As a mechanical engineer with over 30 years of pipeline and related facilities construction, I am highly qualified to meet the needs of any project management position requiring the design and construction of oil or gas transportation, facilities, oil storage, oil terminal or oil tanker docking.

EXPERIENCES

Project Manager, Confidential

Project manager for 175-mile 36 crude oil pipeline. This pipeline construction in East Texas was spread 2 of the Gulf Coast Project of the TransCanada Keystone XL Pipeline. As Project Manager, I was Responsible for all phases of construction and conformity to the Safety, Specifications and numerous PHMSA quality requirements. The project included automatic welding, AUT NDE and automatic coating. The 12 HDD's are under rivers, wetlands, lakes and sensitive environmental areas.

Senior Project Manager Confidential

Project manager for 130-mile 12 propylene pipeline. The design and construction of this pipeline passes through highly congested Houston area neighborhoods and commercial areas. Also, construction requires multiple HDD's including under the Houston ship channel. Project manager for 36 crude pipeline in Port Arthur. TX with a HDD under the Neches River ship channel.

Project Manager, Confidential

Contract project manager for the mid-stream design and construction of over 60 miles of mid-stream pipelines in the Eagle Ford shale area of south Texas. The successful construction of both gas and liquid systems included 6 , 8 , 10 and 12 pipe six directional drills ten meter stations and one 8 on 12 hot tap.

Project Manager, Confidential

  • Project manager for the Plains St James Crude Oil Terminal and Dock. Directed the successful design and construction of a 300M totally remote controlled terminal facility with 13 crude oil storage tanks containing over 7M bbls of storage with capability of measuring and delivering 55,000bbl/h. Terminal features include five vertical can pumps driven by five electric motors totaling 11,000hp all driven by VFD's, eight helical turbine meters six-12inch and two-16inch with a 36 prover and over 250 MOV's for product control. In connecting the terminal to customers, four-4,000ft pipeline HDD's 20 , 30 , 36 , and 42 were utilized.
  • Directed the design of two ship docks on the Mississippi River, each capable of berthing 150,000 DWT crude vessels and 30,000 bbl barges. The greenfield dock design included a stand alone terminal control facility with ten helical turbine meters, four 16 loading arms, two provers and all of the ancillary infrastructure required for simultaneous ship and barge operations.

Principal Engineer, Confidential

  • Project manager for the design and installation of onshore and offshore interconnection facilities of producers and other pipelines to the TGP and ANR pipeline systems.
  • Successful projects include the GOM Ship Shoal Block 471 platform interconnect to Tennessee Gas Pipeline. The 300mmcfd interconnect between ANR and Tennessee Gas pipelines in Rapides Parish, La.

Principal Engineer, Confidential

Project manager for high pressure natural gas pipeline projects on El Paso systems in the Southwestern states. Responsible for assisting in FERC filings, Environmental Reports, BLM applications and State permitting. Directly responsible for Estimating, Detailed Engineering and Design, Procurement, Construction Management, Project Documentation and coordination with El Paso Marketing, Regulatory, Environment, Legal, Systems Planning, Gas Control and Operations. Successful projects include 7-mile 20-inch Reliant Desert Basin Pipeline, 4-mile, 24-inch Duke Arlington/PWE Redhawk Pipelines, 12-mile, 10-inch Silver City Lateral replacement, 6-mile, 16-inch PGE Hauquahala Pipeline, 17-mile, 20-inch Line 2121 replacement and 88-mile, 30-inch Line 1903 Conversion Project from liquid to gas service which included 6-miles of new 30-inch pipeline construction.

Consulting Engineer/Project Manager, Confidential

Provided engineering and project management services for natural gas and liquid pipelines in California. Successful projects include 13-mile, 20-inch Calpine Sutter gas pipeline with 20 directional drills one a mile long , 24-inch and 16-inch Calpine Delta gas pipelines and 8-miles of 6-inch and 8-inch Occidental Petroleum ethane and propane pipelines in Elk Hills, CA.

Supervisor for Confidential

  • Department head responsible for the development of long term systems planning and project feasibility studies and expansion analysis including route selection, pipeline modeling, estimating, measurement requirements and compressor sizing.
  • Project manager responsible for inception to start-up of high pressure gas transmission lines and distribution systems in Arizona, California and Nevada. Testified before the California Public Utility Commission as project manager of the 30-mile 30-inch High Desert Pipeline. Project manager for the 44-mile 16 Silver Gem Lateral in northern Nevada.

Consulting Engineer, Confidential

Consulted in the energy industry in the feasibility and design of pipeline projects. Assisted in the development of a detailed analysis of the flue gas system in the Clark Refinery in Chicago. Evaluated and developed several pipeline projects for Georgia Pacific to by-pass LDC's.

Engineer, Confidential

Directed all engineering and operations, both interstate and intrastate, of an upstart natural gas pipeline company. Totally and directly responsible for all the design, construction, and operations of a grass roots 200-mile pipeline system in Louisiana and Texas. Managed the design, construction and operation of numerous measurement stations up to 150mmcfd , seven compressor stations, gathering systems and numerous well connects.