • Maintained configuration management control of developed software.
  • Supervised the maintenance of Problem Tracking Forms PTF's written during testing phases to ensure their completeness.
  • Wrote Review Item Discrepancies for conflicts discovered in QA review of applicable documentation and Statement of Work and program Technical Reports PTR's .
  • Recommended PTR's for problems discovered during testing that related to original code and supervised their maintenance to ensure their completeness.
  • Wrote FAA Acceptance Test Reports and ensured that the SQA Plan was followed and that any valid modifications were documented, approved and incorporated.
  • Planned and implemented QA audits.
  • Provided supervision to junior QA staff members on the DARC contract and on other projects as the need arose.
  • Participated in the successful development of and supervised the testing that led to the field release of RAJ07.
  • Wrote the FAA Acceptance Test Procedures and supervised testing of RAK01 through RAL01 DARC Operating Systems.
  • Provided assistance to other projects in reviewing SOW's and technical proposals.
  • Participated in Three Level Weather Phase II Testing, DCC 3 Level Weather Testing, CSC testing, DCC Sub-task Assignments and worked on the Traffic Management System survey.
  • Called on to create special RMUX and R-Controls test scenarios for trouble shooting Field Support Problems Strobe 3 Level Weather, etc. .
  • Worked on ADAS proposals answers to FAA questions .
  • In 1990, assigned to the SOS II project to assist in research and development work on the DARC RMUX Simulator.
  • 1991 transferred to the SOS II contract with Dimensions International Inc. as a Technician/Procurement Specialist. In this capacity I worked with the Manufacturing Division setting up their purchasing, inventory and tracking systems.
  • Also had the responsibility for updating, maintaining AOS-300 EPROM equipment and coordinating the responses to their AOS-300 EPROM Programming Requests.
  • Received requests and in turn provided the analysis and evaluation of proposals for purchase of Diskette and Tape duplication and other specialized equipment by the FAA, AOS-300. Have also worked on DBRITE, CD-2, MODE-S, ASR-9, ODAPS, CDC, FDIO, ARTS II, ARTS IIA NRKM Memory and RMMS kit, developing, building and testing, for field release.
  • Participated in the successful development of and supervised the testing that led to the field release of RAJ07.
  • For participation in this project, received a Special Recognition Certification from the FAA AFM-1 .
  • Aided in the successful development, wrote the FAA Acceptance Test Procedures and supervised testing of RAK01 through RAL01 DARC Operating Systems.
  • Provided assistance to other projects in reviewing SOW's and technical proposals.
  • Participated in Three Level Weather Phase II Testing, DCC 3 Level Weather Testing, CSC testing, DCC Sub-task Assignments and the Traffic Management System survey.
  • Created special RMUX and R-Controls test scenarios for trouble shooting Field Support Problems Strobe 3 Level Weather, etc. .
  • Worked on ADAS proposals and the SOS II project to assist in research and development on the DARC RMUX Simulator.
  • Also have worked with other divisions in obtaining assistance in special scenario generations and assisted ASM 163 with the research, isolation and resolution of various DARC hardware problems.
  • Transferred to the SOS II contract with Dimensions International Inc.
  • Worked with Manufacturing Division setting up their purchasing, inventory and tracking systems, updating and maintaining AOS-300 EPROM equipment.
  • Received a FAA Letter of Appreciation for Outstanding Assistance provided to AOS-300.

We'd love your feedback!