Senior Sharepoint Consultant Resume
Melbourne, FloridA
TECHNICAL EXPERTISE:
C#.NET, VB.NET, Visual Basic, Visual C++, VBA, XML/XSLT, HTML/XHTML.NET Framework (4.6 through 2.0), WCF, WF, WPF, Silverlight. T - SQL, SQL, and code snippets.
Visual Studio (2015/2013/2012/2010/2008 ), ERWin, Visio, Visual InterDev, Adobe Creative Suite 5 Master Collection, Crystal Report, SSRS, SSIS, SharePoint, PowerShell, ETL, Nintex Workflow and Forms, Syntergy Replicator, Sharelink, and SharePoint Designer (2013\2010\2007).
ASP.NET, .NET Web Services, WCF, ASP.NET MVC, ASP, VB Script, ADO, COM, Win32 API, Windows SharePoint Services (3.0/2.0), Microsoft IIS (6/7/8/10), PowerShell Scripting.
SharePoint Server (2016/Online/ 2013/2010/2007 ), HP TRIM Record Management System (7.1/7.02), Microsoft InfoPath ( 2013/2010/2007 /2003), Microsoft Office Suite (all versions), Office 365, Project Server (Online/ 2013/2010/2007 ), Dynamics CRM, Power BI, Yammer, Confidential ECM, Deltek Costpoint, FAST Server, XMind, Sharegate, ShareCenter, Syntergy Connect, VMware.
Microsoft SQL Server (2014/2012/2008 R 2/2008/2005/2003 ), Oracle Database (11g\10g\9i\8i\8\7), Microsoft Access (2013\2010\2007\2003\2002\2000).
Microsoft Visual Source Safe, Microsoft Team Foundation Server, PVCS Version Control.
Windows, Windows Server, Windows Azure, UNIX, Apple, and Mobile Technologies.
Software Development Life Cycle (SDLC), Agile Software Development, Scrum, Capability Maturity Model (CMM), Capability Maturity Model Integration (CMMI), ISO 9000 and ISO 19000 series, and IT Service Management (ITIL Foundation).
PROFESSIONAL EXPERIENCE:
Confidential, Melbourne, Florida
Senior SharePoint Consultant
Environment: Microsoft Server 2012, Microsoft SQL Server 2014, Microsoft SharePoint (2016\2013\2010), SharePoint Designer (2013\2010), Microsoft InfoPath (2013), Microsoft Visual Studio (2015\2013), SSRS, SSIS, PowerShell, IIS, Office 365, C#.NET, VB.NET, ASP.NET, Nintex Workflow and Forms, XMind, Sharegate, Confidential 's Confidential ECM, Syntergy, and Hyper-V Virtualization.
Responsibilities:
- Responsible for gathering requirements for migration and configuration from Confidential to SharePoint 2013 and SharePoint 2016 sites for business teams across the organization.
- Complete content migration approach and review with Team Liaisons and Content Owners for approval.
- Ability to articulate complex site design(s) to both technical, non-technical team members and end-users clearly. Collaborate with stakeholders to understand their needs and translate them into technical requirements utilizing the most effective and efficient solution.
- Perform interface modifications to SharePoint utilities and tools, support content migrations using Confidential 's Confidential ECM (ShareCenter) and Syntergy Connect software, workflow development, solution deployments, and process management.
- Resolve technical issues based on experience with standard concepts, practices, and procedures within a particular field.
- Creating custom workflows using SharePoint Designer.
- Developing training materials for site admin and conducting training sessions for users highlighting benefits of migration to SharePoint 2013 and SharePoint 2016.
Confidential, Orlando, Florida
Senior SharePoint Consultant
Environment: Microsoft Server 2012, Microsoft Server 2008 R2, Microsoft SQL Server 2014, SQL Server 2008 R2, Microsoft SharePoint (2013\2007), SharePoint Designer (2013\2007), Microsoft InfoPath (2013), Microsoft Visual Studio (2012), SSRS, SSIS, PowerShell, IIS (8.5/10), Office 365, C#.NET, VB.NET, ASP.NET, Nintex Workflow and Forms, XMind, Sharegate, and Hyper-V Virtualization.
Responsibilities:
- Responsible for gathering requirements for migration and configuration from SharePoint 2007 to SharePoint 2013 sites for business teams across the organization.
- Complete design documents, content migration approach and review with development team for approval.
- Ability to articulate complex site design(s) to both technical, non-technical team members and end-users clearly.
- Collaborate with stakeholders to understand their needs and translate them into technical requirements utilizing the most effective and efficient solution.
- Perform interface modifications to SharePoint utilities and tools, support content migrations using Sharegate software, workflow development, solution deployments, and process management.
- Resolve technical issues based on experience with standard concepts, practices, and procedures within a particular field.
- Collaboratively execute software development life cycle activities; including scope and requirements definition, design, development, training and assist with content migration.
- Designing front end user interfaces for a SharePoint 2013 environment utilizing JavaScript, jQuery, HTML and CSS.
- Create custom list and library configurations to support the organizations business process. Microsoft IIS Server (8.5/10) configuration and troubleshooting.
- Creating custom workflows using SharePoint Designer.
- Developing training materials for site admin and conducting training sessions for users highlighting benefits of migration to SharePoint 2013.
Confidential, Port Orange, Florida
Senior SharePoint Developer/Administrator
Environment: Microsoft Server 2012, Microsoft Server 2008 R2, Microsoft SQL Server 2012, Microsoft SQL Server 2008 R2, Microsoft SharePoint (Online\2013\2010\2007), SharePoint Designer (2013\2010\2007), Microsoft InfoPath (2013\2010), Microsoft Visual Studio (2012\2010), SSRS, SSIS, PowerShell, IIS (7/7.5/8.0), Office 365, Project Server (Online/ 2013/2010/2007 ), Dynamics CRM, Power BI, Yammer, C#.NET, VB.NET, ASP.NET, Nintex Workflow and Forms, Deltek Costpoint, ShareGate, and VMware Virtualization.
Responsibilities:
- Worked with business and process owners to identify key business objectives, ensuring these are aligned with the company’s objectives.
- Provided a supporting and leadership role to ensure business continuity.
- Ability to anticipate and understand customer expectations, and ensure customer requirements are identified, met, and expectations appropriately managed.
- Ability to determine a course of action by breaking down complex requirements into smaller steps, planning for resources, and making allowance for risk mitigation.
- Demonstrated ability to contribute effectively towards the objective of the team, ability to cross-train and share knowledge, ideas and information.
- Ability to solve problems in a measured and creative way, capable of independently assessing a wide variety of tasks, and be proactive in relation to identifying and undertaking activities that are to the benefit of the business.
- Successfully completed migration projects from SharePoint 2010 to 2013 and to SharePoint online; configuration of Dynamics CRM for business development and custom management group; designed and implemented an Enterprise Content Management solution, including Controlled Document Management.
- Conceived, designed, developed and implemented various SharePoint business solutions.
- Microsoft IIS Server (7/7.5/8.0) configuration and troubleshooting.
- Hybrid SharePoint Farm administration using PowerShell scripting.
Confidential, Washington, DC
SharePoint Consultant
Environment: Microsoft Server 2008 R2, Microsoft SQL Server 2008 R2, Microsoft SharePoint (2010), SharePoint Designer (2010), Microsoft InfoPath (2010), Microsoft Visual Studio (2010), Microsoft Project Server (2007/2010), SSRS, SSIS, PowerShell, C#.NET, VB.NET, ASP.NET, Confidential 's Confidential ECM, Syntergy Replicator, Sharelink, Nintex Workflow and Forms, and VMware Virtualization.
Responsibilities:
- Designed the system used to process clearance for budget documents, Freedom of Information Act request, and Congressional correspondents through the Executive Office of the President.
- Migration from Confidential 's Confidential ECM Content Server using Replicator and Syntergy Sharelink to migrate content into SharePoint 2010 while maintaining the site structure, users and group permissions, metadata in document libraries and lists.
- Additional projects included rebranding of the Confidential Intranet SharePoint portal and assisted with upgrading their Microsoft Project Server 2007 to Microsoft Project Server 2010.
Confidential, Longwood, Florida
SharePoint Developer
Environment: Microsoft Server 2008 R2, Microsoft SQL Server 2008 R2, Microsoft SharePoint (2010/2007), SharePoint Designer (2007/2010), Microsoft InfoPath (2007/2010), Microsoft Visual Studio (2008/2010), ETL, SSRS, SSIS, PowerShell, C#.NET, ASP.NET, WPF and VMWare Virtualization.
Responsibilities:
- Worked on a project at Confidential Improvement for Confidential
- Designed InfoPath forms integrated with SharePoint Libraries or list and processed via Workflows designed in both SharePoint Designer and Visual Studios.
- Connecting InfoPath forms to various data sources including Business Connectivity Services (BSC).
Confidential, Orlando, Florida
SharePoint Consultant
Environment: Microsoft Server 2008 R2, Microsoft SQL Server 2008 R2, Microsoft SQL Server 2008 Reporting Services, Microsoft SharePoint (2010/2007), SharePoint Designer (2007/2010) Microsoft Visual Studio (2008/2010), ETL, SSRS, SSIS, PowerShell, C#.NET, VB.NET, ASP.NET, WPF and Citrix Virtualization.
Responsibilities:
- Completed the migration and configuration of Intranet sites for various departments from SharePoint 2007 to SharePoint 2010.
- Implemented custom workflows, data integration, dashboards, web parts, content types and SDLC using SharePoint family of technologies.
- Created new application architecture and design (.NET, SQL Server) and modifications and enhancements to existing applications.
- Utilized my in-depth knowledge of MOSS/SharePoint 2010 platform, performed application design for SharePoint and developed custom solutions on SharePoint.
- Other tasks included mentoring of other programmers, designing, coding, testing, analyzing, documenting, branding, and modifying software programs and applications to specifications throughout the production lifecycle in a SharePoint environment.
- Implemented Business Connectivity Services (BCS) for Business Intelligence (BI) reporting and analysis using SharePoint 2010 Insights (PerformancePoint Services, Excel Services, Visio Services, Chart Web Parts & Status Indicators, and Business Connectivity Services).
- Using ETL and SSIS, successfully migrated content databases from Microsoft SQL Server 2005 into Microsoft SQL Server 2008 R2. Implemented both FAST Search and Window 7 Search using custom WPF and WF solutions.
Confidential, Kings Bay, Georgia
.Net/SharePoint Consultant
Environment: Microsoft Server 2008 R2, Microsoft SQL Server 2008 R2, Microsoft SQL Server 2008 Reporting Services, Microsoft SharePoint (2010/2007), SharePoint Designer (2007/2010), ETL, SSRS, SSIS, PowerShell, C#.NET, VB.NET, ASP.NET, VB 6.0, VBA and VMware.
Responsibilities:
- Developed a new application in VB.NET, ASP.NET and SQL Server to replace existing critical application in VB 6.0 and Microsoft Access.
- Completed the migration and configuration of Intranet sites for various divisions from SharePoint 2007 to SharePoint 2010.
- Implemented custom workflows, data integration, dashboards, web parts, content types and SDLC using SharePoint family of technologies.
- Created new application architecture and design (.NET, SQL Server) and modifications and enhancements to existing applications.
Confidential, Greenbelt, Maryland
Technical Consultant
Environment: Microsoft Hyper-V Server 2008, Microsoft SQL Server 2008, Microsoft SQL Server 2008 Reporting Services, Microsoft SharePoint 2010, HP TRIM 7.1., C#.NET, VB.NET, and ASP.NET.
Responsibilities:
- Completed various training sessions on HP TRIM 7.1 Record Management system.
- Deployed and integrated HP TRIM 7.1 Record Management with SharePoint 2010.
- Prepared and presented a “What is New in SharePoint 2010 HP TRIM 7.1 Integration” seminar to stakeholders and sales executives.
- Completed intensive Administrator/Power User training on HP TRIM software.
- Deployed and configured HP TRIM 7.1 Record Management system.
- Deployed and configured Microsoft SharePoint 2010.
- Implemented and configured HP TRIM SharePoint 2010 Integration.
Confidential, Orlando, Florida
Svc Info Developer
Environment: Microsoft Hyper-V Server 2008 R2, Microsoft SQL Server 2008 R2, Microsoft SQL Server 2008 Reporting Services (SSRS), Microsoft SharePoint 2007, SharePoint Designer 2007, Microsoft Project Server 2007, Symantec NetBackup, Microsoft Visual Studio 2008, Microsoft Team Foundation Server, Microsoft Office 2007 Suites (Excel, Project and InfoPath), C#.NET, VB.NET, ASP.NET, VeriSign SSL Certificates.
Responsibilities:
- Enterprise wide migration of all existing SharePoint client and internal portals from various versions of SharePoint and platforms into SharePoint 2007.
- Worked as the technical team leader responsible for design, configuring, administrating, development and deployment of SharePoint environment specifically Site Templates, Site Definitions, Taxonomy, Metadata, Content Management, Collaboration, Windows Workflow Foundation, Custom Web Parts, Reports, BCS, Search, Content Types, Features, PerformancePoint, Security in Claims Base Identity, Single Sign On, Web Parts, Workflows, Master Pages and Content Pages. Configured and Integrated Project Server 2007 into the SharePoint Enterprise Farm.
- Experienced working with external internet facing SharePoint sites.
- Conducted client review and understood their requirements and current problems
- Created specification document to address common requirements including customization for specific clients, to address existing issues
- Managed impact analysis, project planning, risk analysis, disaster analysis and executive status reporting
- Responsible for system requirement, load balancing, storage requirement and expansion analysis; and recommendation to team, clients, and stakeholders
- Designed deployment, configuration, security roles, infrastructure management, database migration, backup and disaster recovery processes and tasks
- Successfully integrated an InfoPath incident reporting electronic form for different clients to report into a central depository and have their issues prioritized on our team’s calendar.
- SQL Server Integration Services (SSIS) component was used to successfully extract, transform, and load (ETL) data from outside sources like Oracle, Sybase, DB2, and Access in SQL Server Databases.
- Managed business and client expectations, internal resources, schedules, production impact, functional testing and client training, as well as, provided constant feedback on project status and deadlines; and ensured that stakeholder, sponsor, and/or client expectations were met
- Assembled Project Team, determined team member responsibilities and conducted team member reviews. Mentored and coached team members. Our development was done using Microsoft Team Foundation Server (TFS) as well as SharePoint Designer 2007.
- Successfully completed project within schedule and budget receiving an above 98% result from client satisfaction survey
Confidential, Orlando, Florida
Information Specialist Senior
Environment: Microsoft Server 2008, Microsoft SQL Server 2008, Microsoft SQL Server 2008 SSRS, SharePoint 2007, MOSS 2003, Microsoft Active Directory Server, Symantec NetBackup, Microsoft Visual Studio 2008, C#.NET, VB.NET, ASP.NET, VeriSign SSL Certificates, GoDaddy Domain Manager for DNS control.
Responsibilities:
- Worked as a SharePoint Developer responsible for design, configuring, administrating, development and deployment of SharePoint 2007 environment specifically Site Templates, Site Definitions, Taxonomy, Metadata, Content Management, Collaboration, Windows Workflow Foundation, Custom Web Parts, Reports, Search, Master Pages, Content Types, Features, Security, Single Sign On, Web Parts, Workflows, and Content Pages. The Pennsylvania Patient Safety Authority Site is an external internet facing SharePoint site.
- Conducted client reviews, requirements gathering, and understood the scope of the project from a technical viewpoint.
- Managed customer expectations, internal resources, schedules, production impact, functional testing and provided constant feedback on project status and deadlines; and ensured that stakeholder, sponsor, and/or client expectations were met
- Responsible for data warehouse extraction, transformation, and loading (ETL) of data from multiple databases (Oracle and Microsoft Access) and platform into Microsoft SQL Server 2008 Database
- Created publication process using identical production/demonstration sites to enable prototyping of changes and/or updates within the demonstration site and easy promotion to production site to minimize production risk impact