Project Manager Resume Profile
2.00/5 (Submit Your Rating)
Computer Skills
- Word Perfect IBM
- Paradox IBM
- Quark Express MAC
- Adobe Illustrator MAC
- Page Maker MAC
- Draw Perfect IBM
- Omni Page Professional MAC
- Data Viz Translators MAC
- DEC PDP 11/70
- Wang VS Systems
- IBM PC's DOS, UNIX,UNIQUE
- Apple MacIntosh Operating Systems 6.07 7.01
Other Skills
- VM/MVS/ESA
- INFO
- ISPF
- DSR
- SDRR
- ISO
- HOCSR
- iCMM
- CM
- DARC
- WJHFAA Tech Center NAS lab
- HP ALM Lockheed Martin version
- IBM 3602 POS System
- Creating and Managing QA / Test Team
- MS Office
Experience
Confidential
Hurricane Sandy Debris Cleanup Monitor. Working to monitor that NJDEP cleanup procedures are followed and that no violations occur.
Confidential
- Asst. Test Team Lead for the Independent Test Team.
- Assigned to Assist Lockheed Martin Test Team Lead in evaluating, checking for completeness, and assigning team members to patches and fixes for testing and evaluation.
- Baseline testing, validation of software corrections, additions and deletions, Testing done in lab on HOST NAS System. Creating coding and maintaining software test procedures
- Assist in the development of documentation and specifications.
- Provide routine configuration management activities.
- Integrate baseline for new system changes.
- Field Support Help Desk: Provide assistance to all 20 ARTCC's and the FAA Academy.
- Help to resolve problems and questions related to all aspects of supporting the NAS software system and all associated support systems and tools.
- Independent Test Team: Provide independent-level live and simulated testing to verify the integrity and completeness of software fixes, following iCMM and LMCO ALM procedures to meet and maintain ISO 9000 standards.
Confidential
- In charge of Quality Assurance team activities on the DARC Direct Access Radar Channel Project and SOS 1 Software Operational Support Project. Also responsible for Software Configuration Management.
- Review Statements of Work, development of SQA Plans, Master Test Plans, Test Procedures and meet with FAA to review requirements..
- Review all software documentation and codes developed for adherence to the SQA Plan and the software development documentation requirement analysis, preliminary design, and critical design .
- Development of RMUX and R-Control scenarios for Programmer, QA and FAA Acceptance Tests.
- Participated in Code Walk-through's and witnessed programmer Unit and Integration tests.
- Maintained configuration management control of developed software.
- Supervised the maintenance of Problem Tracking Forms PTF's written during testing phases to ensure their completeness.
- Wrote Review Item Discrepancies for conflicts discovered in QA review of applicable documentation and Statement of Work and program Technical Reports PTR's .
- Recommended PTR's for problems discovered during testing that related to original code and supervised their maintenance to ensure their completeness.
- Wrote FAA Acceptance Test Reports and ensured that the SQA Plan was followed and that any valid modifications were documented, approved and incorporated.
- Planned and implemented QA audits.
- Provided supervision to junior QA staff members on the DARC contract and on other projects as the need arose.
- Participated in the successful development of and supervised the testing that led to the field release of RAJ07.
- Wrote the FAA Acceptance Test Procedures and supervised testing of RAK01 through RAL01 DARC Operating Systems.
- Provided assistance to other projects in reviewing SOW's and technical proposals.
- Participated in Three Level Weather Phase II Testing, DCC 3 Level Weather Testing, CSC testing, DCC Sub-task Assignments and worked on the Traffic Management System survey.
- Called on to create special RMUX and R-Controls test scenarios for trouble shooting Field Support Problems Strobe 3 Level Weather, etc. .
- Worked on ADAS proposals answers to FAA questions .
- In 1990, assigned to the SOS II project to assist in research and development work on the DARC RMUX Simulator.
- 1991 transferred to the SOS II contract with Dimensions International Inc. as a Technician/Procurement Specialist. In this capacity I worked with the Manufacturing Division setting up their purchasing, inventory and tracking systems.
- Also had the responsibility for updating, maintaining AOS-300 EPROM equipment and coordinating the responses to their AOS-300 EPROM Programming Requests.
- Received requests and in turn provided the analysis and evaluation of proposals for purchase of Diskette and Tape duplication and other specialized equipment by the FAA, AOS-300. Have also worked on DBRITE, CD-2, MODE-S, ASR-9, ODAPS, CDC, FDIO, ARTS II, ARTS IIA NRKM Memory and RMMS kit, developing, building and testing, for field release.
- Participated in the successful development of and supervised the testing that led to the field release of RAJ07.
- For participation in this project, received a Special Recognition Certification from the FAA AFM-1 .
- Aided in the successful development, wrote the FAA Acceptance Test Procedures and supervised testing of RAK01 through RAL01 DARC Operating Systems.
- Provided assistance to other projects in reviewing SOW's and technical proposals.
- Participated in Three Level Weather Phase II Testing, DCC 3 Level Weather Testing, CSC testing, DCC Sub-task Assignments and the Traffic Management System survey.
- Created special RMUX and R-Controls test scenarios for trouble shooting Field Support Problems Strobe 3 Level Weather, etc. .
- Worked on ADAS proposals and the SOS II project to assist in research and development on the DARC RMUX Simulator.
- Also have worked with other divisions in obtaining assistance in special scenario generations and assisted ASM 163 with the research, isolation and resolution of various DARC hardware problems.
- Transferred to the SOS II contract with Dimensions International Inc.
- Worked with Manufacturing Division setting up their purchasing, inventory and tracking systems, updating and maintaining AOS-300 EPROM equipment.
- Received a FAA Letter of Appreciation for Outstanding Assistance provided to AOS-300.