Manufacturing�quality Analyst Resume
Decatur, IL
OBJECTIVE
Seeking a full time position in the manufacturing industry with opportunity for advancement based on achievement and results
PROFESSIONAL EXPERIENCE
Manufacturing Quality Analyst, Confidential, Decatur, IL
Produces off - highway trucks used in Mining
- Organized quality certification meetings and identified 30 critical defects determined to be the root cause for potential problems
- Identified top defects using Pareto analysis and analyzed root cause resulting in 30% reduction in overall defects by implementing quality gate checks and permanent corrective action
- Performed time studies and line balance using Timer Pro software to identify non value added activities and eliminated additional manpower resulting in significant savings
- Active team member 6 Continuous Improvement projects for immediate resolution of problems which reduced the specific frequency of occurrence of a defect from 20 to 5
New Business Development Engineer, Confidential,
Auto parts Manufacturer for leading Automobile industries
- Handled Request for Quotations and quoted prices for 20 auto components that resulted in expansion of customer base and customization
- Conducted monthly competitive analysis of ten auto part companies in India which was used in developing business plan for introducing new products
- Coordinated with three potential customers to secure business for auto parts in their new ventures (Magna, CNH and Ashok Leyland)
Quality Auditor (Client: Eaton), Confidential Auto parts Manufacturer for leading Automobile industries
- Identified potential defects in sliding clutch assembly, which were not determined during production
- Provided feedback to operators of the potential defects by creating a presentation of the different defects and its effects
ACADEMIC PROJECTS
- Resource allocation at a hospital during disaster scenario using ARENA
- The bottlenecks were found to be the availability of personnel, water, power and transportation
- Current system was evaluated and optimal allocation of resources were implemented
- An improved model was designed which resulted in optimized allocation of resources during a disaster.
- Programming of PLC and robotic arm
- Programmed PLC to run conveyor using RS LOGIX5 and robot arm programming was done with Roboware
- Programming the PLC included to transport raw material using pallet on conveyor and picked up by robotic arm
- Automated the process and reduced the cycle time by 10 minutes
- Magnetic Abrasive Finishing Of Mild Steels Using Silicon Carbide Abrasives
- Focused on a new advanced process for achieving submicron surface
- Experimental setup done on milling machine
- Proposed that surface finish of mild steel is sub micron finish and more precise to dimensions compared to micron finish by grinding process
SOFTWARES
- Generic: Proficient in Microsoft Office, C language, SAS, Minitab
- Design: Solid Works, Arena, AUTOCAD
TECHNICAL SKILLS
Computer aided manufacturing, Advanced production and inventory control, Industrial logistics engineering, Operations research, Linear programming; Simulation, Analysis of variance, Regression and correlation analysis