Sr. Advanced Quality Engineer Resume
2.00/5 (Submit Your Rating)
Plymouth, MI
SUMMARY:
- Strong engineering knowledge and field experience of various manufacturing methods as a development engineer & Tooling Engineer
- Strong knowledge and Experience in designing, developing and APQP as a program & quality leader
- Strong knowledge of geometric design and tolerancing (GD&T based on ASME Y14.5M)
- Communicate in English (ability in speaking and writing) and basic Spanish with floor workers.
- Computer literate: MS Office (Excel, Power Point, MS - Word), Internet and CAD Tools etc.
- Ability to effectively prioritize and execute tasks in a fast-paced environment and available as needed as training, travel and meetings.
- LSS (Lean Six Sigma) green belt, Internal quality examinant (ISO/TS 16949), CAD Tools (CATIA V5)
PROFESSIONAL EXPERIENCE:
Confidential, Plymouth, MI
Sr. Advanced Quality Engineer
Responsibilities:- Responsible for product Launch Advance Quality Planning duties.
- Assist/support Supplier Quality Engineer, including supplier selection, kick-off meetings and PSO.
- Ensure preparation and on-time delivery of new product Launch related Customer Production Part Approval Process (PPAP) packages.
- Lead Internal Audits, report audit findings and ensure timely close out of any required corrective actions.
- Global Simultaneous Development Team Structure.
- Travel to West Point, GA and South Korea.
Confidential, Farmington Hills, MI
Quality Manager
Responsibilities:- A branch office in the US based on Korean Automotive Company. (Tier 1 supplier of FCA)
- Setting-up QMS/EMS for New Plastic Injection Plant and Achievement of ISO/TS-16949, ISO-14001.
- Owner of Visual Management System and Laboratory.
- Roundness Machine / CMM Training.
- US Office Closed.
Confidential, Pontiac, MI
Powertrain Mechanical Engineer
Responsibilities:- Job offer Received (but declined it)
Confidential, Troy, MI
Program & Quality Manager
Responsibilities:- Make tooling quotes and unit prices of suppliers for RFQ and develop the assigned new projects.
- 1st contact point for customers and perform all APQP tasks as a Program manager
- Perform Process Audit, PPAP, Core tools such as control plan as a Quality team leader at Mexico Plant.
- Launched the 1st project of Kia Mexico successfully as a program manager. (Project Name: YDm)
- Built Injection Molds and C/F from Concept to Tool-off with tooling suppliers as a Tooling Engineer.
- Liaison between customer, commercial, tooling, quality, manufacturing, logistics & outside contractors.
- Interior Plastic Systems such as Cockpit Module and Components.
- Plus, Oil Reservoir Tank System & Air Blow Ducts, Crash Pad-Skin Foaming (Kia Mexico project)
- GM, NAVISTAR, Honda, KIA Mexico.
- US Office closed.
Development & Sales Manager
Responsibilities:- Ability to make tooling quotes and unit prices of Tier 2 parts (RFQ)
- Perform the assigned new projects as Program Manager.
- Interior Plastic Systems such as Glove Box of Cockpit Module, Pillar Trim and Air Blow Ducts etc.
- Arrange for New Vehicle Launch of Hyundai/Kia North America plants as Launch Manager.
- Ability to build Injection Molds and C/F from Concept to Tool-off with suppliers as Tooling Engineer.
- 1st contact point for general and technical issues of H/KMC.
Confidential
Application Engineer
Responsibilities:- Main items (Closure System): PSD system (Power Sliding Door System), PTG(Power Tailgate System)
- Provide Hyundai/Kia with technical support for new projects on behalf of US headquarter.
- Analyze new RFQ and arrange for technical meetings.
- Coordinate containment actions of quality issues and arrange for 100% re-inspection.
- Communicate with Customers and Strattec plant in Mexico for EO application.
- 1st contact point for general and technical issues of H/KMC.
Confidential
Project Manager
Responsibilities:- Keep track of assigned projects in cooperation with all project members till 3 months after SOP.
- Responsible of all APQP activities and Customer PPAP approval.
- Communicate with CFT members and INTEVA Group by regular conference call during APQP activities.
- Stamping Parts (include one-punch, progressive, fine-blanking type)
- Plastic Parts (include general injection, insert type, Gear/Screw) and Finish Area (include plating, coating, heat-treatment, etc)
- Heading, Forging, Spring, Cable and PCB Parts.
- Components/Raw Material Approval from Customer
- Built Injection Molds from Concept thru Tool-off for internal production (In cooperation with suppliers)
- Jigs & Checking Fixtures from Concept thru Tool-off (In cooperation with suppliers)
- Door Latch & Actuator Assembly Line Lay-out Design.
- DMS (Delphi Manufacturing System) Application and Process Control Analysis.
